Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.1/225/2025 dtd.329.08.2025 of New Mahe GP | |
| 2 | L2₹16.9 L+₹50,692.75 (3.09%)Rejected-Finance | L2 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | Vijayan A L2 | SHIHABUDEEN POTHANGODU L1 |
|---|---|---|---|---|---|
| 1.00Taring | |||||
| 1.00 | 2.14.2.A:Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (II) By Mechanical Means (A) Bituminous Courses | 12.51 | cum | 424.2 ₹5,305.05 | 411.47 ₹5,145.84 Lowest |
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 151.8 | sqm | 14.94 ₹2,267.89 | 14.49 ₹2,199.58 Lowest |
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 111.66 | cum | 65.97 ₹7,366.21 | 63.99 ₹7,145.12 Lowest |
| 1.00 | OD40034/2025-2026:Granular sub-base/base/surface course with departmental supply material(Table 400.13) by mix in place method normal. Construction of granular sub-base by using departmental supply material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 11.38 | cum | 190 ₹2,163.15 | 184.43 ₹2,099.74 Lowest |
| 1.00 | 4.1.A.2:Granular Sub-base with Well Graded Material (Table 400.1)(A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material | 64.67 | cum | 3,170.13 ₹2,04,996.46 | 3,075.03 ₹1,98,846.81 Lowest |
| 1.01 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 169.16 | cum | 3,504 ₹5,92,719.12 | 3,399.46 ₹5,75,035.66 Lowest |
| 1.01 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,182.9 | sqm | 80.21 ₹94,880.41 | 77.8 ₹92,029.62 Lowest |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,182.9 | sqm | 18.76 ₹22,191.2 | 18.2 ₹21,528.78 Lowest |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 257.4 | sqm | 15.65 ₹4,028.31 | 15.18 ₹3,907.33 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,332
Closing Date
23 Aug 2025, 4:00 pmClosed
SHILPA JUSTUS
Assistant Engineer Officer,LIDEW Section
LRRP 2024 25 Thalassery LAC Sl No 1810 Punnol Railway Gate New Mahe Panchayath Industrial UnitRoad New Mahe GP Kannur District Punnol Railway Gate New Mahe Panchayath Industrial Unit Road Retarring
2025_LSGD_778136_21
AE/LID EW/T03/NMGP/2025-26
Open Tender
Civil Works - Roads
Item Rate
120 days
NEW MAHE GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,332
Yes
4 Oct 2025
16 Aug 2025
25 Aug 2025
16 Aug 2025
23 Aug 2025
16 Aug 2025
Amount
Taring
2.14.2.A:Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (II) By Mechanical Means (A) Bituminous Courses
3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
OD40034/2025-2026:Granular sub-base/base/surface course with departmental supply material(Table 400.13) by mix in place method normal. Construction of granular sub-base by using departmental supply material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
4.1.A.2:Granular Sub-base with Well Graded Material (Table 400.1)(A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD35992/2025-2026:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC : 67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting , 2mm thick/aluminium composite material sheeting 4mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB-2 nos confirming to IS1239 firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete min size 40cm x40cm x60cm below ground level including painting all exposed surface with 2 coat of epoxy painting over epoxy primer and as per approve drawing and clause 801 including lettering and symbols etc. (Derived from MORD spec 10.3.A.2)
Vijayan A (BID ID -2301722)
Bidder Name
Vijayan A
SHIHABUDEEN POTHANGODU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .