Tender Value
₹35.7 L
EMD Value
₹36,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Petlad Irrigation Division Petlad
Constructing box type VRB/CR in place of damaged pipe VRB/CR @ ch. 9215 m. on Manej Distry.
283431
21 of 2025-26
Open
Miscellaneous Works
Anand
8 documents required · 7 mandatory · 1 optional
₹1,500
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹36,000
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
7 Apr 2026
9 Mar 2026
Name of work :- Construction Box Type V.R.B./CR in place of damaged Pipe V.R.B/CR at
Ch.9215 m on Manej Distry.
Sr.No Quntity Item Unit Estimated Rate without GST
Without GST Rs.
In figures In World
Dismantling the existing R.C.C Pipes Rs. Eight
including sorting out and stacking of Hundred
the useful materials of the following Sixty Six &
diameters including refilling the Forty Paise
trenches etc. complete as directed. Only
NP_2 pipes. 600 mm. to 900 mm.
Dismantling the existing R.C.C Pipes Rs. One
including sorting out and stacking of Thousand
the useful materials of the following Four
2 15.00 diameters including refilling the RMT 1444.00 Hundred
trenches etc. complete as Forty Four
directed.above 1200 mm Only
Dismantalling the existing Brick Rs. Seven
masonry including sorting out and Hundred
stacking the useful material and Fifty &
3 51.00 removing the debries and making good RMT 750.90 Ninety Paise
the damages etc. comnpleted. (a) in Only
Excavation for foundation in all sorts
of soil including yellow sandy gravelly
soils ,soft & hard murrum etc. in dry
condition including depositing the Rs. One
excavated stuff in uniform layers in Hundred
3 490.00 banks or as and where directed etc. CM 107.80 Seven &
complete for lead upto 500 m and all Eighty Paise
lift. (BY MACHINERY) Only
(a) Including dewatering.
Providing & Laying in position
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate
for C.C./ R.C.C work by "FLORI"
including necessary formwork,
centering, scaffolding, compaction by
vibrator, curing as directed with all
lead & lift etc complete without
dewatering and excluding the cost of
steel reinforcement.
(A) For Footing of column / Abutment Rs. Four
/ Pier / Bottom slab of barrel / Plinth Thousand
4.a 58.00 course / Coping / Approach Slab CM 4190.00 One Hundred
etc.(a) Concrete grade M-15 and MSA- Ninety Only
(A) For Footing of column / Abutment Rs. Four
/ Pier / Bottom slab of barrel / Plinth Thousand Six
4.b 46.00 course / Coping / Approach Slab CM 4651.00 Hundred
etc.(e) Concrete grade M-25 and MSA- Fifty One
(B) For Pier and Abutments / Wing Rs. Four
wall / Head wall / Return wall / Dowel Thousand
Wall etc.(g) Concrete grade M-15 and Four
4.c 100.00 MSA-20 mm CM 4457.00 Hundred
(E) For Column / Beam / Solid Slab of Rs. Five
Road Bridge / Barrel / Cutoff wall etc. Thousand Six
4.d 60.00 (q) Concrete grade M-25 and MSA-20 CM 5642.00 Hundred
(D) For Kerb / Wearing coat. Rs. Five
(n) Concrete grade M-25 and MSA -10 Thousand
4.e 10.00 CM 5481.00 Hundred
(F) For Parapet wall of Road Bridge / Rs. Eight
Structure. Thousand
4.f 2.00 (t) Concrete grade M-25 and MSA -10 CM 8023.00 Twenty Three
Providing & Placing in position Rs. Eighty
reinforcement bars including cutting, Two
bending, welding joints where Thousand
necessary, hooking etc. complete as Ninteen Only
per drawing for all lead and lifts.
(B) TMT / CRS bars
Providing and fixing 110 mm diameter Rs. Three
P.V.C..Pipe (6 kgf / sq cm) Water spout Hundred
6 4.00 with necessary iron grating as per Rmt. 369.20 Sixty Nine &
design Twenty Paise
Providing and laying in position 110 Rs. Two
mm dia (6 kgf/sq cm) P.V.C. Pipe for Hundred
weep holes with non corroding jali in Sixty Two &
7 6.00 abutments, wing walls, retaining walls Rmt. 262.50 Fifty Paise
etc. complete. Only
Providing & Laying in position
"NOMINAL MIX" cement concrete
using cement, sand and crushed
aggregate by mass and machine mix
for C.C./R.C.C work incl. necessary
formworks centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete Without Dewatering and
excluding cost of steel reinforcement.
(A) For Foundation concrete / General Rs. Three
purpose Thousand
(a) C. C. Nominal Mix, M-10 and MSA- Three
8 107.00 40 mm CM 3346.00 Hundred
Providing temporary all weather and Rs. One Lac
fair weather diversion suitable for Fifteen
traffic during the construction period Thousand
of the bridge including providing Five Hundred
necessary drains and all safty Two Only
9 1.00 measures including red lamps/ signals No. 115502.00
at night for traffic etc. complete.
Back filling the foundation trenches Rs. Thirty Six
around the structures etc with & Ninety
selected excavated stuff including Paise Only
10 75.00 watering, ramming, compacting etc. CM 36.90
complete. (By Machinery)
Providing & Fixing M.S. Gate of leaf Rs. One Lac
Size 1.40 x 1.80 mt for DIstry Thirty Six
including Overhauling and oiling Thousand
greasing of CR/HR gates etc comp as Four
directed for New steel gate including Hundred
providing basic steel material; M.S. Twenty Eight
Shaft plate, angles, channels etc.& Only
11 4.00 Fixing Threaded rod Shaft of Specified No. 136428.00
Dia.& Fixing Heavy duty nut and
bearing incl. fabrication transporting
to site & erection and painting etc. all
Providing and laying plain/reinforced Rs. Four
cement concrete lining of M 15 (MSA Hundred
20 mm) in bed, side slopes and Fifteen &
curvature including batching, mixing, Eighty Paise
transporting, placing, vibrating, Only
smooth finishing, curing including
12 188.00 dewatering where SM 415.80
required.(MACHINERY BASED by
"FLORI" - WITHOUT PAVER WATER
10 cm thick lining in Bed / Slope
Total Rs…(Without GST)
Rs. Thirty Five Lac Seventy Four Thousand Four Hundred Eighty One & Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or
as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be
filled in inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt
= Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24
Techanically Checked By me…................
Arithmetically Checked By me….....................
Deputy Executive Engineer Divisional Account Officer
Petlad Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Name of Construction Box Type V.R.B./CR in place of damaged Pipe V.R.B/CR at Ch.9215 m
Work:- on Manej Distry.
CEMENT CONSUMPTION
Sr No. Item Description Quantity Unit consumptio Total Cement M.T.
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as directed with all
lead & lift etc complete without dewatering and excluding the
cost of steel reinforcement.
(A) For Footing of column / Abutment / Pier / Bottom slab of
4.a barrel / Plinth course / Coping / Approach Slab etc.(a) Concrete 58.00 Cum 0.30
grade M-15 and MSA-20 mm
(A) For Footing of column / Abutment / Pier / Bottom slab of
4.b barrel / Plinth course / Coping / Approach Slab etc.(e) Concrete 46.00 Cum 0.38
grade M-25 and MSA-20 mm
(B) For Pier and Abutments / Wing wall / Head wall / Return
4.c wall / Dowel Wall etc.(g) Concrete grade M-15 and MSA-20 100.00 Cum 0.30
(E) For Column / Beam / Solid Slab of Road Bridge / Barrel /
4.d Cutoff wall etc. 60.00 Cum 0.38
(q) Concrete grade M-25 and MSA-20 mm
(D) For Kerb / Wearing coat.
(n) Concrete grade M-25 and MSA -10 to 20mm
(F) For Parapet wall of Road Bridge / Structure.
(t) Concrete grade M-25 and MSA -10 to 20 mm
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by mass
and machine mix for C.C./R.C.C work incl. necessary
2 8 formworks centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel reinforcement.
(A) For Foundation concrete / General purpose
(a) C. C. Nominal Mix, M-10 and MSA-40 mm 107.00 Cum 0.22
Providing and laying plain/reinforced cement concrete lining of
M 15 (MSA 20 mm) in bed, side slopes and curvature including
batching, mixing, transporting, placing, vibrating, smooth
3 12 finishing, curing including dewatering where 188.00 SM 0.03
required.(MACHINERY BASED by "FLORI" - WITHOUT
PAVER WATER CURING)
10 cm thick lining in Bed / Slope
Section Officer Deputy Executive Engineer
Petlad-1 Section Petlad Irrigation Sub Division
Percentage Calculation
Name of work :- Construction Box Type V.R.B./CR in place of damaged Pipe V.R.B/CR at Ch.9215 m on Manej Distry.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost
Sr. Estimated but according to Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more estimated Rs. Unit Cost Per Unit
Dismantling the existing R.C.C Pipes
including sorting out and stacking of the
useful materials of the following
etc. complete as directed. NP_2 pipes.
Dismantling the existing R.C.C Pipes
including sorting out and stacking of the
useful materials of the following
etc. complete as directed.above 1200 mm
Dismantalling the existing Brick masonry
including sorting out and stacking the
useful material and removing the debries
comnpleted. (a) in cement mortar.
Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry
condition including depositing the
excavated stuff in uniform layers in
complete for lead upto 500 m and all lift.
(a) Including dewatering.
Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C
work by "FLORI" including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc complete
without dewatering and excluding the
cost of steel reinforcement.
(A) For Footing of column / Abutment /
Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.(a)
Concrete grade M-15 and MSA-20 mm
(A) For Footing of column / Abutment /
Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.(e)
Concrete grade M-25 and MSA-20 mm
(B) For Pier and Abutments / Wing wall /
Head wall / Return wall / Dowel Wall
(E) For Column / Beam / Solid Slab of
Road Bridge / Barrel / Cutoff wall etc.
(D) For Kerb / Wearing coat.
Percentage Calculation
Name of work :- Construction Box Type V.R.B./CR in place of damaged Pipe V.R.B/CR at Ch.9215 m on Manej Distry.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost
Sr. Estimated but according to Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more estimated Rs. Unit Cost Per Unit
(F) For Parapet wall of Road Bridge /
Providing & Placing in position
reinforcement bars including cutting,
bending, welding joints where necessary,
all lead and lifts.
(B) TMT / CRS bars
Providing and fixing 110 mm diameter
P.V.C..Pipe (6 kgf / sq cm) Water spout
4.00 with necessary iron grating as per design 369.20 Rmt. 1476.80 78.4 313.6 0 0 0 0 0 0 0 0 3.18 12.72 287.62 1150.48 369.20
Providing and laying in position 110 mm
dia (6 kgf/sq cm) P.V.C. Pipe for weep
holes with non corroding jali in
abutments, wing walls, retaining walls
Providing & Laying in position "NOMINAL
MIX" cement concrete using cement,
sand and crushed aggregate by mass and
machine mix for C.C./R.C.C work incl.
necessary formworks centering,
scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete Without Dewatering and
excluding cost of steel reinforcement.
(A) For Foundation concrete / General
(a) C. C. Nominal Mix, M-10 and MSA-
Providing temporary all weather and fair
weather diversion suitable for traffic
during the construction period of the
bridge including providing necessary
red lamps/ signals at night for traffic etc.
Back filling the foundation trenches
around the structures etc with selected
excavated stuff including watering,
ramming, compacting etc. complete. (By
Percentage Calculation
Name of work :- Construction Box Type V.R.B./CR in place of damaged Pipe V.R.B/CR at Ch.9215 m on Manej Distry.
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost
Quantity Item Rate Unit Total amount Labour Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL cost Total Item Cost
Sr. Estimated but according to Rs. Per Cost Per Unit Cost Unit Cost Per Unit Bitumen Cost Unit y Per Unit Machinery Comodity Comodity Cost per Unit
No. may be more estimated Rs. Unit Cost Per Unit
Providing & Fixing M.S. Gate of leaf Size
1.40 x 1.80 mt for DIstry including
Overhauling and oiling greasing of
CR/HR gates etc comp as directed for
New steel gate including providing basic
steel material; M.S. Shaft plate, angles,
channels etc.& Fixing Threaded rod Shaft
of Specified Dia.& Fixing Heavy duty nut
and bearing incl. fabrication
transporting to site & erection and
painting etc. all complete.
Providing and laying plain/reinforced
cement concrete lining of M 15 (MSA
mm) in bed, side slopes and curvature
including batching, mixing, transporting,
placing, vibrating, smooth finishing,
curing including dewatering where
"FLORI" - WITHOUT PAVER WATER
10 cm thick lining in Bed / Slope
Signature of Contractor Deputy Executive Engineer Executive Engineer
Petlad Irrigation sub Division Petlad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 21 of 2025-26 online.pdf
1.front page.pdf
3.Notice Inviting tender.pdf
4. SBD 9215.pdf
5. Itemwise specification.pdf
6. schedule B 9215 manej distry.pdf
Download all tender documents and submit your bid