Loading…
Loading…
Tender ID
Tender Value
₹9.3 L
EMD Value
₹9,322
Closing Date
22 Jun 2026, 5:00 pmClosed
Executive Officer, Jajpur Municipality, Jajpur
Executive Officer, Jajpur Municipality, Jajpur
Works
2026_ORULB_131633_4
2272/JM/08.06.2026
Open Tender
Civil Works - Others
Percentage
60 days
Executive Officer, Jajpur Municipality, Jajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Executive Officer, Jajpur Municipality, Jajpur
₹9,322
Yes
11 Jun 2026
11 Jun 2026
25 Jun 2026
11 Jun 2026
22 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Deweeding- Uprooting rank vegetrain and weeds by digging the area to a depth of 60cm removing all weeds and other growth roots,etc | - | sqm | 1 | - |
| 1.02 | Earth work in excavation of foundation in hard soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | 1 | cum | - | - |
| 1.03 | Supplying and filling Foundation and Plinth with sand including watering and ramming with cost,conveyance,royalities of sand etc complete. | 1 | cum | - | - |
| 1.04 | Supplying all materials, labour, T&P and providing Cement Concrete (1:3:6) using 40 mmsize CBHG metal including cost,conveyance,royalities of all the materials with watering,curing etc. complete. | - | cum | - | - |
| 1.05 | Supplying all materials,labour.T&P and providing reinforced cement concrete work of M25 grade with 20mm and down grade black hard granite crusher broken stone chips,etc | - | cum | 1 | - |
| 1.06 | cutting, straighting coiled or bent up TOR Steel, bending, binding, welding and jointing if necessary and typing the grills and placing in position incliding cost of binding wire etc | 1 | qntl | 1 | ₹1 |
| 1.07 | Supplying all materials , Labour, T&P and providing rigid and smooth centering and shuttering for RCC works,etc a. RCC Foundation,footing and column base. A. colimn base and footing | - | sqm | - | - |
| 1.1 | Supplying all materials , Labour, T&P and providing rigid and smooth centering and shuttering for RCC works,etc a. RCC Foundation,footing and column base b. vertical walls | 1 | sqm | - | - |
| 1.12 | Supplying all materials , Labour, T&P and providing rigid and smooth centering and shuttering for RCC works,etc a. RCC Foundation,footing and column base c. rcc slabs | - | sqm | - | - |
| 1.17 | Back filling with excavated earth | 1 | cum | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_595691.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .