Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹22.5 L+₹56,853.65 (2.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹26.6 L
EMD Value
₹53,134
Closing Date
17 Aug 2026, 4:00 pmClosed
Xen RNB Sopore
RNB Sopore
Construction of fencing, filling of ground Community Marriage Hall along with mashing of Iron Bridge and Installation of ornamental lights at Chankhan Bridge Sopore.
2026_PWDJK_318780_1
E-Tendering NIT NO 63 /RNB/SOPORE/ 2026-27
Open Tender
Civil Works
Percentage
90 days
Sopore
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,100
Xen RNB Sopore
₹53,134
21 Aug 2026
31 Jul 2026
18 Aug 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
31 Jul 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Meshing of Iron bridge Along Side Community Marriage Hall: Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes with carriage. | - | kg | 1 | - |
| 2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work including all carriages. | - | sqm | 1 | - |
| 3 | Fencing and Filling of Community Marriage Hall on River side:Earth work in excavation in all kinds of soil by Manual/mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by site Engineer incld.cutting of trees, removal of tree stumps and dewatering of trenches during execution of work. | 1 | Cum | - | - |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge.1:3:6 or richer mix (i/c equivalent design mix) with carraige. | - | Cum | - | - |
| 5 | Supply and filling of stone soling in foundation trenches tightly hand packed with hand ramming, dressing ,watering incld. carriage of material from source to site of work complete | 1 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) including all carriages. | 1 | Cum | 1 | ₹1 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages. | 1 | Cum | 1 | ₹1 |
| 8 | Centering and shuttering including strutting propping etc. and removal of form for foundation, footings basses of columns etc . For mass concrete including all carriages. | - | sqm | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at all levels, Thermo-Mechanically Treated bars of grade Fe-500D or more, including all carriages. | 1 | kg | - | - |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:2:4 (1Cement: 2 coarse sand: 4 grade stone aggregate 20mm nominal size) including all carriages. | 1 | Cum | - | - |
stage.html
html • 0.02 MB
finance_1052409.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_1052409.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .