Construction of New Paver block and repairing work at Ghodasar Area & other area and different locations from municipal councilor budget and other budget of Isanpur ward of South Zone.
278614
tender notice no 18/2025-26 tn no : 801
Open
Civil Works - Others
Works
Ahmedabad
5 documents required · 5 mandatory
₹900
Yes
municipal commissioner
₹9,994
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
5 Estimated Cost put to Rs.9,99,301.72
6 Earnest Money Deposit Rs.9,994/-Demand Draft Or Bank Guarantee in favor of Municipal
Commissioner, Ahmedabad to be submitted as prescribed in tender.
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand Draft in
favor of Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
8 Tender fees Rs.900/-Demand Draft in favor of Municipal Commissioner, Ahmedabad)
(Non refundable)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with Tender
Tender Fees as described in the invitation of tender and submitted to Assistant
Manager(South zone), South zone office, Rambaug, Maninagar
10 Last date of online Online submission shall be on Dt. 02.03.2026up to 18.00 hours only. The
submission of Tenders. tenders received after this date and time will not be entertained under any
11 Last date of submission Physical tender documents with EMD and Tender fee without price bid
of Physical documents can be submitted up to Dt. 03.03.2026 up to 16.00 hours.
for the Tenders.
12 Date of Opening of Dt. 03.03.2026 up to 17.00 hours.at Asst. Manager, Admin Department,
Technical bid Shymaprasad Mukherji bhawan, Near Maninagar Fire Brigade,
Maninagar, Ahmedabad Municipal Corporation, Ahmedabad.
13 Mode of sending the Document shall be submitted in sealed envelope systems By RPAD/Speed
TenderDocuments post/ Hand Delivery in sealed covers in Duplicate ( One Original & One
Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at this own
expenses any defect which may developed or may be noticed before the
period mentioned here under from the certified date of completion, The
within 15 days of receipts of the notice. In the case of failure on the part of
the contractor, the Engineer in charge may rectify or remove or re-execute
the work at the risk & cost of the contractor. The Engineer in charge shall
be entitled to appropriate the whole or any part of the amount of security
deposit towards they expenses, If any, incurred by him in rectification,
removal or re- execution. The defect liability period shall be as under (a)
for all works costing up to Rs. 50,000 (amount put to tender), the period
shall be three months from the certified date of completion. (b) for all
workscosting more than Rs. 50,000 and up to Rs. 1 crore (Amount put to
tender) ,the period shall be six (6) month from the certified date of
completion or one monsoon , which ever letter.(c) the major project
costing more than Rs. 1 crore , the period shall be 12 months from the
certified date of completion which should include one monsoon.(d) For
building works , the period specified in (a) ,(b) & (c) above or elapse of
monsoon period following certified date of completion,whichever is letter
. For the purpose of deciding the monsoon period, the 30 September may
be treated as the last date.
16 Compensation for Delay 0.1% per day delay of remaining work after the completion date but not
more than 10% of cost of remaining works.
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from each RA
Money from each RA bill. It will be released along with release of payment of Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 For E.P.F. Act. As per Account department circular no.37, date-09/08/2018
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-2022. The
Rates are Exclusive of GST. Prevailing GST will be paid separately.
21 Special Note Contractor shall deploy labours and materials at immediate basis in
case of any emergency work when conveyed by the staff via any way
of communication. Failing the same shall permit the staff to allot the
same work to another contractor and shall impose the penalty to the
approved contractor.
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any or all the
tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEER DEPARTMENT
TECHN ICAL SPECIFICATION
Name of Work:Construction of New Paver block and repairing work at Ghodasar Area & other area and
different locations from municipal councilor budget and other budget of Isanpur ward of
Dismantling the following including loading, unloading and disposal of unserviceable material
for all leador as directed by Engineer-In-Charge and stacking the serviceable material and
backfilling the resultingtrenchesandpitscomplete.
a. centralverge-kerbstone.
b. Dismantling tiled orstonefloorslaid in mortarincludingstackingof serviceable
materialanddisposalof unserviceablematerial withall leadandlifts.
c. Demolition&disposalofunserviceablematerialwithallleadandliftforunreinforcedc
d. Demolitionofbrickwork&stonemasonryincludingstackingofserviceablematerials
anddisposalof unserviceablematerials withallleadandlift(1)Incementmortar.
e. Demolitionincludingstackingofserviceablematerialsanddisposalofunserviceable
materials withall leadandlift.(I)R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or
shown in thedrawings. Demolition implies taking up or down or breaking up. This shall consist
of demolishing whole orpartofwork includingall relevant
itemasspecifiedorshowninthedrawings.
The demolition shall always be planned before hand and shall be done in reverse order of the
one in whichthe structurewas constructed.Contractor isfullyresponsibleforproper
andsafedemolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work orproperty, which is to be left intact, before dismantling and demolishing is
taken up and the work shall becarriedoutinsuchawaythat nodamagesis caused
totheadjoiningproperty.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shallbetakentokeepthedustnuisancedownas andwherenecessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged bydropping from a height or demolishing roof, masonry etc. shall be carefully
dismantled first. The dismantledarticlesshall beproperlystackedasdirected.
All materials obtained from demolition shall be the property of Government unless otherwise d
shall be keptinsafecustodyuntil handedover totheEngineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out
and stackedproperly as directed, with all lead and lift. All unserviceable materials, rubbish etc.
shall b stacked as directedbytheEngineer-in-charge.
Oncompletionofwork,the siteshallbeclearedofalldebrisrubbishandcleanedasdirected.
Modeof measurements&payment :
Measurementsofallworkexcepthiddenworkshallbetakenbeforedemolitiondismantlingandnoall
owanceforincreaseinbulkshallbeallowed.Thedemolitionoflimeconcreteshallbemeasuredundert
his item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed forconstructionofwork.
All work shall be measured in decimal system as fixed in its place subject to the following
limits, unlessotherwise stated hereinafter : (a) Dimensions shall be measured to the nearest
0.01 mt. (b) Area shall beworked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall
be worked out to the nearest 0.01Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling
includingscaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materialsproperly and disposing the unserviceable materials with all lead and lift.
The rate also includes for temporarystoringfor the safety of the portion not required to be
pulled down or of adjoining property and providingtemporaryenclosures
orpartitionswhereconsiderednecessary.
The rate shall be for a unit of one cubic
metre.ForDismantlingofTiledFloor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid
on mortarsshall be done Dismantling implies carefully taking up or down or these are fixed by
nail screws bolts etc. theshall betakenout with proper tools.
Modeof measurement &Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate
shall includestackingthe unserviceablematerials asdirectedwill leadandlift.
The rate shallbefora unitof(a)RMT(b)one sq.Meter(C)CMT
Excavation of asphalt pavement of any thickness with all sub layer including demolishing the
asphaltcarpet, metal, soiling using any type of road cutter and breaker machine (controlled
cutting) including costof
operator,fuel,&transportationetccompletewithstackingthematerialasdirected.
1. This specification covers the scope of cutting and breaking the asphalt, concrete roads,
paths etc. andmakinggoodtoitsoriginalcondition.
2. Wherever cutting is done across public paths, roads etc. the orders of materials excavated
shall bepreserved in well manner and reinstatement shall be done in the same order and
road brought to theoriginalcondition.Thecontractorshallmade upfor any
deficiencyin/materialathisowncost.
3. The cutting of road and paved yard shall be done as directed by the E-I-C, Ramming the sub-
grade forpiping work. The soling stones, spreading the metals to required thickness and
making water bound withstonedust/murrum asperrequirementshallbe
reinstatedtotheoriginalconditionathisowncost.
4. Therate includesfor
Cuttingasphaltroad,waterboundmacadamandsolingandstackingusablematerialatsite.
Ramming sub-gradefor layingpipelineandmakingasphaltroad in original condition
aftercompletionofwork.
Labor,materials,toolsandplantsusedtocompletethe work.
5. The measurementshallbe forunit square meter. Thecutting portion shallbe measured for
itslengthandbreadth.
6. The rate includes tools, plants and equipments wherever necessary for cutting the
bituminous roadsurface up to required depth to fix the kerb and similar precast elements as
per specifications includingsorting the dismantled material, disposal of unserviceable
material and stacking the serviceable materialwithall lifts/depthandleads as
directedbyengineerincharge.
ThemeasurementshallbeinSqmtforbituminousroadsurface.
(A) Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged
brick worknd repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps andremovingmanholecoveranddebrisfromMH andcartingthesameasdirected.
(A) upto0.15mt.(@TwoCoarse)
(B) upto0.35mt.(@FourCoarse)
Relevant specification shall be followed as per item description : Repairing damaged M.H. and
uptoroadlevelincl.removingdamagedbrickworkandrepairingbybrickmasonryinC.M.1:5andplast
C.M.1:3andfixingC.I.stepsandexistingMHsheetcover,removingthedebrisfromMHandcartingthesame
Themeasurementshall beinNos. basisManhole.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in
C.M. 1:5and plaster in C.M. 1:3 and fixing C.I. steps and removing existing chamber sheet cover,
removing thedebrisfromchamberandcartingthesameasdirected.
Relevant specification shall be followed as per item description : Repairing damaged I.C./
Raising removingdamaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. stepsandexistingchambersheetcover,removingthedebrisfrom
chamberandcartingthesameasdirected.
ThemeasurementshallbeinNos.basisofI.C.
Conveyancechargeofearth,lime,murrum,buildingrubbish,manure,garbage,sludge,excavatedrock,flyas
h,aggregatesof anykindIncludingspreading&levellingetc.complete.
• (e)Lead From4Kmto5Km
• (f)LeadFrom 5Kmto10Km
• (g)LeadFrom10Kmto15Km
Disposalofearth,lime,murrum,buildingrubbish,manure,garbage,sludge,excavatedrock,flyash,
aggregatesof anykindissubject tothefollowing:
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a
lead of 200meters or as per instruction given by Engineer in charge. Useful materials obtained
from clearing site andexcavation shall be stacked and used within the work site. Internal
conveyance above 200 mt within the worksite i.e. From starting chainage to End chainage of a
given road WILL NOT BE PAYABLE. Materials suitable forconstruction of Embankment, earthen
shoulder and subgrade shall be stacked at convenient places within awork site for reuse. No
extra payment will be paid to the contractor for stacking of earth within the work siteand reused
for the construction of Embankment layer, sub grade and earthen shoulder purpose. Only
surplusearth shall be disposed off outside the work site as per instruction given by Engineer-In-
charge.Useful stonesfrom rock excavation shall be stacked nearly within a lead of 50 M. and will
be allowed to be used by thecontractor on payment at rates laid down in the contract or if not so
aid down, at schedule of rates of theDivisionor atamutuallyagreedrates ifthereareno suchrates
intheScheduleof rates.
Ifsurplusmaterialsarerequiredtobeconveyed
outsidetheworksitei.e.Outsideconveyancefromaparticular stretch of given road will be paid in
this item as per instruction of Engineer in charge. No bulkage
ofdisposedearthwillbeconsideredforthepayment.
The rate shall be for a unit of one cubic meter.
ProvidingF.R.C. MHseatcover incl.carting totheworksiteetc.comp. Directed.
a.F.R.C.Extra HeavyDuty (EHD-35)MachineholeCovers.Cover:728mmø&100mmthickcircularcover,
35.00MTloaddesign,100x2mmMSflatallround,16mmøplainroundbarforliftingthecover&should
befittedwithplasticcups.
Cover shall be well casted and having good finishing. It shall be made from M300
grade.Concrete with morethan 0.5% fiber by weight of concrete as mention in IS:12592:2002.
Three coats of Black bituminous /anticorrosive paint must be applied on back side of covers.
Each cover and frame shall be marked
withmanufacturestrademark/loadinggrade,monthandyearofmanufacturing(markingshowninI
S:12592:2002). The cover should be embossed with chequered design. Transportation
expenses will beborne by the contractor. IS:12592:2002 shall be followed for Production and
Testing of Frame and cover.Thesectional weight
ofconcreteofeachitemshouldbe2400to2500kg./cu.m.
The rate shall be for a unit of per Nos.
CartingandFixingM.H.,ChamberorCatchpitSeatandCoverinlineandleveltomatchexistingroad level
in C.C.1:2:4and finishing smooth,wateringand protectingfor7days etc.complete
asdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)
The rate shall be for a unit of per Nos.
Providing and fixing cast iron machine hole frame of weight 80 to 85 kg suitable for existing EHD-35
FRCMH cover, rate also incl.loading, unloadingand fixing the frame in line and level to matchexisting
roadlevelin C.C.1:2:4andfinishing smooth, watering and protecting for 7 daysetc. complete as
perinstructionbyengg.incharge.
TheItemshallbecarriedasperItemmentionedintenderdocumentandasperinstructionofEngineer-in-
Chargeand/or his authorizedrepresentative.
Themodeofpaymentforthis item shall beonKgs. BasisbasedonactualweightofMachine holeframe.
Constructing Bombay Pattern Type Catch Pit of size 600 mm x 600 mm & depth up to 1000 mm
includingexcavation, B.B.C.C. (1:5:10), 23 cms thick brick masonry wall in the prop. of CM (1:6)
with 40 mm thick IPSflooring in the prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proportionof CM(1:3)without jalietc.comp.asdirected byE.I.C.
600mmx600mmx1000mm Depth
FordetailedspecificationreferclauseNo.24.44.1ofR&BDepartmentbookletforGeneralTechnicalSpecif
icationforbuildingworks
• ExtraDepthofCatchpitsize600mmx600mmforeveryadditionaldepthof100mmorPartt
hereof beyond1000mm depthupto1500mmdepth
FordetailedspecificationreferclauseNo.24.46ofR&BDepartmentbookletforGeneralTechnicalS
pecificationforbuildingworks.
Modeofmeasurementandpayment
Thecontractorshallberesponsibleforanylossordamagetothecatchpituptotheendofwork.Heshalla
lso beresponsiblefor thecleaningall bituminousmaterial fromthecatchpit.
Therateshallbeforaunitof oneNo
CatchPitJaliFixingP/FFRCcatchpitjaliwithframe600mmx600mmclearopeningetc.comp..AsdirectedbyEn
gineer-in-Chargeand/orhisauthorizedrepresentative.
FordetailedspecificationreferclauseNo.24.35ofR&BDepartmentbookletforGeneralTechnicalS
pecificationforbuildingworks.
Thecontractorshallberesponsibleforanylossordamagetothecatchpituptotheendofwork.Heshallalsobe
responsibleforthecleaningallbituminousmaterialfrom thecatchpit.
The rateshall befora unitofone No.
Boxcuttingtheroadsurfacetoproperslopeandcamberformakingabaseforroadworkincludingremoving
theexcavatedstuffanddepositingontheroadsideslopeasdirectedupto200Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any
such ordinaryexcavatingimplementororganicsoil,gravelsilt,sandturfloam, clay,peatetc.,
fallunderthiscategory.
Clearingthesite :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials andrubbish of all kind, bush, wood and trees shall be removed as directed. The
materials so obtained shall beproperty of the Government and be conveyed and stacked as
directed. within 200 M. lead. The roots of thetreescominginthesidesshall becutandcoatedwitha
Therateofsite clearance isdeemedto be includedinthe rateofearthworkforwhichno extrawillbe paid.
After clearing the site, the center lines will begiven bytheEngineer-in-charge. Thecontractor
shall assumefull responsibility for alignment, elevation and dimension of each and all parts of
the work. Contractor shallsupply laborers, materials, etc. required for setting out the reference
marks and bench marks and shallmaintainthemas longas requiredanddirected.
The excavation in foundation shall be carried outin true line and level and shall have the width
and depth asshown in the drawings or as directed. The contractor shall do the necessary shoring
and shutting or providingnecessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paidseparately if not specified. The bottom ofthe excavated
area shall be 1 evened both longitudinally andtransversely. as directed by removing and
watering as required. No earth filling will be allowedfor bringing itto level, if mistake or any
other reason excavation is made. deeper or wider that shown on the plan ordirected. The extra
depth or width shall be made up with concrete of same proportion as specified for
thefoundation concrete at the cost of the contractor. The excavation up to 1.5 m. depth shall be
measured underthis item.
Disposalof theexcavatedstud:
Theexcavatedstuffoftheselectedtypeshallbeusedinfillingthetrenchesandplinthorlevelingthegrou
ndin layer including ramming and watering etc. The balance of the excavated quantity shall be
removed by thecontractorfromthesiteofworktoa placeasdirectedwithleadupto200M.andall lift.
Modeofmeasurement andpayment :
Themeasurementofexcavationintrenchesforfoundationshallbemadeaccordingtothesectionsoftre
nches shownon thedrawingoras persectionsgivenbytheEngineer-in-charge. Nopaymentshall
bemader surplus excavation made in excess of above requirements or due to slopping and
sloping backas foundnecessaryonaccountof conditions ofsoil , andrequirementsofsafety.
The rate shall be for a unit of one cubic meter.
Providingandlayingcementconcrete1:5:10(1-Cement:5-finesand:10-
gradedbrickbataggregates40mm nominalsize)andcuringcomplete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose
materials andwatered and rammed as directed. The proportion of cement, sand and hand
broken stone aggregates shall beone part of cement, 5 parts of coarse sand, 10parts of hand
broken stone aggregates and shall so measuredby volume. The concrete shall be mixed in a
mechanical mixer at the site of work. Hand mixing may howeverbe allowed for smaller quantity
of work if approved by the Engineer-incharge. When hand mixing is permittedby the Engineer-
in charge in case of breakdown of machinery’s and in the interest of the work. it shall becarried
out on a water tight platform and care shall be taken to ensure that mixing is continued until the
massis uniform in colour and consistency. The quantity of water shall be sufficient to produce a
dense concrete ofrequired workability for the purpose. The concrete shall be handled from the
place of mixing to the finalposition in not more than 15 minutes by the method as directed and
shall be placed into its final position,compacted and finished within 30 minutes of mixing with
water i.e. before the setting commences. Theconcrete shall be laid in layers of 15 cms. to 20 cms.
The concrete shall be rammed with heavy iron rammersand rapidlytoget therequired
compaction and toallow all thegaps to befilled with mortar. After the finalset, the concrete shall
be kept continuously wet, if required by pounding for a period of not less than
daysfromthedateofplacementTheconcreteshallbemeasuredforitslength
breadthanddepth,limitingdimensions tothosespecifiedonplanor asdirected.
Mode of measurements shall be on CMT basis
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand broken stone
aggregates 40 mmnominal size) and curing complete excluding cost of formwork in (A) Foundation
WatershallconformtoM-1.
CementshallconformtoM-3.
SandshallconformtoM-6.
CoarseAggregate
CoarseAggregateshallconformtoM-12.
1.0 Workmanship
PWDspecificationsclauseno.4.2.1to4.2.14shallbefollowed.
Before commencing the concreting, the depth and width of the excavated foundation shall
bechecked as per the drawing. The bed of foundation trenches shall be cleared off of all
loosematerials,levled,wateredandrammed,asdirectedbyengineer-in-charge.
Thecostoftheformworkshallbeincludedorexcludedaspertheitemdescription.
Contractor shall give the Architect and Engineer-in-charge due notice before reinforcement barsare
placed in position, to permit him to inspect and accept the false work and forms as to theirstrength,
alignment and general fitness but such inspection shall not relieve the Contractor of hisresponsibility
for the safety of men, machinery, materials and for results obtained.
Immediatelybeforeconcreting,allformsshallbethoroughlycleaned.Contractorshallproperaccesswithrailing
forinspectionofwork.
Centering design and its erection shall be got approved from the Engineer-in-charge.
Sufficientcarpenterwithhelpershallinvariably
bekeptpresentthroughouttheperiodofconcreting.Movement of labour and other persons shall be totally
prohibited after reinforcement is laid inposition. For access to different parts, suitable mobile platforms
shall be provided so that
steelreinforcementinpositionisnotdisturbed.Forensuringpropercover,mortarblocks/PVCcoverofsuitable
sizeandthicknessasperthedrawingshallbetiedtothereinforcement.Timber,kapachi
orstonepiecesshallnotbeusedforthispurpose.ForexposedconcretemembersPVCblocksofgreycolorshallon
All formwork shall be cleaned and made free from standing water, dust, snow or ice
immediatelybefore placing of concrete. No concrete shall be placed in any part of the structure until
theapprovalof theArchitectandEngineer-in-chargehasbeen obtained.
FormworkforExposedconcretesurface(Ifindicated)
Allverticalmembersforformworkshallbeofsteellikeacroprops,Hframes/cuplocksystemetc.Care shall
be taken to set all formwork in perfect line, level (or in required camber or slope
asspecified)andplumb.Formworkproppingshallbestrong,rigidandsturdy.Theformworkshallbeasperpatte
rn,designshownindrawings.Formworkshallbedoneaccuratelyandpreciselysoastoachieveneat,cleanands
moothconcretesurface,inline,levelandplumb.Clinks,twists,offsets,warps,rivetingetc.inplatesorformsshall
notbeallowed.Beforeplacingconcrete,formsshallbethoroughlycleanedoffofallrust,dustandloosematerials.
Mouldreleaseagentofapprovedmakeor as per the Architect / Engineer in charge shall be applied on
sheathing before placing thereinforcement steel. Also the formwork material will be of laminated
plywood/best quality
steelsheathingoranysortofsuchmaterial,asapprovedbytheArchitect,sothatallexposedconcretesurfaces
have uniform colour and texture. After deshuttering, all concrete surfaces shall beproperly rendered
with sand paper or emery stone. The sample of the exposed concrete shall
begotapprovedbythearchitectorengineerincharge.
Forwallsandcolumns,thesheathingplatesshallbeboltedwithspecialnutsandbolts-springcoilsand PVC cone
spacer. No through bolts shall be allowed for basement walls and water
retainingstructureforwhichnoextraamountshallbepaidfor.
For all kind of exposed concrete work only one brand (to be approved by the Architect orEngineer-
in-charge)ofcementshall beused.
For exposed concrete element specified in the drawing, steel shuttering made out of CR
MSsheetnotlessthan2mmthickness(14guage)orlaminatedplywoodnotlessthan12mmwithMSanglesteels
upportingframeworkshallbeused.
Forotherconcreteshutteringmaterialshallbeasfollows:
Columns:Mouldsfrommarineplywithwoodenbattensorsteelplates
Straightwalls/Curvedwallinplan:Marineplywoodwithwoodenbattens/Acromakeorequivalentmak
esteelplates andsoldiers.
Beam:steelplatesandmarineplywithbattens
FormworkforExposedWork
Exposed / Ordinary fair finished formwork for walls, columns, beams of basement
andwaterretainingstructures
For water retaining structure the shuttering plates on either side shall be bolted with tie rodsmade from
spring coils on either side, welded with two nos. 8mm MS rods. PVC cone shall beplaced on either side of
the tie rod. The whole tie rod assembly along-with PVC cone shall beplaced/fixed with special type of
bolts on either side of the shuttering plates. Length of the tie rodalong-with PVC cone shall be equal to
thewidth / thickness of the element to be shuttered.Holes of cones shall be filled with rich cement
mortar (1:1) and bonding agent in recommendedproportion.
2.3.5.1Exposed/OrdinaryfairfinishedformworkForwalls,columns,beamsofSuperstructure
For walls, columns and beams, the shuttering plates on either side shall be bolted with throughtie rods
made fromround bars minimum12 mmwith heavy quality PVC sleeves and minimum25 mmthickPVC
cones on either side ofthe sleeve. The whole tie rod assembly along-withPVC cone shall be placed /fixed
with through bolts on either side of the shuttering plates. Holesof cones shall be filled with rich cement
mortar (1:1) and bonding agent in recommendedproportion.
Samplingandtestingofconcrete
Thecontractorshallsetupasitelaboratorytocarryoutvarioustestsasspecified.Thelaboratoryshallinclud
eequipmentslikecubetestingmachine,slumpcone,cubemouldsforconcreteand
mortar,mechanicalbalance,sieveset,flakinesstestingapparatus,corecutteretc.
SamplesfromfreshconcreteshallbetakenasperIS:1199andcubesshallbemade,curedandtested at
days or 28 days as per requirements in accordance with IS : 516. A random
samplingprocedureshallbeadoptedtoensurethateachconcretebatchshallhaveareasonablechanceofbeing
tested i.e. the sampling should be spread over the entire period of concreting and cover
allmixingunits.Theminimumfrequencyofsamplingofconcreteofeachgradeshallbeinaccordancewithfollow
Qty.ofconcreteinthework No.ofsamplesofconcretefortestingat28day
51andabove 4+oneadditionalforeachadditional50m3orpartthereof.
NOTE : Atleast 1 sample shall be taken from each shift. Three test specimens shall be made for
eachsample for testing at 28 days. Additional samples must be taken to determine strength at 7 or
3daysoratthetimeofstrikingtheformwork,ortodeterminethedurationofcuring,ortocheck thetesting error.
The samples of concrete shall be taken on each day of the concreting as per abovefrequency. The
number of specimens may be suitably increased as deemed necessary by theArchitect and Engineer-in-
charge when procedure of tests given above reveals a poor quality ofconcreteandinotherspecialcases.
The test results of the sample shall be average of the strength of 3 specimens. The
individualvariationshallnotbe15%oftheaveragestrengthofthesample.Thecompressivemeanstrengthfor
the group of 4 non-overlapping consecutive test results shall be as per col. 2 table 11 of
IS456:2000andindividualtestresultsshallbeaspercol.3oftable11ofIS456:2000.
The Architect and Engineer-in-charge shall be informed in advance by the Contractor of hisintention
to strike the formwork. While fixing the time for removal of formwork, due considerationshall be given
to local conditions, character of the structure, the weather and other condition thatinfluence the setting
of concrete and of the materials used in the mix. In normal circumstances(generally where temperature
are above 20OC) and where ordinary concrete is used, forms maybe struck after expiry of periods
specified in IS 456:2000 11.3.1 page 25 for respective item offormwork.
All formwork shall be removed without causing any shock or vibration as would damage
theconcrete. Before the soffit and struts are removed, the concrete surface shall be graduallyexposed,
where necessary in order to ascertain that the concrete has sufficiently hardened.Centering shall be
gradually and uniformly lowered in such manner as to permit the concrete
totakestressduetoitsownweightuniformlyandgradually.Whereinternalmetaltiesarepermitted,they or
their removable parts shall be extracted without causing any damage to the concrete andremaining
holes filled with mortar. No permanently embedded metal part shall have less than
25mmcoverstothefinishedconcretesurface.Whereitisintendedtore-
usetheformwork,itshallbecleanedandmadegoodtothesatisfactionoftheArchitectandEngineerin-
charge.Afterremovalof formwork and shuttering the Engineer-in-charge shall inspect the work and
satisfy by randomchecksthatconcreteproducedisofgoodquality.
The number of props left under, their sizes and disposition shall be such as to be able to
safelycarrythefullloadoftheslab,beamorarchasthecasemaybetogetherwithanyliveloadlikelytooccurdurin
gcuringorfurtherconstruction.
Immediately after the removal of forms, all exposed bolts etc. passing through the cementconcrete
member and used for shuttering or any other purpose shall be cut inside the cementconcrete member
to a depth of atleast 25 mm. below the surface of the concrete and theresulting holes be filled by cement
mortar. All fine mortar lines caused by form joints, all cavitiesproduced by the removal of form ties and
all other holes and depressions honeycomb spots,brokenedges
orcornersandotherdefectsshallbethoroughlycleanedsaturatedwithwaterandcarefully pointed and
rendered true with mortar of cement and fine sand. Considerable
pressureshallbeappliedinfillingandpointingtoensurethoroughfillinginallvoids.Surfaces,whicharepointed,
shallbekeptmoistforaperiodof24hours.Forrepairingconcretemembers,suitablebondingagentshallbeused
as directed bytheconsultant.
If rock pockets/honeycombs in the opinion of Architect and Engineer-in-charge are of such anextent
or character so as to effect the strength of the structure, materially or to endanger the lifeof the steel
reinforcement, he may declare the concrete defective and require the removal andreplacementof the
portionof thestructureaffected withno extracost.
2.0 ModeofMeasurementandPayment
CPWDspecificationsclauseno.4.2.15.1to4.2.15.5and4.2.15.7shallbefollowed.
Allstructuralelementslikefooting,slab,beam,columns,walls,lintels,chajjas,etc.shallnotbeclassified,mea
suredandpaidseparately.
The rate includes the cost of material, labour, tools and plant required for mixing, placing inposition
vibrating and compacting, finishing as directed by engineer-in-charge curing and allother incidental
expenses for producing concrete of specified strength, for all floors, all shapes
atanyheightandlevel,andinanyposition.
Therateshallbeforanunitofonecum.Thecostofformworkshallbe includedasexcludedasper
theitemdescription.
SupplyingandSpreadinggoodqualitycoarsesandfreefromImpuritiesincludingTransportationtoSitea
labour costfor Spreadingetc.Comp.as directed.
Asdirectedbyengineerincharge & asperprevailinglatestIS&IRCCode.
The mode of payment for this item shall be on Cmt. basis.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specificationincluding premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material bytipper to site, laying in uniform layers in sub- base / base course
on well prepared surface and compactingwithvibratoryrollertoachieve
thedesireddensityetccomplete.
Production &Supply of WMM to site of
worksLayingof WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material,premixed with water, to a dense mass on a prepared sub-grade/sub- base/ base or
existing pavement as thecase may be in accordance with the requirements of these
Specifications. The material shall be laid in one ormore layers as necessary to lines, grades and
cross-sections shown on the approved drawings or as directedbytheEngineer.
ThethicknessofasinglecompactedWetMixMacadamlayershallnotbelessthan75mm.Whenvibratin
gor other approved types of compacting equipment are used, the compacted depth of a single
layer of thesub-basecoursemaybeupto200mmwiththeapproval oftheEngineer.
PhysicalRequirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical
requirements setforthinTable19-1. Sevaliya/Timba/Ankodiyaspecialaggregateisonly
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness
test shall becarriedoutonthematerialdeliveredtositeasper IS:2386(Part-5).
Table19-1:PhysicalRequirements ofCoarseAggregates forWetMixMacadamfor Sub-
base/BaseCourses
S.No. Test Test Method Requirements
1. Los Angeles Abrasion IS:2386(Part-4) 40percent(Max.)
value orAggregate
IS:2386 (Part- 30percent(Max.)
2. CombinedFlakinessandElongation IS:2386(Part-1) 35 percent(Max.)*
* To determine this combined proportion, the flaky stone from a representative sample
should first beseparated out. Flakiness index is weight of flaky stone metal divided by weight of
stone sample. Only theelongated particles be separated out from the remaining (non-flaky)
stone metal. Elongation index is weightof elongated particles divided by total non-flaky
particles. The values of flakiness index and elongation indexsofoundareaddedup
GradingRequirements
TheaggregatesshallconformtothegradinggiveninTable19-2.
Table19-2:GradingRequirements ofAggregates forWetMixMacadam
ISSieveDesignation Percentbyweight passingtheISSieve
Materialfinerthan425micronshallhavePlasticityIndex(PI)notexceeding6.
The final gradation approved within these limits shall be graded from coarse to fine and shall
not vary fromthelowlimitononesievetothehighlimitontheadjacent sieveorviceversa.
Construction Operations:-
Preparationof Base
Thesurfaceofthesub-grade/sub-
base/basetoreceivetheWetmixmacadamcourseshallbepreparedtothe specified grade and
camber and cleaned of dust, dirt and other extraneous material. Any ruts or
softyieldingplacesshallbe correctedinanapprovedmannerandrolleduntilfirmsurface isobtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including
depressionsand potholes shall be repaired and made good with the suitable material. The
existing surface shall bescarifiedandre-
shapedtotherequiredgradeandcamberbeforespreadingthecoarseaggregateforWetmixmacadam.
Preparationof Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having
provision forcontrolled addition of water and forced/positive mixing arrangement like pugmill
or pan type mixer ofconcrete batching plant.For small quantity of wet mix work, the Engineer
may permit the mixing to be doneinconcretemixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more
than agreedlimit.Themixedmaterial shouldbeuniformlywet andno
segregationshouldbepermitted.
Spreading of mix
Immediatelyaftermixing,theaggregatesshallbespreaduniformlyandevenlyuponthepreparedsub
grade/sub-base/base in required quantities. In no case should these be dumped in heaps
directly on theareawherethesearetobelaidnor shalltheir haulingovera
partlycompletedstretchbepermitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of
Engineer-in-Chargeand/or his authorized representative. For portions where mechanical
means cannot be used, manual meansas approved by the Engineer shall be used.The motor
grader shall be capable of spreading the materialuniformly all over the surface. Its blade shall
have hydraulic control suitable for initial adjustments
andmaintainingthesamesoastoachievethespecified slopeandgrade.
Thepaverfinishershallbeself-propelled,havingthefollowingfeatures:
(i) Loadinghoppersandsuitabledistributionmechanism
(ii) Thescreedshallhavetampingandvibratingarrangementforinitialcompactiontothelayerasitiss
preadwithout ruttingorotherwisemarringthesurfaceprofile.
(iii) Thepavershall beequippedwithnecessary
controlmechanismsoastoensurethatthefinishedsurfaceis freefromsurfaceblemishes.
Thesurfaceoftheaggregateshallbecarefullycheckedwithtemplatesandallhighorlowsportsremedi
edby removing or adding aggregate as may be required. The layer may be tested by depth
blocks duringconstruction. No segregation of layer and fine particles should be allowed. The
aggregates as spread shouldbeof uniformgradationwithnopocketsof finematerials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same
shall be uniformlycompacted, to the full depth with suitable roller. If the thickness of single
compacted layer does not exceed100 mm, smooth wheel roller of 80 to 100 kN weight may be
used. For a compacted single layer upto 200mm, the compaction shall be done with the help of
vibratory roller of minimum static weight of 80 to 100 kNor
equivalentcapacityroller.Thespeedof theroller shall notexceed5km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the
lower edge andprogress gradually towards the upper edge. Thereafter, roller should progress
parallel to the centre line ofthe road, uniformly over-lapping each preceding track by at least
one third width until the entire surface hasbeen rolled. Alternate trips of the roller shall be
terminated in stops at least 1 m away from any precedingstop.
In portions in camber, rolling should begin at the edge with the roller running forward and
backward untilthe edges have been firmly compacted. The roller shall then progress gradually
towards the centre parallel tothe centre line of the road uniformly overlapping each of the
preceding track by at least one-third width untiltheentiresurfacehas beenrolled.
Anydisplacementoccurringasaresultofreversingofthedirectionofarollerorfromanyothercausesh
allbecorrectedatonceasspecifiedand/or removedandmadegood.
Along forms, kerbs, walls or otherplacesnot accessibleto theroller, the mixtureshall be
thoroughlycompacted with mechanical tampers or a plate compactor. Skin patching of an area
without scarifying thesurface topermit proper bondingof the addedmaterial shall
notbepermitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like
motion in thesub-base/base course or subgrade. If irregularities develop during rolling which
exceed 12 mm when testedwith a 3 metre straight edge, the surface should be loosened and
premixed material added or removed asrequired beforerolling again
soastoachieveauniformsurfaceconforming tothedesired
gradeandcrossfall.Innocaseshouldtheuseofunmixedmaterialbepermittedtomakeupthedepressi
shall becontinued till the densityachieved isatleast98per cent ofthemaximumdrydensity for
thematerial as determinedbythemethodoutlinedinIS :2720(Part-8).
Aftercompletion,thesurfaceofanyfinishedlayershallbewell-
closed,freefrommovementundercompaction equipment or any compaction planes, ridges,
cracks and loose material. All loose, segregated orotherwise defective areas shallbemade
goodtothefullthicknessofthe layerandrecompacted.
Setting anddrying:
Afterfinalcompactionofwetmixmacadamcourse,the roadshallbeallowedtodry for24 hours.
OpeningtoTraffic
Preferablynovehiculartrafficofanykindshouldbeallowedonthefinishedwetmixmacadamsurfacet
illithas driedandthewearingcourselaid.
Surface Finish and Quality Control of
WorkSurfaceevenness:
Thesurface finishofconstructionshallconform totherequirementsofClause inItemNo.16&17&18.
Qualitycontrol:
Controlonthe qualityofmaterialsandworksshall beexercisedbytheEngineerasperTable 19-3.
Table19-3:TestandFrequency forMaterials for WetMixMacadam
Type Test Frequency ISCode
(Asper CircularNo.66)
Wet Gradation Onetest per200Cu.m. IS:2386,Part-I-
AggregateImpactValue One testper1000 Cu.m. IS:2386,Part-IV
Combined Flakiness Onetest per500Cu.m. IS:2386,Part-I
andElongationIndice
Atterberg Limits Onetest per200Cu.m. IS:2720,Part-V
ofportionofaggreg
Density of One set of three tests IS:2720,Part-VIII
compactedlayer per1000sq.m
RectificationofSurfaceIrregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible
tolerances or wherethe course is otherwise defective due to subgrade soil getting mixed with
the aggregates, the full thickness ofthe layer shall be scarified over the affected area, reshaped
with added premixed material or removed andreplaced with fresh premixed material as
applicable and recompacted. The area treated in the aforesaidmanner shall not be less than 5 m
long and 2 m wide. In no case shall depressions be filled up with
unmixedandungradedmaterialor fines.
ArrangementforTraffic
Duringtheperiodofconstruction,arrangementsforthetrafficshallbeprovided.TheContractorshallt
akeall necessary measures for the safety of traffic during construction and provide, erect and
maintain suchbarricades,includingsigns,marking,flags,lights
andflagmenasperinstructionoftheEngineer-in-charge.
MeasurementsforPayment
The rate shallbe foraunitofonecubicmeter.
ProvidingandCastinginsituordinary cement concrete M200 for R.C.C. Raft and cutt off
wallsincluding necessary shuttering laying, vibrating, ramming andcuring complete.(B) Walls, fom
topoffoundationleveluptofloortwolevel(upto10ton).
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge
and/or hisauthorizedrepresentative.
Modeofmeasurementsshallbe onCMTbasis.
Labourworkforfixinganykindofpaving withcementpointing inCM1:2,includingwatering,ramming
comp. as dir. For pavement aI) Laying on Sand bedding as per requirement to fix the C.C.Block /
NibhadaStoneinLine&Level
Work shall be carried out as per item description including cost of all labour and materials etc.
complete asdirected.General standardpracticeof layingofpaverblock isapplicable.
ThemeasurementsshallbeonSmt.basis.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for Central Verge in M-
20 grade using20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiyaor
equivalent quality for pre-castblocks, reasonably exposed finish/ formwork, mould with well
equipped with vibratory system for kerbstones of approved design including curing, etc.
complete, including the cost of formwork etc.
complete.Therateshallalsoincludenecessarycuttingofasphalt,fixingtheKerbstonesinlineandlevel
on5cmthick sand bedding with necessary equipments and materials. The rate shall also include
the flush pointingin CM (1:3) for all joints of the kerb stones. Filling of zari alone the sides of the
kerb stone fixed withBituminousconcretemixedinproperpositionasdirectedbyEngineerin
changetoformaportablemixture.InanycaseGravelorsuchtypeof materialsshallnot
beallowedforproduction.
Thespecifiction
offollowingmaterialsshallbeconformingwithspecificationmentionedforrelav
entmaterial/itemsinGeneraltechnical specification forbuildingworkof R&BDepartmentof
WatershallconformtoM-1
CementtoM-2 Sand
Gradedstone aggregate20mm.nominalsize toM-10
Contractorshallhavetomanufacturetheblocksasperthedimensionsgiveninthedrawing.Specificma
chineries shall be used to manufacture the precast blocks. These machineries should be
compatible toproduce blocks of required strength and dimensions. The machine shall contain
hydraulic Press or advancedequipment to generate required compaction & Grade and finish.
Moulds/ Steel Plates/ Dies of the machineshall be dimensionally checked & to be got approved
before commencing the production. Contractor shallprepare proper Drying Yard for keeping
the blocks before curing. The drying yard shall be levelled andcovered so that no shrinkage
cracks are formed. Contractor shall prepare adequate size curing pond to curethe blocks for not
less than 21 Days. No other means of curing shall be allowed. The technical specificationof
concrete shall confirm to IS 456-2000. The concrete mix is not required to be designed and only
nominalmix as per IS: 456-2000 shall be followed. The proportion of the concrete mix shall be
1:1.5:3 (1 cement: 1.5coarse sand: 3 graded stone aggregate 20 mm. nominal size) by volume.
Concrete work shall have fairlyexposed concrete surface or as specified in the item. The
designation ordinary M-10, M-15, M-20, M-25specified as per I.S. corresponds approximately to
1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinaryconcrete, by volume respectively. The
ingredients required for ordinary concrete containing one bag ofcement of 50 Kg. by weight
(0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. Theproportion of the
aggregate for the kerb stone shall be modified as per the approval of the engineer-in-charge.
The water cement ratios shall not be more than those specified as per IS. The cement of the mix
shallbe increased, if the quantity of water in a mix has to be increased to overcome the
difficulties of placementand compaction so that the water cement ratio specified in the table is
not exceeded. The maximum size ofcoarse aggregate shall be as large as possible within the
limits specified but in no case greater than 1/4th ofthe minimum thickness of the member,
provided that the concrete can be placed without difficulty so as tosurround all reinforcement
thoroughly and to fill the corners of the form. For reinforced concrete work,coarse aggregates
having a nominal size of 20 mm. are generally considered satisfactory. Admixture shall
beusedinconcrete onlywithapprovaloftheEngineer-in-
chargebasedupontheevidencethatwiththepassage of time, neither the compressive strength of
concrete is reduced nor are other requisite qualities
ofconcreteimpairedbytheuseofsuchadmixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of
bags of 50 kgweight. The volume of one such bag can be taken as 0.0342 m3. Boxes of suitable
sizes shall be used formeasuring sand and aggregate. The size of the boxes (internal) shall be
30cm. x 30 cm. and 38 cm. deep.While measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. Theproportioning of sand shall be on the basis of its
dry volume and in case of damp sand; allowances for bulkageshall bemade.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories
keptinfirstclassworkingconditionandmaintainedthroughouttheconstruction.Measuredquantity
ofaggregate, sand, and cement required for each batch shall be poured into the drum of the
mechanical mixerwhileitiscontinuouslyrunning.Afterabouthalfaminuteofdry-
mixing,measuredquantityofwaterrequired for each batch of concrete mix shall be added
gradually and mixing continued for another one and ahalfminute. Mixingshall becontinuedtill
materialsareuniformlydistributed anduniformcolour oftheentire mass is obtained and each
individual particle of the coarse aggregate shows complete coating
ofmortarcontainingitsproportionateamountofcement.Innocaseshallthemixingbedoneforlesstha
minutes after all ingredients have been put into the mixer. Mixers which have been out of use
for more than30 minutes shall be thoroughly cleaned before putting in a new batch. Unless
otherwise agreed to by theEngineer-in-charge, the first batch of concrete from the mixture shall
contain only 2/3rds of normal quantityof coarse aggregate. Mixing plant shall be thoroughly
cleaned before changing from one type of cement toanother.
The degree of consistency which shall depend upon the nature of the work and methods of
vibration ofconcrete shall be determined by regular slump tests in accordance with IS: 1199-
1959. The slump of 10 mm.to25mm.shallbeadoptedwhenvibrators areused.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately
beforeplacingof concrete.
Formwork/MetalMouldforexposedconcretesurface(Ifindicated):
All the mouldsshall bechecked for exactdimensionsof theprecastblocks. All theedgesof
theprecastblocks shall confirm the profile of the final drawing & edges/ curvatures of the
moulds shall be checkedaccordingly. Moulds shall be regularly checked for correctness of
dimensions of Blocks, twists, bends due tohandling, etc.Beforestartingeverydays work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or
slope asspecified) and plumb. Form work/Mould propping shall be strong, rigid, and sturdy.
The form work/Mouldshall be as per pattern & design shown in drawings. Form work/Mould
shall be done accurately and preciselyso as to achieve neat, clean and smooth concrete surface,
in line, level and plumb. Clinks, twists,
offsets,warps,rivetingetc.inplatesorformsshallnotbeallowed.Beforeplacingconcrete,formsshallb
ethoroughly cleaned off of all rust, dust, and loose materials. Colourless oil or grease of
approved quality shallbe applied before placing steel. Also the form work material will be of
wood/plywood/steel or any sort ofsuchmaterial, asapprovedbytheEngineer-in-
Chargeand/orhisauthorized representative;sothat
allexposedconcretesurfaceshaveuniformcolour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in
charge) of cementshall beused.
Removalof Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast
blocks shall gainstrength to withstand the stresses generated due to self weight and handling to
drying yards without anydeformationtoshape/dimensions/edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength anddry inshadetoprevent anycracksduetoshrinkage.Thisshall bedoneindryingyards.
Curingofblockshallbe done onlyincuringpondandcuringshallbedone forminimum14days.
Drying period after removing from pond & before delivery to site: Water should be drained of
theblockbeforeitisactuallysenttothesite.Timeshouldbeprovidedforproperdrainingofwaterwhich
maybepresentintheblock keptforcuringinthepond.
Precautionshallbetakenwhile transportingofthe blocksto site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses
leading tobreakingofblock.Careshouldbe
takentopreventtheblockfrombreakingduringtransporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and
level. Therelevant specifications of item A- 1 shall be followed for excavation work. The pits
shall be filled with a layerof 50mm. thick sand bedding. The curbs then shall be placed in
position of which 50mm. shall be below
road.Careshouldbetakentomaintainproperlineandlevel.Thejointsbetweenthekerbsshallbepoint
C.M.1:2andcuredforminimumsevendays.
Sampling andtestingof concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made,
curedand testedat 7 days or 28 days as per requirements in accordance with IS : 516-1959. A
random sampling procedureshall be adopted to ensure that each concrete batch shall have a
reasonable chance of being tested i.e. thesamplingshouldbespreadover
theentireperiodofconcretingandcoverallmixingunits.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each
sample, 5 fortesting at 7 days, and the remaining 5 at 28 days. The samples of concrete shall be
taken on each day of
theconcretingasperabovefrequency.Thenumberofspecimensmaybesuitablyincreasedasdeemed
necessary by the Engineer-in-charge when procedure of tests given above reveals a poor
quality of concreteand in other special cases. The average strength of the group of cubes cast
for each day shall not be less thanthe specified cube strength of 200 Kg/cm2 at 28 days. 20% of
the cubes cast for each day may have value lessthan the specified strength provided the lowest
value is not less than 85% of the specified strength. If theconcrete made in accordance with the
proportions given for a particular grade, does not yield the specifiedstrength, such concrete
shall be classified as belonging to the appropriate lower grade. Concrete made inaccordance
with the proportions given for a particular grade shall not, however, be placed in a higher
gradeon the ground that the test strength are higher than the minimum specified. If rock
pockets/honeycombs inthe opinion of Engineer-in-charge are of such an extent or character so
as to affect the strength of
thestructure,materiallyortoendangerthelifeofthesteelreinforcement,hemaydeclaretheconcreted
efective andrequire theremovalandreplacementof the portionofthestructure affected.
PrecastKerbStones:
The relevant specifications of concreting as per itemabove shall be followed except that work
shall becarried out for precast concrete kerb stones as specified in the item. All Precast
members shall be cast atworkshop. Sufficient curing shall be done before placement of the
samethe method of transporting
andplacingtheprecastmembersshallbeasapprovedbytheEngineer-in-
charge.Membersshallbesotransportedthatnobreakageorunduestressesareinducedinthem.Ifreq
uired,allmembersshallhaveakey provided on both the faces i.e top and bottom surfaces, of
adequate size so as to fill the same withconcrete while laying. The function of this key is to
avoid the leakage through the joint between the precastmemberandthememberon whichit is
ModeofMeasurements andPayment:
The rate shall include cost of formwork andcost of reinforcement. The volume occupied by
reinforcementshall not bedeductedfromR.C.C. work.
The rate shall be for a unit of Rmt.
Supplying and fixing of 300 mm-L x 150 mm-Bx 380 mm-H Kerb block for Footpath in M-20
grade using 20mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiyaor
equivalentquality for pre-
castblocks,reasonablyexposedfinish/formwork,mouldwithwellequippedwithvibratorysystemfo
stones of approved design including curing, etc. complete, including the cost of formwork etc.
complete.Therateshallalsoincludenecessarycuttingofasphalt,fixingtheKerbstonesinlineandlevelon5c
mthick sand bedding with necessary equipments and materials. The rate shall also include the flush
pointingin CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone
fixed withBituminousconcretemixedinproperpositionasdirectedbyEngineerin
changetoformaportablemixture.InanycaseGravelorsuchtypeof materialsshallnot
beallowedforproduction.
The rate shall be for a unit of Rmt.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish
/ texturefinish kerb stones of approved make as per approvedsample of any size and any type.
Kerbs shall be fixedon the foundation prepared as per approved design. The rate shall also
include for erecting and fixing thepieces in position for complete kerb system with chamfered
type of kerbs including necessary accessoriesof kerb like radius kerb, angles and quadrant
kerbs, droplet kerbs etc. complete as per drawing. Kerb shallbe fixed as paper joint without any
jointing material. However cement mortar shall be provided at thebackside of kerb stone
joint.(Sample mustbe approved)Costof excavation, cutting,base ,side fillingshall
includesasdirected engineer-incharge inaboveitemdescriptionas perBOQ (a)
450mmhighmediankerb*600*150mm
The rate shall be for a unit of Rmt.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of
any size ;shape (UsuallyUni-Paver Blocks) usingblack trap good qualityaggragate
of20mmnominalsize
forfootpath,parkingareas,servicelanesandotherareasasmentionedinthedrawing/instructionofEngine
er-in-Charge and/or his authorized representative. Cost includes formworks using rubber
mould,Rate providing and laying paver blocks as per required grading and specification. The paver
block shall bemechanically compacted. The work of paving blocks shall be executed in line and level
by skill mason offlooring work only. It should be laid in such a way that the no cutting of the paver
block to be necessary. ifcutting of paver block necessary then it should be cut by machine only and
carting. The finished surface ofthe paver block shall have resonably good, plain finished. Paver
blocks shall be compacted and shall berelaid if necessary. Gravel or such type of materials shall not
be allowed for production.Laying on 50 mmthicksandbedding.
• Layingon50 mm thicksandbedding.
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil
murrum includingsortingoutsandstackingofusefulmaterialsstuff upto 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at
various Retailoutlets. The work includes: Verification of the existing site condition and advising
our project in charge to laysuitable base course if required. Contractors are required to satisfy
themselves with quality of sub grade,sub-base coursebeforethepaver blocksarelaidandsuggest
strengtheningifrequired.
Clearingthesitebyremovingallobstaclessuchasstones,debrisetc.forlayingofpaverblocks.Manufac
turingofpaverblocksinyourplantasperrequirementsintechnicalspecificationenclosed.Supplying
of paver blocks at site,includinghandlingat bothends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand
bedding,within shortest possible time the site is public place hence care should be taken to
ensure that the routineactivitiesshouldnot be disturbed.Thejoboflayingmay
requiredtobecarriedout duringnightalso.
Testing ofpaver blocksshall through reputed Govt./Non Govt. Testhouse onlyand submission of
testresults as per requirements in Technical Specifications. AMC reserves the right to carryout
test at random.Cost for such tests to be borne by party. The contractor shall guarantee that all
material and componentsdesigned, fabricated, supplied, and laid by him shall be free from any
type of defect due to faulty materialand/or workmanship/erection for a period of One year
from the date of completion of work. However, thecontractoroneyear's shallrender
freemaintenance.
TECHNICALSPECIFICATIONS:
PaverBlockManufacturingFacilities:
ThePaverBlockshallbemadeinfactorywithfollowingminimumfacilities:
ConcreteBlockmakingMachines:
The machine should be capable of producing high quality Paver Blocks by obtaining high
ofcompactionbyapplicationofhydrauliccompactionandalsobyhighintensityvibrationtoth
emoulds.Themachineshouldhaveautomatic controlpanel
foruniformityinstrength.
ConcreteBatching&MixingPlant:(Notessential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredientshould be mixed in concrete Batching & Mixing plant with minimum capacity
of 30 cum/hour. Theplant should equipped with automatic control panel for
maintaining water cement ratio from batchto batch to obtain concrete of uniform
quality and strength. The plant should be equipped withadequate mechanism for
mechanized loading of raw materials into mixer and conveyor belt fortransportation of
concrete from mixer to concrete block making machine to maintain quality of
Thefactoryshouldhavewelldesignedcuringareatoensureadequatecuringofpaverblocks.
Laboratory(Desirablebutnotessential):
The testing equipment should have required in the Laboratory as perthe
following:ACompressiontestingmachineof adequatecapacity.
Othertoolsandequipmentfortestingrawmaterials andpaverblocks.
Systematic record of test results of various paver blocks manufactured in
the factory.ConcreteMixDesignforvarious
gradeofconcreteusedformakingofpaver blocks.
Specifications ForColouredPaverBlocks:
Colouredconcretepaverblocksshallbemanufacturedasperattachedspecificationsusingore
quivalent approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE
PIGMENTS” withminimum colour pigment of 3% by weight of cement. The colour shade
shall be “RED” as selected byAMC before commencement of the work. White cement
shall be used for colored pavers to obtainthe desired colour shade. The job also includes
providing 50 mm thick sand bedding to match theshadeofthepaverblock.
The colour of the paver block shall be guaranteed against fading of colour for period of
12 monthsfromthedateof layingofthesameat site.
Allothertechnicalspecifications&Procedurefortesting,laying&samplingofcolouredpavers
willbeas perattachment.
PaversBlockCharacteristics:
The concrete pavers should have perpendicularities after release from the mould and
sameshouldberetaineduntilthelaying.Thesurfaceshouldbereasonablysmoothandofantisk
idandanti glare type. The paver should have uniform chamfers to facilitate easy drainage
surface run off.The pavers should have uniform interlocking space of 2mm to 3mm to
ensure compacted sand fillingafter vibration on the paver Surface. The concrete mix
design should be followed for each batch ofmaterials separately and automatic batching
plant is to be used to achieve uniformity in strength andquality.The pavers shall be
manufactured in single layer only. Skilled labour should be employed
forlayingblockstoensurelineandleveloflaying,desiredshapeofthesurfaceandadequatecom
paction of the sand in the joints. The pavers shall be of cement gray colour without any
pigment& for coloured pavers refer “specifications for coloured pave`” The pavers are to
be skirted all roundwith kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should beembedded for 100mm depth. The concrete used for
kerbing shall be cured properly for 7 daysminimum.
PaverBlockDimensions:
Shape Unipaver,Ishapeordirectedby Addl.C.E.
Chamfer 4mmto6mm alongtopedges
Colour Naturalcementgreycolourwithoutuseofany pigment.
For coloured pavers refer “specifications for
colouredpavers”
DimensionalTolerance (+/-)2mmforlength&width,
(+/-)3mm forHeight(Thickness)
Testing ofPaverBlocks:
* TEST AverageValues Frequency
1. CompressiveStrengt Min.35N/Sqmmfor 250Smt/1Test
2. FlexuralStrength Minimum4.5
3. AbrasionResistance Maximum1.5
4. WaterAbsorption Maximum5.80%
*Samplingandtestingprocedureasperenclosedspecifications
SamplingandTestingProcedureforPaverBlocks
INTERNAL –Averageofminimum3 samplesper5000Blocks.
TestingSamplingofPaverbloc
Methodof sampling:
Beforelayingpaverblocks,eachdesignatedsectioncomprisingnotmorethan50000blocks,shallb
edividedintotenapproximatelyequal groups.Threeblocksshall bedrawnfromeachgroup.
Marking andidentification:
All samples shall be clearly marked at the time of sampling in such a way that the
designated sectionofpartthereof,andtheconsignmentrepresentedbythe sample,
areclearlydefined.
Thesample shall be dispatched totheapproved test laboratory taking precaution toavoid
damageto the paving in transit. Protect the paving from damage and contamination until
they have beentested. The testing shall be carried as soon as possible, after the sample
has been taken. As soon aspracticable after sampling. The samples shall be stored in
water at 20 degree C 5 degree C for 24hours priortotesting.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-
in-Chargeand/or his authorized representative using Rubber mouldand Table vibrator
forKerb instead ofmechanicalpresssystem.
Extra rate for excavation of asphalt payment of any thickness including demolishing the
asphaltcarpet, metal, soling etc. complete with stacking the materials as directed. The
road surface ofasphalt shall carefully be opened to full width as directed by the
Engineer-in-Charge and/or hisauthorizedrepresentative.
Excavation area shall be properly identified and marked in rectangular shape. The road
crust shall beopened up to entire depth i.e. including soling. All the materials shall be
separately deposited in suchawayandinplacesasmaybedeterminedbytheEngineer-in-
Chargeand/orhisauthorizedrepresentative.Incaserubblenotbeingsodepositedorbeingmi
xedupwiththeexcavatedmaterials will not be allowed for refilling. The cost of materials
shall be charged from the contractor.The decisionoftheC.E.shall befinal
andbindingtothecontractLayingFordetailedspecificationforLayingofPaverBlockon
sandbedding,referR&BDepartmentbookletfor General Technical Specificationfor
The rate shall be for a unit ofSMT
Providing and laying of interlocking grey paver blocks of high density 80mm thick made from
M-40 gradeconcrete using 6 mm to 20 mm machine crushed well graded stone aggregate, sand
of approved quality,OPC 53 grade cement with contractor's own concrete mix design as
approved by AMC, for parking,
road.CostIncludesformwork,usingrubber/FRPmould,layingpaverblockasperrequiredgradingan
dspecification laid paver block shall be mechanically compacted. The work of the paving blocks
shall beexecuted in line and level by skilled mason of flooring work only. It should be laid in
such a way that the nocutting of the paver block to be necessary. Cutting of paver block by
machine cut only and carting to bedone. The Finished surface of the Paver Block shall have
reasonably good plain finish. Paver blocks shall becompacted and shall be re-laid if necessary.
Gravel or such type of materials shall not be allowed
forproduction.Layingon5Cmsthicksandbedding.
ForrelevantSpecificationofItemasperitemdescription&instructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
The mode of payment for this item shall be on RMT. Basis.
Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade
ofconcrete and colour machine made and blasting by automatic shot blasting machine and high
density of asper approved sample of approved make for footpath, parking areas, service lanes,cross
over and otherareas as mentioned in the drawing. Including providing and laying 50 mm thick
averave bedding layer
ofcoarsesandbelowpaverblockasperrequiredgradingandspecification.Laidpaverblockshallbemechan
ically compacted. The work of the paving blocks shall be executedin line and level by
skilledmasonofflooringworkonly.Smallsizeofpaverblockwithsamespecificationshallbeusedatresidue
orat end. It should be laid in such a way that the no cutting of the paver block to be necessary. If
cutting ofpaver block shall be required , than cut by machine only and laying to be done by skilled
mason.ThefinishedsurfaceofthepaverblockshallhavecoarsesandTextureFinish.Paveblocksshallbeco
mpacted and shall be re-laid if necessary. Actual laid area shall be measured and paid without
anywastage.(A)80mm thickM-35gradeGreyPaverblock ofsize200mm x200mm.
Thescopeofwork:ItincludessupplyingandlayingofPrecastshotblastedbyautomat
icshotblastingmachine infactory(notonsite)
paverblocksatfootpath,parkingarea,servicelaneandotherareas.
The workincludes:
Paverblockshouldbelaidoverpreparedsubgrade.
Clearingthesiteby removingallobstaclessuchasstones,debrisetc.forlayingofpaverblocks.
Manufacturingofpaverblocksbyoneoftheapprovedsuppliersasperrequirementsi
ntechnicalspecificationenclosed.
Supplyingofpaverblocksatsite,includinghandlingatbothends.Thetypeofpaverblo
ckmaybeinterlockingornon-interlocking.
Providingandlayingaverage50mmcoarse sandbeddingforlayingblocks.
Layingofpaverblocksatsiteasperrequirementintechnicalspecification,withinshortestpos
Testing of paver blocks through reputed Govt. /Non Govt. Test house and
submission of testresults asper requirements in Technical Specifications. Client
reserves the right to carryout test at random. Cost forsuchtests
tobebornebycontractor.
The contractor shall guarantee that all material and components designed,
fabricated, supplied and laidby him shall be free from any type of defect due to
faulty material and/or workmanship/erection for a periodof five year from the date
of completion of work at individual sites. However, the contractor for five
yearsshall render freemaintenance.
TechnicalSpecifications:
PaverBlockManufacturingFacilities:
ThePaverBlockshallbemadeinfactorywithfollowingminimumfacilities:
ConcreteBlockmakingMachines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level
of compactionby application of hydraulic compaction and also by high intensityvibration to the
moulds. The machineshouldhaveautomatic control panelforuniformity instrength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed
for each batchof materials. The concrete ingredient should be mixed in concrete Batching &
Mixing plant with minimumcapacity of 30 cum/hour. The plant should be equipped with
automatic control panel for maintainingwatercementratiofrombatchtobatchtoobtainconcreteof
uniformqualityandstrength.
The plant should be equipped with adequate mechanism for mechanized loading of
raw materials into mixerand conveyor belt for transportation of concrete from mixer
toconcrete block making machine to maintainqualityofwet cement.
Thefactoryshouldhavewelldesignedcuringareatoensureadequatecuringofpaverblocks.Stea
mcuringfacilityofthepaver blocksispreferable.
Laboratory(Desirablebutnotessential):
Thefactoryshouldhavethefollowing:
Compressiontestingmachineofadequatecapacity.
Othertoolsandequipmentfortestingrawmaterials andpaverblocks.
(1) Systematicrecordoftestresultsofvariouspaverblocksmanufacturedinthe factory.
(2) ConcreteMixDesignforvariousgradeofconcreteusedformakingofpaverblocks.
SpecificationsforColouredPaverBlocks:
Colour concrete paver blocks shall be manufactured as per attached specifications
using approved colourPigment of iron oxide of approved brand like Bayer, Tata etc.
with minimum colour pigment of 3% by weightof cement. The colour shade shall be as
selected by Architect before commencement of the work. The jobalso
includesproviding50mmthicksandbeddingto matchtheshadeofthepaver block.
The colour of the paver block shall be guaranteed against fading of colour for period of
12 months from thedateof layingofthesameat site.
All other technical specifications & Procedure for testing, laying & sampling of Color
pavers will be as perattachment.
PaverBlockCharacteristics:
Theconcretepaversshouldhaveperpendicularitiesafterreleasefromthemouldandthesames
houldberetaineduntilthelaying.
The surface should be reasonably smooth and of anti skid and anti glare type. The paver
should have uniformchamfers tofacilitateeasydrainagesurfacerunoff.
Thepaversshouldhaveuniforminterlockingspaceof2mmto3mmtoensurecompactedsandfill
ingaftervibrationonthepaver Surface.
Theconcretemixdesignshouldbefollowedforeachbatchofmaterialsseparatelyandautomatic
batchingplant is tobeusedtoachieveuniformityinstrengthandquality.
ThepaversshallbemanufacturedinDoublelayeronly.
Skilledlabourshouldbeemployedforlayingblockstoensurelineandleveloflaying,desiredshap
eofthesurfaceandadequatecompactionof thesandinthejoints.
PaverBlockDimensions:
Layers Double layered,toplayerminimum8 to10mm
Shape Irregular (Uniform Shape with no Hollow Or
Cracks) / as per drawingChamfer 4mmto6mmalongtopedges
NaturalcementgreyColourwithoutuseof
anypigment.ForColourpaversrefer“specif
icationsforColourpavers”
Dimensional (+/-) 2mm for
length & width,Tolerance (+/-
)3mmforHeight(Thickness)
TestingofPaver Blocks:
* Samplingandtestingprocedureasperenclosedspecifications
Sampling& Testing ProceduresforPaverBlocks:
Averageofminimum3samplesper10000Blocksforcompressivestrengthandwaterabs
EXTERNAL –Minimum2Blocksper10000 blocksforabrasionandflexure.
SamplingForTesting:Samplingfortestingofpaverblocksshallbedoneinaccordan
cewithAppendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in
accordance with Appendix-B.The averagecompressive strengthoftheblocks testedshall
be30/40 N/Sq.mmasper thickness.
AbrasionResistance:TestingforabrasionshallbeinaccordancewithIS1237(Specificationsfor
CementConcreteFloorTiles).
FlexuralStrength:TestingforflexuralshallbeinaccordancewithIS 1237(Specifications
orCementConcreteFloorTiles).
WaterAbsorption:TestingforwaterabsorptionshallbeinaccordancewithIS2185:1979
:PartI(Specifications for ConcreteMasonryUnits).
Method of sampling: Before laying paver blocks, each designated section comprising
not more than 10000blocks, shall be divided into five approximately equal groups.
One block shall be drawn from each group i.e. 3for internal testingand2for external
Markingand identification: All samples shall beclearly marked at the time of sampling
waythatthedesignatedsectionsofpartthereof,andtheconsignmentrepresentedbythesam
ple,areclearlydefined.Thesampleshallbedispatchedtotheapprovedtestlaboratorytaking
precautiontoavoiddamageto the paving in transit. Protect the paving from damage and
contamination until they have been tested. Thetesting shall be carried as soon as
possible, after the sample has been taken. As soon as practicable
aftersampling.Thesamples shall bestoredinwater at20degreeoC for24hours
priortotesting.
SR.NO. *TEST SPECIFICATIONAverageValues
(AverageofMinimumFiveSamples/Site)
1. CompressiveStrength Min. 30 N/Sq.mm for 60mm thick and
Min. 40 N/Sq.mmfor80mmthick
2. FlexuralStrength Minimum3.80 N/Sq.mmand4.5N/ Sq.mmfor60and80
mmthickpaverblockrespectively.
3. AbrasionResistance Maximum1.5
4. WaterAbsorption Maximum 5.80%
5. MinimumCementContent 380Kg/CumforM 30 concreteand430Kg/Cum
Sampling& Testing ProceduresforPaverBlocks:
Averageofminimum3samplesper10000Blocksforcompressivestrengthandwaterabs
EXTERNAL –Minimum2Blocksper10000 blocksforabrasionandflexure.
Sampling For Testing: Sampling for testing of paver blocks shall be done in
accordance with Appendix-A.Compressive Strength: Testing for compressive strength
shall be undertaken in accordance with Appendix-B.The averagecompressive
strengthoftheblocks testedshall be30/40 N/Sq.mmasper thickness.
AbrasionResistance:TestingforabrasionshallbeinaccordancewithIS1237(Specificationsfor
CementConcreteFloorTiles).
FlexuralStrength:TestingforflexuralshallbeinaccordancewithIS1237(Specificationsf
orCementConcreteFloorTiles).
WaterAbsorption:TestingforwaterabsorptionshallbeinaccordancewithIS2185:1979
:PartI(Specifications for ConcreteMasonryUnits).
Method of sampling: Before laying paver blocks, each designated section comprising
not more than 10000blocks, shall be divided into five approximately equal groups.
One block shall be drawn from each group i.e. 3for internal testingand2for external
Markingand identification: All samples shall beclearly marked at the time of sampling
in such a waythatthe designated sections of part thereof, and the consignment
represented by the sample, are clearly defined.The sample shall be dispatched to the
approved test laboratory taking precaution to avoid damage to thepavingintransit.
Protectthepavingfromdamageandcontaminationuntiltheyhavebeentested. Thetesting
shall be carried as soon as possible, after the sample has been taken. As soon as
aftersampling.Thesamplesshallbestoredinwaterat20degreeC5degreeCfor24hoursp
TestForCompressiveStrength:
Testing Machine: The testing machine shall be of suitable capacity for the test and
capable of applying theload of the rate specified. It shall comply, as regards
repeatability and accuracy, with the requirements ofclause2.1of BS:1881-Part4.
Procedure: The sample specimen shall be tested in a wet condition after being stored
for at least 24 hours inwater maintained at a temperature of 20 oC + or – 5 oC. Before
thespecimens are submerged in water, thenecessaryarea shall bedetermined.
The plates for testing machines shall be wiped clean and any loose grit or other
material removed from thecontact faces of the specimen. Plywood, nominally 4 mm
thick shall be used as packing between the upperand lower faces of the specimen and
the machine plates and these boards shall be larger than the specimenbythemarginof
atallpoints.FreshPackingshallbe usedforeveryspecimentested.
The specimen shall be placed in the machine with the wearing surface in the
horizontal plane and in such awaythat theaxesof
thespecimenarealignedwiththoseofthemachineplates.
Theload shallbeapplied withoutshockand increased
continuouslyattherateofapproximately15 N/Sq.mm per minute until no greater load
can be sustained. The maximum load applied to the specimen shallberecorded.
Calculation of corrected strength for individual Blocks: The compressive strength of
each block specimenshall be calculated by dividing the maximum load by full cross
section area of the block and multiplying withanappropriatefactorof:-
a) For100mm thick blocks–
b) For80mmthick blocks–1.18
c) For60mmthickblocks –1.06
CompressiveStrengthCalculation:Theaveragecorrectedcompressivestrengthforthed
esignedblocksectionshall becalculated.
4.0 Methodof laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act
as firm bed. Blocks shallbe laid in such manner that no gap shall be left in between.
Blocks so laid shall be compacted by means ofmechanical compactor or equivalent
compacting method so as to obtain required finished surface. All
thejointsshallbematchedandifanymanufacturingdefectisdetectedthelotshallbereplaced
andrelayingshall bedonewithoutanyextracost uptosatisfactionof Engineer incharge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver
blocks. Joints of thepaver blocksshall befilledwith thesand.
The paver blocks shall be laid properly on the prepared sub-base as per
manufacturer's specification and asper Architect andEngineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver
block providing the layingservices, then it shall be laid through the supplying agency
only. The labourers for paver block fixing shall beskilled flooring mason only. Only
cutting tool shall be used for cutting the paver block. Full depth cutting tollshall be
used for proper finished surface after cutting. Manual cutting or breaking of the paver
block is notpermitted.
After laying of the paver block fine sand shall be spread over it and paver block shall
be compacted withmechanicalcompactor.Any settlementor undulationinthe laidarea
shallberepairedimmediately.
5.0 ModeofMeasurementandpayment:
Measurementshallbedoneasperactualarealaidwithoutconsideringanywastage.
TheMeasurement oftheitem shallbeinSqmtbasis.
Providing and laying cement concrete tactile tile (for vision impaired persons as per
standards)of size 300 x300 x 25 to 30mm of Vyara, Super, Nishu approved make and
pattern having waterabsorption not over 6%and conforming to IS: 13801:1993, of
approved make, pattern and shade(with UV light resistant coloursfrom Lanxess only)
in outdoor floors such as footpath, court yard, multi modals location etc., laid on
to40mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes &
patterns includinggrouting the joints with white cement mixed with matching
pigments etc. complete as per direction ofEngineer-in-Charge.
Relevant specification shall be followed as per item no – 41 (Kota flooring) for
laying of cement concretetactile precast concretestoneofapprovedmake, shade,
FordressingCPWDspecificationsclauseno.11.20.2shallbefollowed
For laying and preparation of surface CPWD
specifications clause no. 11.20.3 shall be followedexcept
average thickness of CM shall be 35mm to 50 mm,
cement mortar shall be 1:6 ( 1 cement :6sand) used.
While laying any chiseling which may be required for
making the skirting or dado flush with theplaster and/or
other finishes shall be done. Necessary grooves of
required size in cm. betweenplaster or other finishes and
coping (both side) shall be provided. Forming machine-
cut/ roundededges, gutters, sills, platforms, channels,
curbing, etc. if any, if required, shall be provided as
perthedrawinganddesign.
Allexposededgesofcopingstone shallbe
ineventhickness,champheredandpolishedmatchedto stone
finish. In places where full tiles cannot be fixed, the tiles
shall be cut to the size
andsmoothenedatedgetogivestraightandtruejoints.
Allnecessaryslopes,gradientsandlevelsshallbetrulymaintaine
dasrequiredanddirectedbytheArchitectandEngineer-in-
The floorshall bekeptwet foraminimum periodof 7days,so
thatbeddingandjoints setproperly.
Polishing shall be normally commenced after 14 days
of laying the slab. For special polishpolishing to be
done with 2 coats of 60, 120 grades of emery, balck
chapadi and gutka. For semimirror polish polishing to
be done with 220, 320, 400, 600 grades of emery.
beproperlyusedduringpolishing.Theflooringshall
thenbe washedcleanwithoxalicacid.Daily
mopingfor15daysshallbedone afterpolishingoruptothe satisfactionofclientandengineer-
All works shall be carried out as directed by the Architect and as
specified in the item, nowaxingwill bepermitted.
Ifanytileisdisturbedordamageditshallberefittedorreplaced,properlyjoi
ntedandpolished.
Cement Concrete Tactile Tiles shall be of High Strength and high wear resistant
having high finish withwear resistant aggregates (silicon carbide or equivalent)
and balance colour coordinated aggregates inface mix. Tile shall be produced
with colour pigment specified by the architects, using UV resistantcolour
pigments fromLanxess.
Sr. Parameters Minimum Requirements
(Testing as per IS 13801:1993)
1. PercentageWaterAbsorptionNotover6%
2. Wettransverse strengthNotless than3MPA
3. AveragewearinThickness-AbrasionAverage wearnotmorethan2mm
4. ToleranceinSize (length+breadth)±1mm
5. ThicknessofwearinglayerNotlessthan8mm
6. VariationinThicknessoftilesVariationnottoexceed3mm
7. FlatnessoftilesurfaceConcavity/convexity nottoexceed1mm
8. Colours UV Light resistant fast colours from
Lanxess only to beused.
· TheTactileTilesmustconfirmto IS13801:1993.
· The Tiles must be manufactured on automatic machines with mechanical
vibration and rubberizedmoulds.
· TheTileswillbemade usingwearresistantmaterialsinthefacemixasspecifiedby
· TheTilesmustbe curedincontrolledenvironmenttoensureefflorescence freematerial.
· Themanufacturermusthaveinhousetestinglaboratorytocarryoutallte
stingincludingCompressive strengthtesting, Waterabsorption,
abrasionresistanceetc.
TheMeasurementoftheitemshallbe inSqmtbasis.
ModeofMeasurementandPayment
Kotaslabflooringshallbe measuredinm2for
visibleareaofworkdone.Lengthandbreadthshallbe
measuredcorrecttoa cmbeforelayingskirting, dadoorplaster.
No deductions shall be made or extra paid for any opening in the
floor area upto 0.1 m2. Nothingextra shall be paid for use of cut
tiles or for laying the floors at different levels in the same room
orcourtyard. Kota slabs laid in floor boarders and bands etc. shall
be measured in the same item andnothing
extrashallbepayableonaccountoftheseorsimilarbandsformedofhal
formultiplesofhalf sizestandardtiles/orother uncut tiles.
The rate shall include the cost of all materials (inclusive of all
taxes, levies, and delivery at site),labour & sundry involved in
all the operations, at all floors, at any height and level, as
describedabove. It shall also include for breakage and wastage.
Floating materials and margin of profit shallalso be included. All
material samples shall be approved by the Architect/Engineer-
in-chargebeforeplacingorders.
No extra shall be paid for any small quantities like narrow widths,
mitred & returned ends, rounds
&cutting,fixingandmakinggoodupto&aroundpipes, fittings
andfixtures etc.
The basic rate, if at all provided or agreed upon includes cost of
material, all taxes, levies & cost ofdeliveryatsite.
3.8 The kota stone shall be upto 300mm wide and 900 mm long with
champhering and polishing to allexposededges.
TheMeasurement oftheitem shallbeinSqmtbasis.
Providing and setting 50 to 60 mm thick rouge kotah stone water table in line, level
and in requiredgradient including 25 mm thick beddcing in C.M. 1:6 (1 Part of cement
: 6 Part of coarse sand) withsufficient rammingconsolidation.Providingjointsin
C.M.1:3(1Partof cement :3Part coarse
sand)andsmoothpointinginC.M.1:1(1PartofCement,1Partofcoarsesand)includingwater
ingetc.completeandasperdetailsintenderspecification&asdirectedbyengineerincharge.
Size:2'0"x1'0"(600mm×300mm)
Size:1'x1'(40to50mmthick)
ForrelevantSpecificationofItemasperitemdescription&instructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
Modeofmeasurementsshall be onRMTbasis.
Providing and making Tree pit. It includes excavation upto 600 mm depth including
removal of the debris,Size of the pit is 1000 mm dia. Hume pipe of 900 mm dia NP2
classwith 500 mm height to be placed in theexcavated pit and outside area of the
Hume pipe to be filled with the good quality earth completed asdirected by Engineer-
in-Charge. Hume pipe shall be filled with the garden soil,( 10Kg/per Tree pitofVermi
Compost or mixture of decade neem cake and tobaco powder). upto required depth
and remainingbottom part shall be filled with good soil completed as directed by
Engineer-in-Charge. Rate includes rateof hume pipe, garden soil with Vermi Compost
or mixture of decade neem cake and tobaco powder , goodsoiletc.
Thematerialshallbeofstandardspecificationsandshallbeapprovedbeforemassproduction.
2.0 Workmanship:
Excavationoftree pit shallbe carriedoutasperspecification.
Thepitprepared shall beclearedofall thedebris,roots and other deleteriousmaterials
attaining thenaturalearthlevelsufficient forthegrowthofthetrees.
TheBottom600mmdepthofthepitshallbefilledupwithgoodqualitygardenearthasapprov
edbyEngineer- In–Charge.
Thefillingshallbeproperlycompacted.
Inremaining600mmproperNP3 classHume pipe shallbe erected.
Thepipeshallbefactorymadeof900 mmdiasuchthatboth thefacesarefinished.
Nopieceofpipesbrokenfromfull lengthpipesshallbeusedfor this purpose.
TheHumepipeshallbesecuredintopositionbyfillingthesideswithgoodqualityearthandprope
TheinsideofHumepipeshallbefilledwithgardenearthalongwithFarmyardmanureand
requiredfertilizersetcas directedbyEngineer-In-Charge.
The rate shall be for per No of Tree pit prepared.
Providing and fixing tree guard, fabricated from 25 x 25 x 3 mm MS angle and 32 x
mm of 3.2 mm thickMS weld mesh as per drawing and details. Necessary provisions
for the anchoring to floor shall be made inthe tree guard. Tree guard shall be painted
with 1 coat of epoxy primer of 50 to 60 micron DFT (dry filmthickness) and 2 top
coats of Metal PU Paint of having DFT 40 to 50 micron of approved shade of MRF
orequivalent paint as per manufacture’s specification over all the surfaces or as
specified in the drawing asper the shade approved as per the drawing and
specification. The rate shall also include the fixing
ofnecessarynameplate.(Sampletobeapproved)
Relevant specifications shall be followed as per item no – 41 for tree guard as per
approved design. Treeguard shall be painted with 1 coat of epoxy primer and two coat
of PU paint of approved make and shade.Nameplate/signageshallbefixedas
directedbyengineer incharge.
TheMeasurement of theitemshallbeinNo. basis.
Providingandfixing75mmthickTreeGrating950*950*75mmasperdesignanddrawing.Therat
eshallbe inclusive of providing and laying 50 to 80 mm thick average bedding layer of
coarse sand below treegrating as per required grading and specification. The centre of the
grating to be same as the centre of thetree trunk. The grating to be 8 pieces as per drawing.
The work of the grating blocks shall be executed inlineandlevelbyskilledmason of
flooringwork only.
As per item decription or as decided by engineer in charge.
The Measurement of the item shall be in Number basis.
Providing & Supplying JCB Machine on rental basis in case of emergency situation
and break down type work & also during unavoidable condition as per instruction of
engg.incharge, rate includes all nece. shifting, fuel and operating charges and stacking of useful
& non-useful materials separately up to store. (No payment should be allowed for non working
condition of machinery and for pipe line excavation and laying work) (Based on Previously
approved rate by CE sir ) (AMC Drainage SOR-Jan-2016)
The Measurement of the item shall be in Hour basis.
Hiring of tractor with trolly considering 8 hours as working day hours incl.driver (Based
on GWSSB SOR 2022-23)
The Measurement of the item shall be in Day basis.
Supplying, labour for break down repairing work for activities like excavation, disliting,
removing debris from trench back filling etc. comp. as directed by Eng.in charge.(As per
Labour skill devlopment & Employment Department Government of Gujarat, Circular
Dated 01-04-2023 Annexure Sr.No.6)
The Measurement of the item shall be in Nos. basis.
Cont ractor’s Signat ure Add. City Engineer
ftuLx[tfxhle mne - rm¬tu Add. City Engineer
btuctEj lkch mt&u (œrûtK Ítul)
ybœtJtœ Bgwrlrmvj ftuvtuohuNl
ce çjtuf, vnujtu bt¤, mhœth vxuj CJl,
œtKtveX, ybœtJtœ
Email: [email protected]
mkœCo: ltKtk Ft<tlt mh¾gwjh lk.48 <t.29/01/2012, 58 <t.16/03/2012 ,
yt&e <btb Ft<tltk Jzt yr^fthe ©e ytu / yuftWxLx ©e <&t cej fjtfo ©e lu sKtJJtbtk ytJu
Au fu , me¾gtuhexe zevtuÍex <ubs yluoMxble zevtuÍex MjefthJt ctc<u htßg mhfth ©e îtht bkswh &guj
cukftule gtœebtk ltKtk rJCtdlt S.yth.lk. FD / MSM / e-file /4 /2024/ 4020/2859 D.M.O. Date:
01/05/2025 bwsc mw^thtu fhe lJe gtœe cnth vtzJtbtk ytJuj Au.
htßg mhfth ©e lt ltKtk rJCtdlt S.yth.lk. FD / MSM / e-file / 4 / 2023/4020 /
D.M.O. Date: 01/05/2025 îtht me¾gtuhexe zevtuÍex <ubs yluoMx ble le zevtuÍex btxu bkswh &guj
cukftu le gtœe ykdu zu.Bgw.frbNlh ©e (ltKtk) le b¤uj bkswhe X.lk.39 <t.12.05.2025 bwsclt
mœhnw vrhvºt «rmæ^ > <theF ctœ &e <t.31.03.2026 mw^e y&Jt htßg mhfth ©e îtht yt
ctc<u yLg S.yth. «rmæ^ fhJtbtk ytJu ðgtk mw^e yuluûth - 1 btk sKtJuj cukftu le cukf duhkxe
me¾gtuhexe zevtuÍex <&t E.yub.ze. MJYvbtk MJefthJtbtk ytJNu.
ybœtJtœ Bgwrlrmvj ftuvtuohuNl lt <btb Ft<tytu îtht bu¤JJtbtk / MJefthJtbtk ytJ<e
cukf duhkxe le ytu&uLxemexe le yr^f]< aftmKe fhelu / fhtJelu sYhegt< bwsclt fkx[tuj v{tumesh
muxyv fhJtlt hnuNu <ubs mhfth ©e lt S.yth. yLJgu zu.Bgw.frbNlh ©e (VtgltLm) le b¤uj
bkswhe bwsc btºt ybœtJtœ Nnuh le <&t ybœtJtœ rmJtglt yLg Nnuhle ntug ylu <u cukf duhkxe
ybœtJtœ ÂM&< mkckr^< cukfle NtFt îtht yr^f]< fhtguj ntug <tu leau sKtJuj ckuftu le
NtFtytule cukf duhkxe MJefthJtbtk ytJNu. ltKtk Ft<t îtht Wvhtu¾< mkœCobtk sKtJuj vrhvºttu le
yLg <btb Nh<tu g&tJ< hnuNu.
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period
up to March- 31, 2026. The validity cut-off date in the GR is with respect to the date
of issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
2. A U Small Finance Bank
4. Barclays Bank
5.City Union Bank
7.DBS Bank India Limited
9.Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
16.IDFC First Bank
17. Jammu & Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Nutan nagrik Sahakari Bank Limited
3. Rajkot Nagarik Sahakari Bank Limited
4. Saraswat Co-operative Bank
5. SBPP Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. The Gujarat State Co-Operative Bank
9. The Mehsana Urban Co-operative Bank Limited
10. The Surat District Co-operative Bank
11. The Surat Peoples Co-operative Bank
12. The Kalupur Commerical Co-operative Bank Limited
13. The Panchmahal District Co-operative Bank
14. The Baroda District Co-operative Bank
15. Baroda Gujarat Gramin Bank
16. Saurashtra Gramin Bank
Seal and Signature of the Bidder Add. City Engineer(South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the latest correction slips may be referred for quality of
construction & standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence
of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at
the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to
the quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission
18. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the guidance
of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations
as necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible
for all the costs where applicable of connection, meter installation, water consumed,
water required for testing purposes, disconnection and the laying, maintenances and
ultimate removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for
use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income
tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued
by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any
other special reason (like site is not available), after evaluation of situation the actual date
of starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per
guidelines published by WHO/ Center government/State government /Ahmadabad
municipal Corporation.
42. Contractor shall deploy proper barricatting at the site of execution with proper safety
Signature of contractor with seal Add. City Engineer
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal
Corporation, A'bad specified up to his first written demand, without demur without delay and
without the necessity of a previous of judicial or administrative procedures and without the necessity
to prove to the Bank the defects or short comings or debits of the contractor any sum within the limit
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during
the period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender)
we shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of
the Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or
Date: Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add. City Engineer Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - Construction of New Paver block and repairing work at Ghodasar Area &
other area and different locations from municipal councilor budget and other budget of
Isanpur ward of South Zone.
I/We the undersigned have carefully gone through and clearly understood the Tender
documents for the above work. I/We have satisfied myself/ourselves as to the location of site,
examined drawings. I/We have visited site & fully acquainted with local situations regarding
materials, labours & others factors pertaining to work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified
all in accordance with the specification, designs, drawing and instruction in writing referred to in the
said document and with such materials as are provided for, at the respective rates which I/we have
quoted in the schedule-B or at such other rates as maybe fixed under the provisions of these
conditions.In the event of this tender being accepted I/We agree to enter into an agreement and when
required andexecute the contract, according to your fom1 of agreement as or in default where of I/we
bind myself/ ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and
take necessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit",
for the sum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the
Employer If I/We fail to commence the work specified. Otherwise the said sum shall be retained, by
the Employer as on account of such. Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in
accordance with Conditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may
I/We am/are bound to execute the job if the work order is issued within 120 days from the
date of opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on
work, octroi duties and other prevailing Government taxes/charges on such items on which the same
are leviable and therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractorAddress
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth
ctœ&e dKJtbtkk ytJNu. <ubs ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt NY &guje dKtNu. <&t
<u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle <theF dKJtbtk ytJNu.
yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk J^w rJjkc ltk rfMmt btk
<ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu
vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo
fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe
bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht
ChJtle sJtc>the ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc
ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu
y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su
BGþrl.ftuvtuohuNl Juc mtEx www.ahmedabadcity.gov.in Wvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog
14. œhuf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz
ytuV «ufxem ltkk btLg ^tht ^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu.
Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu
òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s
c<tJuj søgtyu fhJwk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu
LþfNtl &Nu <tu <ule mkÃËKo sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb
œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.
vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK
vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e
bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu
ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu
sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu <ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015 bwsc <btb juch /
bsqhtulwk dwsht< rcÕzekd yuLz y^h fLMx[[fNl Jfombtkk VhSgt< hSMx[uNl fhtJJt ykdu ybj
fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch yufx «btKu ftgoJtne lrn &E
ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu <ulu vubuLx ytvJtbtk ytJNu lrn <ubs ct¤
bswhtulu ftb Wvh htFe NftNu lrn. <ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj
mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle-
J¤<hltu n¬ >tJtu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu
y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth
&Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu
ftuLx[tfxh îtht ftuEvK «fthle J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu
ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu
hnuNu. yLg&t ftuvtuohuNl îtht <u hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele
sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx
bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt
ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu ftuLx[tfxhu VhSgt<
ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx
Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx
bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt
ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu ftuLx[tfxhu VhSgt<
ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx
Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc
yLþmhJtltk hnuNu. Mt>h ÃþM<eft øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e
b¤e hnuNu. su Juc mtExwww.ahmedabadcity.gov.in Wvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
yt ykdultu mkÃËKo Fao <&t Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE
sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs
dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ >
vnujt, atÕþ ftbu <&t ftb ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk
vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e ftuBÃGþxhbtk Vtuxt x[tLmVh fhe
ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. sgtk ftuE atuFJx l &E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t
xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu
yum.ytu.yth.btk ytExb l ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu
<u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu. J^tht le ytRxb btk ftuLx[tfxhle
btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo,
jtj xul , cuhefuxekd xuv, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu
ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe
yuLSlegh©ele <ubtk mne juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t
yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu
ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt
yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe
BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu Add. City Engineer
btuctEj lkch mt&u (œrûtKÍtul)
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au ylu ftblu jd<t
btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo
Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu Add. City Engineer
btuctEj lkch mt&u (œrûtK Ítul)
" ybœtJtœ BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt œhuf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ J^thtu ytvJtbtk
ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe œhuf ytExbbtk J^^x &tg fu ytExb yufÍefGþx l
&tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult
btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu
dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, rœJt¤e, jøl meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK
cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu
ytJu <ulu je^u fhJtbtk ytJNu.”
ftuLx[tfxhle mne Add. City Engineer
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works.
Progress of work should be in proportion to time limit. The details of reinforcement of R.C.C. work
shall be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection
by Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall
be made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements
of binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have
to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work.
Contractor will be fully responsible for compliance of the various provisions under contract Act.
1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer
on his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order to
start the work the penalty of the 0.01% tender Amount per day of delay of start shall be recovered
separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft.
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R & B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be
applicable as per tender condition only.
Contractor'ssignature & Stamp Add. City Engineer
Mobile No.:- (South Zone)
ftblwk ltb :- œrûtKÍtul Rmlvwh Jtuzobtk Dtuztmh rJM<th <ubs yLg rJM<thbtk Bgw.ftW.©e csux <ubs
yLg csux btk &e swœe swœe søgtyu vuJh çjtuf lJt ltkFJt / heELMxuxbuLx fhJtlt ftb
It.No. Qty Item Description Rate Unit Amount
1 Dismantling the following including loading, unloading and
disposal of unserviceable material for all lead or as directed
by Engineer-In-Charge and stacking the serviceable material
and backfilling the resulting trenches and pits complete.
a central verge -kerb stone (AMC sor) Rmt
b Dismantling tiled or stone floors laid in mortar including Smt
7.00 stacking of serviceable material and disposal of 27.44
unserviceable material with all lead and lifts.(R&B SOR 2021-
22 ITEM CODE 20005 Item no.as per NBO 20.23)
c Demolition & disposal of unserviceable material with all lead Cmt
15.00 and lift for unreinforced concrete. (AMC sor) 348.10
2 Excavation of asphalt pavement of any thickness with all sub Sqm
- layer including demolishing the asphalt carpet, metal, soiling 140.00 -
using any type of road cutter and breaker machine
(controlled cutting) including cost of operator, fuel, &
transportation etc complete with stacking the material as
directed. (CG Road Approved Rate)
3 Repairing damaged M.H. and rasing M.H. up to road level
4.00 incl. removing damaged brick work and repairing by brick -
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris from
MH and carting the same as directed. (Based on
DrainageSOR 2009-10) Road Resurface zonal tender
approved rate 2022-23
a (A) up to 0.15 mt. (@ Two Coarse) No
b (B) up to 0.35mt. (@ Four Coarse) No
4 Repairing damaged I.C./ Raising removing damaged brick No
- work and repairing by brick masonry in C.M. 1:5 and plaster 399.96 -
in C.M. 1:3 and fixing C.I. steps and existing chamber sheet
cover, removing the debris from chamber and carting the
same as directed. (Based on Drainage SOR 2009-10) Road
Resurface zonal tender approved rate 2022-23
5 Conveyance charge of earth, lime, murrum, building rubbish,
7.00 manure, garbage, sludge, excavated rock, fly ash, aggregates -
of any kind executed outside the road site. Rate also includes
spreading & levelling etc complete. Internal conveyance
above 50 mt done within the work site is not payable. (R&B
2021-22 Statement No.5 Page no.5 & RA Approved
St.Com.Res No.189,Dt.19/05/2022)
e e) Lead From 4 Km to 5 Km. Cmt
f f) Lead From 5 Km to 10 Km. Cmt
g g) Lead From 10 Km to 15 Km. Cmt
6 Providing F.R.C. MH seat cover incl. carting to the work site
1.00 etc. comp. Directed. (Based on rate of central store circular -
a F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers. Cover : No
1.00 728mm ø & 100 mm thick circular cover, 35.00 MT load 1,368.75
design, 100x2mm MS flat allround, 16mm ø plain round bar
for lifting the cover & should be fitted with plastic cups.
7 Carting and Fixing M.H., Chamber or Catchpite Seat and No
50.00 Cover in line and level to match existing road level in C.C. 746.59
1:2:4 and finishing smooth, watering and protecting for
days etc. complete as directed. M.H. seat cover will be
supplied byA.M.C.(from any store) (AMC approved rate)
8 Providing cast iron machine hole frame of weight 80 to 85 kg Kg
1.00 suitable for existing EHD- 35 FRC MH cover, rate also 71.10
incl. loading, unloading the frame as per instruction by
engg. in charge. (AMC approved Rate )Zonal Tender
9 Constructing Bombay Pattern Type Catch Pit of size 0.60 x No
1.00 0.60 depth up to 1 mt including excavation, B.B.C.C. (1:5:10), 3,110.80
23 cms thick brick maso. wall in the prop. of CM (1:6) with
mm thick IPS flooring in the prop M15 at bottom and 15 mm
thick cement plaster inside the catch pit in the proportion of
CM (1:3) without jali etc. comp.as directed. (AMC approved
10 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with No
25.00 frame 600mm x 600mm clear opening etc. comp.. As 1,377.64
directed by engineer in charge. (AMC approved Rate )
11 Box cutting the road surface to proper slope and camber for Cmt
35.00 making a base for road work including removing the 127.13
excavated stuff and depositing on the road side slope as
directed upto 200 Mt.lead.(R&B SOR 2021-22 ITEM CODE
26008 Item no.as per NBO )
12 Providing and laying cement concrete 1:5:10 (1- Cement : 5- Cmt
10.00 fine sand : 10- graded brick bat aggregates 40mm nominal 1,901.59
size) and curing complete.(R & B SOR Item code 05009A,
NBO 5.3.8 Page 74) Road Zonal tender 2022-23
13 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Cmt
20.00 Coarse sand : 6- Hand broken stone aggregates 40mm 2,339.59
nominal size) and curing complete.(R & B SOR Item code
05003A, NBO 5.3.2 Page 73) Road Zonal tender 2022-23
14 Supplying and Spreading good quality coarse sand free from Cmt
2.00 Impurities including Transporation to Site and labour cost for 312.50
Spreading etc. Comp. as directed.( Approved AMC rate)Road
Zonal tender 2022-23
15 Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including -
premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in
uniform layers in sub- base / base course on well prepared
surface and compacting with vibratory roller to achieve the
desired density as per Codal Provision.(RA Approved
St.Com.Res No.189,Dt.19/05/2022)Road Zonal tender 2022-
a Production & Supply of WMM Cmt
b Laying of WMM Cmt
16 Providing and Casting in situ ordinary cement concrete M200 Cmt
100.00 for R.C.C. Raft and cutt off walls including necessary 3,672.30
shuttering laying, vibrating, ramming and curing
complete.(B) Walls, fom top of foundation level upto floor
two level (upto 10ton). (As Per Auda Approval Rate)
17 Labour work for fixing any kind of paving with cement Smt.
52.00 pointing in CM 1:2, including watering, ramming etc comp. 69.64
as dir.For pavement aI) Laying on Sand bedding as per
requirement to fix the C.C.Block / Nibhada Stone in Line &
18 Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Rmt
15.00 Kerb block for Central Verge in M-20 grade using 20 mm 431.96
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory
system for kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc. complete.
The rate shall also include necessary cutting of asphalt, fixing
the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb stone
fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In
any case Gravel or such type of materials shall not be
allowed for production.(AMC approved Rate) a) Laying on
cm thick Sand Bedding
19 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Rmt
14.00 Kerb block for Footpath in M-20 grade using 20 mm nominal 350.89
size black trap aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably exposed finish/
formwork , mould with well equipped with vibratory system
for kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The
rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb stone
fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In
any case Gravel or such type of materials shall not be
allowed for production. (AMC approved Rate )a) Laying on
cm thick Sand Bedding
20 Pre cast concrete kerb Providing and fixing M25 Grade of Rmt
310.00 concrete precast exposed / Fair finish / texture finish kerb 1,061.61
stones of approved make as per approved sample of any size
and any type. Kerbs shall be fixed on the foundation
prepared as per approved design. The rate shall also include
for erecting and fixing the pieces in position for complete
kerb system with chamfered type of kerbs including
necessary accessories of kerb like radius kerb, angles and
quadrant kerbs, droplet kerbs etc. complete as per drawing.
Kerb shall be fixed as paper joint without any jointing
material. However cement mortar shall be provided at the
backside of kerb stone joint. (Sample must be approved) Cost
of excavation, cutting , base , side filling shall includes as
directed engineer - incharge in above item description as per
BOQ (a) 450 hight x 600x 150 mm high median kerb.As per
21 Providing and Laying of Rubber Moulded Paver Block Smt
65.00 Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape 501.60
(Usually Bricks/ Uni-Paver Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentioned in the drawing / instruction of engineer in charge.
Cost includes formworks using rubber mould, Rate providing
and laying paver blocks as per required grading and
specification. The paver block shall be mechanically
compacted. The work of paving blocks shall be executed in
line and level by skill mason of flooring work only. It should
be laid in such a way that the no cutting of the paver block to
be necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The finished
surface of the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be relaid
if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5cms thick sand
beddding.(AMC approved Rate )
22 Providing and laying of interlocking grey paver blocks of high Smt
7.00 density 80mm thick made from M- 40 grade concrete using 6 572.00
mm to 20 mm machine crushed well graded stone aggregate,
sand of approved quality, OPC 53 grade cement with
contractor's own concrete mix design as approved by AMC,
for parking, road. Cost Includes formwork, using rubber/FRP
mould, laying paver block as per required grading and
specification laid paver block shall be mechanically
compacted. The work of the paving blocks shall be executed
in line and level by skilled mason of flooring work only. It
should be laid in such a way that the no cutting of the paver
block to be necessary. Cutting of paver block by machine cut
only and carting to be done. The Finished surface of the
Paver Block shall have reasonably good plain finish. Paver
blocks shall be compacted and shall be re-laid if necessary.
Gravel or such type of materials shall not be allowed for
production. Laying on 5 Cms thick sand bedding.(AMC
approved Rate )
23 Paver Block Providing and laying shot blasted Non - Smt
38.03 interlocking, Paver blocks of specified thickness, size, grade 669.65
of concrete and colour machine made and blasting by
automatic shot blasting machine and high density of as per
approved sample of approved make for footpath, parking
areas, service lanes,cross over and other areas as mentioned
in the drawing. Including providing and laying 50 mm thick
averave bedding layer of coarse sand below paver block as
per required grading and specification. Laid paver block shall
be mechanically compacted. The work of the paving blocks
shall be executed in line and level by skilled mason of
flooring work only. Small size of paver block with same
specification shall be used at residue or at end. It should be
laid in such a way that the no cutting of the paver block to be
necessary. If cutting of paver block shall be required , than
cut by machine only and laying to be done by skilled flooring
mason. The finished surface of the paver block shall have
coarse sand Texture Finish. Pave blocks shall be compacted
and shall be re- laid if necessary. Actual laid area shall be
measured and paid without any wastage. (A) 60 mm thick M-
35 grade Grey Paver block of size 200mm x 200mm.(AMC
24 Providing and laying cement concrete tactile tile (for vision SMT
2.00 impairedpersons as per standards) of size 300 x 300 x 25 to 702.24
30mm of Vyara, Super, Nishu approved make and pattern
having water absorption not over 6% and conforming to IS:
13801:1993, of approved make, pattern and shade (with UV
light resistant colours from Lanxess only) in outdoor floors
such as footpath, court yard, multi modals location etc., laid
on 30 to 40mm thick base of cement mortar 1:4 (1 cement :
4 coarse sand) in all shapes & patterns including grouting the
joints with white cement mixed with matching pigments etc.
complete as per direction of Engineer-in-Charge.(CG Road
25 Providing and setting 50 to 60 mm thick rouge kotah stone
30.00 water table in line, level and in required gradient including -
25 mm thick beddcing in C.M. 1:6 (1 Part of cement : 6 Part
of coarse sand) with sufficient ramming consolidation.
Providing joints in C.M. 1:3 (1 Part of cement : 3 Part coarse
sand) and smooth pointing in C.M. 1:1 (1 Part of Cement,
Part of coarse sand) including watering etc. complete and as
per details in tender specification & as directed by engineer
in charge. (SMC Approved tender Rate) Road Zonal tender
a Size : 2'0" x 1'0" (600mm × 300mm) Rmt
b Size : 1' x 1'(40 to 50 mm thick) Rmt
26 Providing and making Tree pit. It includes excavation upto No
1.00 600 mm depth including removal of the debris, Size of the pit 844.87
is 1000 mm dia. Hume pipe of 900 mm dia NP2 class with
500 mm height to be placed in the excavated pit and outside
area of the Hume pipe to be filled with the good quality
earth completed as directed by Engineer-in-Charge. Hume
pipe shall be filled with the garden soil,( 10Kg/ per Tree pit of
Vermi Compost or mixture of decade neem cake and tobaco
powder). upto required depth and remaining bottom part
shall be filled with good soil completed as directed by
Engineer-in- Charge. Rate includes rate of hume pipe, garden
soil with Vermi Compost or mixture of decade neem cake
and tobaco powder , good soil etc.(CG Road Approved Rate)
27 Providing and fixing tree guard, fabricated from 25 x 25 x 3 Nos
1.00 mm MS angle and 32 x 32 mm of 3.2 mm thick MS weld 2,131.91
mesh as per drawing and details. Necessary provisions for
the anchoring to floor shall be made in the tree guard. Tree
guard shall be painted with 1 coat of epoxy primer of 50 to
60 micron DFT (dry film thickness) and 2 top coats of Metal
PU Paint of having DFT 40 to 50 micron of approved shade of
MRF or equivalent paint as per manufacture’s specification
over all the surfaces or as specified in the drawing as per the
shade approved as per the drawing and specification. The
rate shall also include the fixing of necessary name plate.
(Sample to be approved) (CG ROAD Approved Rate)
28 Providing and fixing 75 mm thick Tree Grating 950*950*75 No.
10.00 mm as per design and drawing. The rate shall be inclusive of 836.61
providing and laying 50 to 80 mm thick average bedding
layer of coarse sand below tree grating as per required
grading and specification. The centre of the grating to be
same as the centre of the tree trunk. The grating to be
pieces as per drawing. The work of the grating blocks shall be
executed in line and level by skilled mason of flooring work
only. (Sola Scienecity Road tender Rate)
29 Providing & Supplying JCB Machine on rental basis in case of hr
10.00 emergency situation and break down type work & also 535.71
during unavoidable condition as per instruction of
engg.incharge, rate includes all nece. shifting, fuel and
operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be
allowed for non working condition of machinery and for pipe
line excavation and laying work) (Based on Previously
approved rate by CE sir ) (AMC Drainage SOR-Jan-2016)
30 Hiring of tractor with trolly considering 8 hours as working Shift
5.00 day hours incl.driver (Based on GWSSB SOR 2022-23) 2,104.09
31 Supplying, labour for break down repairing work for activities
15.00 like excavation, disliting, removing debris from trench back -
filling etc. comp. as directed by Eng.in charge.(As per Labour
skill devlopment & Employment Department Government of
Gujarat, Circular Dated 01-04-2023 Annexure Sr.No.6)
a Mazdoor at day /Night NO
B Makadam/ supervision at day / Night NO
32 Labour charge of cutting in bituminous pavement Cutting to Rmt
100.00 be done with heavy duty tandom cutting machine consist of 125.00
diamond blade. Minimum cutting depth shall be 75mm from
the finished level. Cutting shall be perfecty in line. The width
and depth of the removal of asphalt towards kerb stone shall
be as per the drawing. Bitumen shall be carefully removed so
that the the cutting edge towards the road should no be
disturbed. The work of removal of the asphalt will be
considered in this item as running meter of the cutting done
by achine. One cutting line will be considered per length of
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Add. City Engineer
mobile no. (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
801 technical bid.pdf
801 pavor blok.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .