Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 Cr+₹1.4 L (0.73%)Rejected-AOC | ₹2.0 Cr+₹1.4 L (0.73%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2 Cr+₹2 L (1.01%)Rejected-AOC 28 2917 AISWARYA PONNETH TEMPLE ROAD KADAVANTHRA KOCHIN 682020 | KOCHIN | ERNAKULAM | KERALA | 682020 | ₹2 Cr+₹2 L (1.01%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.1 Cr+₹8.0 L (4.02%)Rejected-Finance | ₹2.1 Cr+₹8.0 L (4.02%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.1 Cr+₹15.2 L (7.66%)Rejected-Finance | ₹2.1 Cr+₹15.2 L (7.66%) | L5 | Rejected-Finance L5 |
Tender Value
₹2.7 Cr
EMD Value
₹1 L
Closing Date
22 Aug 2024, 5:30 pmClosed
MD, INKEL Limited
First Floor, Ajiyal Complex, Kakkanad - 682030
Supply and Installation of 500kWp Solar System
2024_INKEL_684146_1
NIT/INKEL/KIIFB/2024-25/158 dated 05/08/2024
Open Tender
Solar Power Plants
Item Rate
180 days
Kalamassery
As per tender document
10 documents required · 10 mandatory
₹8,850
₹1 L
4 Dec 2024
5 Aug 2024
23 Aug 2024
5 Aug 2024
22 Aug 2024
8 Aug 2024
Amount
SOLAR SYSTEM - 500 KwP
Supply,Installation,Testing and Commissioning of 500 kWp ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Monocrystalline PERCsolar PV Modules,net metering facility, necessary protections, earthing,mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a)Solar photovoltaic Module of capacity 545Wp or above, manufactured in India, conforming to IS14286/IEC61215,IS/IEC61730 Part-1, IS/IEC61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than19%. PVmodules used in solar power plants / systems must be warranted for their output peak watt capacity,which should not be less than 90% at the end of 10years and 80% at the end of 25years.b)Power Conditioning Unit(PCU) of 400VAC,three phase,4wire,50Hz+/-2.5Hz,output voltage suitable to generate AC Power with efficiency not less than 97%,total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data monitoring System complete with accessories. d)Fixing of array junction box & Main junction box with IP65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1kV grade armoured power and control cables between solar modules,main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/ conduit lugs and other accessories etc.as required.
EVEREST AGENCIES
TCM LIMITED
SOLGEN ENERGY PVT LTD
INKEL RENEWABLE ENERGY PRIVATE LIMITED
BNK ENERGY ALTERNATIVES
Bidder Name
BNK ENERGY ALTERNATIVES
RENQ Power Solutions India Pvt. Ltd.
EVEREST AGENCIES
SOLGEN ENERGY PVT LTD
TCM LIMITED
INKEL RENEWABLE ENERGY PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .