Loading…
Loading…
Tender Value
₹41.0 L
EMD Value
₹42,000
Closing Date
21 Sept 2026, 6:00 pmClosed
Deputy Municipal Commissioner (D)
CONSTRUCTION OF ADDITIONAL M.S FABRICATION STAIRCASE FOR EMERGENCY ENTRY OR EXIT IN HEALTH CENTER, READING ROOM AND WARD OFFICE AT TPS NO.24(MOTAVARACHHA-UTRAN),TPS NO.73(UTRAN) AND TPS NO.27(UTRAN-KOSAD) IN NEW EAST (SARTHANA)ZONE, SURAT.
341554
DMC/NEZ/06/2026-2027 Work No. 05
Open
Civil Works
Works
Surat
3 documents required · 3 mandatory
₹1,770
Commissioner, Surat Municipal Corporation
₹42,000
3 Sept 2026
3 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
NAME OF WORK: CONSTRUCTION OF ADDITIONAL M.S FABRICATION STAIRCASE FOR EMERGENCY
ENTRY/EXIT IN HEALTH CENTER, READING ROOM & WARD OFFICE AT TPS No.24(MOTAVARACHHA-
UTRAN),TPS No.73(UTRAN) & TPS NO.27(UTRAN-KOSAD) IN NEW EAST (SARTHANA)ZONE, SURAT.
Description (WITHOUT G.S.T.)
Qty. Rate Unit Amount
PART A:- DEMOLITION & DISMANTLING
Demolition including stacking of serviceable materials and
1 disposal of unserviceable materials with all lead and lift (i) 11.00 1110.75 C.M.
Demolition of brick work and stone masonary including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (ii) in cement
Dismantalling tiled or stone floors laid in mortar including
3 stacking of serviceable material and disposal of unserviceable 6.00 50.11 S.M.
material with all lead and lift
Removing the scraping of old deteriosted plaster of any
thickness from wall/R.C.C. member including strcking of
serviceable material and disposal of unserviceable from site
of work with all lead and lift.
Dismantling doors, windows, ventilators etc. (wood or
steel) shutters including chowkhats architraves, hold fasts
5 and other attachment etc. complete and stacking them within 9.00 197.09 Each
all lead and lift (ii) Not exceeding 3 Sq.M in area
Dismantling steel work including distempering and stacking
the materials with all lead and lift
Paver block flooring
Disposal of Building Rubbish
PART B:- BUILDING WORKS
WORK UPTO PLINTH
Excavation for foundation includ.sorting out & stacking of
useful materials & disposing of the excavated stuff upto
mt. Lead & all lift, watering etc. Comp. (A) Loose or Soft soil-
With Manual Labour
(1) Up to 1.5 Mt. depth 30.00 212.52 C.M.
Providing & laying C.C 1:3:6 (1 cement : 3 coarse sand :6
11 crushed stone agg. 20 m.m Nominal size)& curing comp. incl. 8.00 3095.25 C.M.
cost of from work in:
Description (WITHOUT G.S.T.)
Qty. Rate Unit Amount
Providing & laying cement concrete 1:1.5:3 (1 cement :
sand :3 graded stone agg. 20 mm nominal size) & curing
comp. Includ.cost of form work but exclu. Cost of
reinforcement for reinforced concrete work in : (A)
Foundation, footing, Base of columns and Mass concrete.
Providing & fixing TMT/ CRS Bar reinforcement for R.C.C.
13 work incl. bending, binding & placing in position etc. comp. 480.00 77.29 Kg.
Filling in trenches with available excavated earth in layer
14 not exceeding 20cm in depth consolidating each deposited 7.00 136.92 C.M.
layer by ramming & watering
Providing & Applying 20mm.Th. Heavy Roller plaster on
walls or similar surfaces at all floor levels consisting of
15 mm av. Th. Backing coat of C.M. 1:3 (1 cement : 3 sand) &
mm. th. Finishing coat of C.M. 1:1 (1 cement : 1 sand)
up to plinth level 54.00 324.00 S.M.
WORK ABOVE PLINTH
Providing & construction brick work using Fly Ash bricks
having crushing strength not less than 35 Kg./sq.cm. in
superstructure in C.M. 1:6 (1 cement : 6 sand ) etc. comp.
Ground Floor 1.00 4729.83 C.M.
First Floor 1.00 5018.55 C.M.
Providing and laying polished Kota stone slab flooring over
20mm (Average) thick base of cement mortar 1:6 (1-cement :
6-coarse sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse
17 sand) laid over and jointed with grey cement slurry mixed 2.00 1019.39 S.M.
with pigment to match the shade of slab including rubbing
and polishing etc. complete. (A) 25mm thick
Providing and laying polished kota stone slab 25mm
thick in risers of steps,skirting Dedo and pillars laid on
10mm thick cement mortar 1:3 (1- Cement : 3 coarse
18 sand) and jointed with gray cement slury mixed with 1.00 1076.94 S.M.
pigment to match the shade of slab including rubbing and
polishing etc. complete.
Providing & laying granite slab 18mm thick in Window-Door
seal Frame Etc laid on 10mm thick cement mortar 1:4 (1
Cement : 4 Coarse sand) with nessary adhesive material and
finished with flush pointing in white or colour cement,
including rubbing & polishing comp.. (Basic Rate:
20 Labour Charges For Edge Finished For Granite 172.00 43.43 R.M.
Description (WITHOUT G.S.T.)
Qty. Rate Unit Amount
Providing & fixing 35mm.th. Flush Door Solid Double Core
type Both Face water proof Ply Vennered & 1.5 mm
th.laminate shall be pasted on both side with adhesives as
specified by the manufacturers. The laminate shall be as per
approved shade & texture, of make incl. Sal wood frames of
finished size 12cm x 7cm.incl. S.S. Hinges with
nessary screws & Anodized aluminum fixtures &
fastenings For all Floor
Providing & fixing M.S.Grills of required pattern to wooden
frames of windows etc. At all floor levels with M.S. flats at
required spacing & frame around square or round bars with
round headed bolts & round headed bolts and nuts or by
screws incl. Priming coat of Red lead paint etc. comp. (A)
Plain grill For all Floors
Providing & fixing in position collapsible steel shutters with
vertical channels 20 x10 x 2 mm. Braced with flat iron
diagonals 20 x5mm size with top & bottom rails of T-iron
40x40x6mm. with 38mm dia. steel pulleys comp. with bolts,
locking arrangements, stoppers, handles incl. applying a
priming coat of Redlead paint etc. comp.
Steel work welded in built up sections, framed work
including cutting, hoisting, fixing in position and applying a
priming coat of red lead paint
24 (A) in beams & joists channels angles, tees, flats with
connection plates or angle cleats as in main & cross beams,hip
& trussed purlins connected to common raffers & the like.
Providing and Fixing Hollow steel Sections Framed Work
including Cutting, Hoisting, Welding & Fixing in position
Purlin, Main Chord etc. as per Engineer- in-charge.TATA /
JINDAL / ASIAN Make
Providing and laying and casting of 12 mm dia anchor
26 fastners for bolt 5.8 grade carbon steel, zinc plated M12x160 218.00 366.00 Nos.
Etc complete as directed by engineer-in-charge.
Providing & fixing colouron galvaniced steel, zinc /
aluminium allus coated sheet 0.5 mm. thick roofing fixed
with gslvanised grom J or L hook bolts and bolt 8mm dia with
bituman and impet washer filled with white lead etc.
Excluding the cost of purlins rafter and trusses.(TATA or
Applying Priming coat over new steel and other metal
surface after over and including preparing the surface by
throughly cleaning oil, grease dirt and other foreign matter
and scoured with brushed fine steel wool, scrapers and sand
paper with ready mixed priming paint brushing red lead.
Description (WITHOUT G.S.T.)
Qty. Rate Unit Amount
Providing & applying painting two coats at all floor levels on
new steel other metal surface with Epoxy paint, brushing
interior to give an even shade incl. cleaning the surface of all
dirt, dust & other foreign matter etc. comp. (A) For All type of
steel Structure for all floor .
Providing and supplying Medium duty injection adhesive
HY200 R for Rebar fixing in Dry conditions for dia upto
32mm. Drilling hole to the required depth by rotary hammer
drill, cleaning with brush and jet of clean air, filling resin and
hardener with standard dispenser in hole and then fixing the
re-bar, The system should be made of two foils consisting of
resin and Hardener foil pack.The installation and the setting
instructions should be strictly followed as per the
manufacturers Recommendations. Reinforcements will be
paid separately. (Pull out testing upto 1% of total rebar is to
be produced by manufacturer).
(A) 8 mm dia 72.00 80.00 Nos.
(B) 10 mm dia 72.00 90.00 Nos.
TOTAL AMOUNT :-
TOTAL AMOUNT :-
EXECUTIVE ENGINEER
NEW EAST (SARTHANA) ZONE
SURAT MUNICIPAL CORPORATION
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Work No.05 Tech Bid.pdf
Work No.05 Schedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .