| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49,950Qualified 100 KOLHU PANI KOLHU PANI KOLHU PANI DEHRADUN UTTARAKHAND 248007 UDYAM UK 05 0009276 | DEHRADUN | UTTARAKHAND | 248007 | L1 | Qualified | |
| 2 | L2₹57,000+₹7,050 (14.1%)Qualified 0 PONDHA PREMNAGAR PONDHA PREMNAGAR DEHRADUN DEHRADUN UTTARAKHAND 248007 UDYAM UK 05 0022632 | DEHRADUN | UTTARAKHAND | 248007 | L2 | Qualified | |
| 3 | L3₹62,500+₹12,550 (25.1%)Qualified | L3 | Qualified | |
| 4 | L3₹62,500+₹12,550 (25.1%)Qualified 0 NAWADA SIRSHA ROAD BUDAUN BUDAUN UTTAR PRADESH 243601 | BUDAUN | UTTAR PRADESH | 243601 | L3 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
14 Jul 2025, 3:00 pmClosed
Register (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 1 Bid Number : GEM/2025/B/6446411 Dated : 12-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Quality Assurance Plan document 1752310263.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Garrison Engineer GE IMA Dehradun
Department of Defence
Armed Forces Tribunal
Ministry of Defence (Shubham Prakash) Splitting 2/7
8081873
GEM/2025/B/6446411
Two Packet Bid
Register (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
15 days
Dehradun, Uttarakhand
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
12 Jul 2025
12 Jul 2025
14 Jul 2025
Register (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 1 Bid Number : GEM/2025/B/6446411 Dated : 12-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Quality Assurance Plan document 1752310263.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Garrison Engineer GE IMA Dehradun
Department of Defence
Armed Forces Tribunal
Ministry of Defence (Shubham Prakash) Splitting 2/7
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8081873.pdf
GEM_BID
1752310263.pdf
OTHER
Samplefile_6ac0893f-ae1c-4300-9e3a1752310659590_BSOGE24.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .