Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹95.5 L+₹1.4 L (1.52%)Rejected-AOC | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹1.2 Cr+₹25.3 L (26.9%)Rejected-AOC | L3 | Rejected-AOC Being L3 |
Tender Value
₹87.2 L
EMD Value
₹50,000
Closing Date
18 Jul 2023, 6:00 pmClosed
Director
Inland Navigation Directorate, Asramam, Kollam-2
GENERAL Badagara Mahe Canal Vth reach Construction of a steel foot bridge across Badagara Mahe canal at Kelothkandi thazhe at Ch. 466.600 km General Civil Work 1
2023_Irrig_570741_4
IRR/IA/TR/1689/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
540 days
Kelothkandi thazhe
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
24 Nov 2023
3 Jul 2023
20 Jul 2023
3 Jul 2023
18 Jul 2023
3 Jul 2023
Amount
Construction of Foot Bridge- Sub structure- Pile
OD3871/2022-2023:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. As per item no. 12.22 of MORTH Specifiction
OD3873/2022-2023:Bored cast-in-situ M25 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-500 mm (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap)
OD3870/2022-2023:Bored cast-in-situ M25 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-700 mm (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap)
Construction of Foot Bridge- Super structure
OD2959/2022-2023:Forming island of 10 m x 5m size at ana average height of 3.5 m etc. for fixing, staging platform and other apllainces necessary for pile drving using 150mm to 200 mm dia casuarina poles driven into the ground below bed level vertically at 1 m c/c with wailing pieces, struts and bamboo bracing at 60 cm c/c ,screening with cocunut cadjan madals and earthfilling inside etc. including all cost conveyancelabour and all other incidental charges etc and dismantling the same as directed by the departmental officers, complete as per standard specifications.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD3879/2022-2023:Chipping and removing the extra projection of R.C.C Piles to lines and levels carefully without damaging the structure including labour charges and other incidental charges and stacking the useful materials etc. complete as per the directions direction of the deptl. officers at site.(DSR 15.2.1)Rate)(Approved rate from Moozhikkal Lock Cum Bridge estimate) Details of cost for 1 cum
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
OD3897/2022-2023:Providing and laying in position machine batched and machine mixed design mix M25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Less cement used as per design mix is recoverable separately.All work upto plinth level Details of cost for 1. 00 cum
OD3898/2022-2023:Providing and laying in position machine batched and machine mixed design mix M25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Less cement used as per design mix is recoverable separately.All work above plinth level upto floor V level Details of cost for 1. 00 cum
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.23.1:Extra for plastering on circular work not exceeding 6 m in radius.In one coat
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.51.2:Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces:Two coats
OD3901/2022-2023:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position all complete. Details of cost for a truss 7.6 m
10.22:Welding by gas or electric plant including transportation of plant at site etc. complete.
10.20:Providing and fixing bolts including nuts and washers complete.
OD3930/2022-2023:Erection of newly fabricated steel bridge by lifting and leading to the riverbank,leading the one end of the steel bridge through the river by using pontoon,lifting the steel bridge to the pier in proper alignment including cost of labours,hire charges of heavy duty mobile crane etc. complete
11.20.3:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement
13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
13.50.4:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
G BALAKRISHNAN NAIR
GRACE ENTERPRISES
Bidder Name
G BALAKRISHNAN NAIR
GRACE ENTERPRISES
Shabeeb
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_864787.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .