Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC 225 4 DR A K PAUL ROAD KOLKATA 700034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹14.7 L+₹19,200 (1.33%)Rejected-Finance | L2 | Rejected-Finance 2ND LOWEST BIDDER | |
| 3 | L3₹14.8 L+₹26,200 (1.81%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST BIDDER | |
| 4 | Rejected-Technical SADAR PARA PS PURULIA T DIST PURULIA PIN 723101 W B | PURULIA | PURULIA | WEST BENGAL | 723101 | - | Rejected-Technical Inappropriate Credential, P Tax Certificate Not Found |
| Sl No | Description | Qty | Unit | P.S.Enterprise L1 | Master Electric L3 | Dcon Enterprise L2 |
|---|---|---|---|---|---|---|
| 1.00Supply, installation, testing & commissioning of 20 kVA / 20 kW Online UPS including Battery Bank of Minimum 20160VAH or higher for 30 minutes backup with required nos. of rack units (U) for installation of Battery Banks and UPS system or Complete set with self-standing cubicle or cabinet (Make:- Delta/Numeric/Emerson/APC) Phase: 3-Phase Input / 3-Phase Output. Technology: DSP-Controlled IGBT Rectifier, True Online UPS. Transformer: With an inbuilt or external isolation transformer. Redundancy: Supports (1+1) Parallel Redundant Configuration (PRS). Battery Bank: Option for a common battery bank when in PRS mode. a) UPS Type: True Online Double Conversion with DSP Control b) Input Power Factor: Greater than 0.95 c) Redundancy Capability: Yes – can be operated in 1+1 PRS mode d) Battery Configuration: Supports both independent and common battery bank operation in PRS mode. Input Specifications:- Voltage Range: 305 V to 477 V AC (for 100% load) Frequency Range: 45 Hz to 65 Hz Power Factor: Greater than 0.98 at full load Total Harmonic Distortion (THDi): Less than 10% on full resistive load (when mains THDu is below 1%) Input Protection: Built-in single-pole MCB (1P MCB) suitable for full-rated UPS capacity. | ||||||
| 1.01Output Voltage:- 15 V AC ±1% Voltage Distortion:- ≤ 3% (Resistive Load), ≤ 5% (Resistive + Capacitive + Inductive Load - RCD); Crest Factor:- Minimum 3:1 on full load Short Circuit Protection:- Electronic / Fused Maintenance Bypass:- Built-in manual bypass Overall Efficiency (AC to AC) > 90% (on full load) ECO Mode Efficiency > 95% (on full load) Overload Capacity:- 125% for 10 minutes; 150% for 60 seconds Display:- LCD & LED display required Battery Backup:- Parameter:- Specification Backup Time: 30 minutes Battery Bank Voltage: 480 V DC, Battery Bank VAH:- Minimum 20160VAH for 30 minutes backup Approved Battery Makes:- Amara Raja / Exide Number of Battery Banks:- Single bank Battery Bank Voltage:- 480 V DC | ||||||
| 1.02 | Communication & Control Features:-
Serial Communication Ports : RS232 Port & USB Port
REPO (Remote Emergency Power OFF) Port:- Required
Cold Start Capability:- Required
Automatic Restart Facility:- Required,
Operating Temperature:- 0 - 40 °C,
Operating Humidity: 0% ~ 95% RH (No Condensing)
Manufacturer Should have:-
ISO 9001: 2008, ISO 14001: 2004, ISO 45001,
Product Safety Certifications(Mandatory):-
EN 50091-2:1995,Class A, ESD:IEC61000-4-2: Level4,
RS : IEC61000-4-3: Level3 EFT: IEC61000-4-4:Level4
SURGE: IEC61000-4-5:Level4
CS: IEC61000-4-6: Level3
Conducted Magnetic Field:IEC61000-4-8: Level3
CE declaration of conformity.
Warrenty : 3 Years On-site Warrenty on UPS and Battery [OEM authorization is required during Bid submission as well as during execution at site] | 2 | Set | 6,79,860 ₹13,59,720 Lowest | 6,95,000 ₹13,90,000 | 6,90,000 ₹13,80,000 |
| 2.00 | Supplying and Drawing 1.1 KV single core stranded 'FR' PVC insulated & unsheathed single core stranded copper wire (Brand approved by EIC) of the following sizes in the prelaid polythene pipe and by the prelaid GI fish wire and making necy. connection as required
4x126/0.4 (16 sqmm) + 2x80/0.4 (10 sqmm) as ECC | 60 | Mtr | 1,488 ₹89,280 | 1,420 ₹85,200 Lowest | 1,470 ₹88,200 |
| 3.00Special Terms & Condition: a) The Agency must procure the materials from the Manufacturer / OEM or from their authorised sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them. b) Documents that authenticates such procurement from the Manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the Manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-Charge during Bid submission period and hard copy of it to be submitted during execution, of work/submission of bill. c) If any refurbished material is supplied and installed, penal action will be taken as per existing rules | ||||||
Tender Value
Refer Docs
EMD Value
₹30,465
Closing Date
26 Jul 2025, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE,SWEC,PWD
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound,Midnapore,Paschim Medinipur
Electrical Installation work for vertical extention of Metallurgical Building as Computer Laboratory at Purulia polytechnic in the District of Purulia---SITC of UPS system.
2025_WBPWD_875815_1
WBPWD/SE/SWEC/NIQ20/2025-26
Open Tender
ELECTRICAL WORKS ORG
Item Rate
15 days
PURULIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹30,465
OFFICE OF SE, SWEC, PWD MIDNAPORE
27 Oct 2026
11 Jul 2025
28 Jul 2025
11 Jul 2025
26 Jul 2025
14 Jul 2025
14 Jul 2025
Amount
Supply, installation, testing & commissioning of 20 kVA / 20 kW Online UPS including Battery Bank of Minimum 20160VAH or higher for 30 minutes backup with required nos. of rack units (U) for installation of Battery Banks and UPS system or Complete set with self-standing cubicle or cabinet (Make:- Delta/Numeric/Emerson/APC) Phase: 3-Phase Input / 3-Phase Output. Technology: DSP-Controlled IGBT Rectifier, True Online UPS. Transformer: With an inbuilt or external isolation transformer. Redundancy: Supports (1+1) Parallel Redundant Configuration (PRS). Battery Bank: Option for a common battery bank when in PRS mode. a) UPS Type: True Online Double Conversion with DSP Control b) Input Power Factor: Greater than 0.95 c) Redundancy Capability: Yes – can be operated in 1+1 PRS mode d) Battery Configuration: Supports both independent and common battery bank operation in PRS mode. Input Specifications:- Voltage Range: 305 V to 477 V AC (for 100% load) Frequency Range: 45 Hz to 65 Hz Power Factor: Greater than 0.98 at full load Total Harmonic Distortion (THDi): Less than 10% on full resistive load (when mains THDu is below 1%) Input Protection: Built-in single-pole MCB (1P MCB) suitable for full-rated UPS capacity.
Output Voltage:- 15 V AC ±1% Voltage Distortion:- ≤ 3% (Resistive Load), ≤ 5% (Resistive + Capacitive + Inductive Load - RCD); Crest Factor:- Minimum 3:1 on full load Short Circuit Protection:- Electronic / Fused Maintenance Bypass:- Built-in manual bypass Overall Efficiency (AC to AC) > 90% (on full load) ECO Mode Efficiency > 95% (on full load) Overload Capacity:- 125% for 10 minutes; 150% for 60 seconds Display:- LCD & LED display required Battery Backup:- Parameter:- Specification Backup Time: 30 minutes Battery Bank Voltage: 480 V DC, Battery Bank VAH:- Minimum 20160VAH for 30 minutes backup Approved Battery Makes:- Amara Raja / Exide Number of Battery Banks:- Single bank Battery Bank Voltage:- 480 V DC
Communication & Control Features:- Serial Communication Ports : RS232 Port & USB Port REPO (Remote Emergency Power OFF) Port:- Required Cold Start Capability:- Required Automatic Restart Facility:- Required, Operating Temperature:- 0 - 40 °C, Operating Humidity: 0% ~ 95% RH (No Condensing) Manufacturer Should have:- ISO 9001: 2008, ISO 14001: 2004, ISO 45001, Product Safety Certifications(Mandatory):- EN 50091-2:1995,Class A, ESD:IEC61000-4-2: Level4, RS : IEC61000-4-3: Level3 EFT: IEC61000-4-4:Level4 SURGE: IEC61000-4-5:Level4 CS: IEC61000-4-6: Level3 Conducted Magnetic Field:IEC61000-4-8: Level3 CE declaration of conformity. Warrenty : 3 Years On-site Warrenty on UPS and Battery [OEM authorization is required during Bid submission as well as during execution at site]
Supplying and Drawing 1.1 KV single core stranded 'FR' PVC insulated & unsheathed single core stranded copper wire (Brand approved by EIC) of the following sizes in the prelaid polythene pipe and by the prelaid GI fish wire and making necy. connection as required 4x126/0.4 (16 sqmm) + 2x80/0.4 (10 sqmm) as ECC
Special Terms & Condition: a) The Agency must procure the materials from the Manufacturer / OEM or from their authorised sales channel so that the standard warranty / support of the Manufacturer / OEM becomes applicable to the products to be delivered and installed by them. b) Documents that authenticates such procurement from the Manufacturer / OEM or from their authorized sales channel and standard warranty / support should be sent from the e-mail of the Manufacturer / OEM / authorized sales channel to the e-mail of Engineer-in-Charge during Bid submission period and hard copy of it to be submitted during execution, of work/submission of bill. c) If any refurbished material is supplied and installed, penal action will be taken as per existing rules
Dcon Enterprise (BID ID -6749915)
Master Electric (BID ID -6750235)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .