Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 CrAdmitted-Finance | -36.99% | ₹4.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.7 Cr+₹5.8 L (1.24%)Admitted-Finance | -36.21% | ₹4.7 Cr+₹5.8 L (1.24%) | L2 | Admitted-Finance |
| 3 | L3₹6.0 Cr+₹1.4 Cr (29.2%)Admitted-Finance | -18.59% | ₹6.0 Cr+₹1.4 Cr (29.2%) | L3 | Admitted-Finance |
| 4 | L4₹6.1 Cr+₹1.5 Cr (31.6%)Admitted-Finance | -17.11% | ₹6.1 Cr+₹1.5 Cr (31.6%) | L4 | Admitted-Finance |
Tender Value
₹7.4 Cr
EMD Value
₹14.8 L
Closing Date
24 Mar 2025, 6:00 pmClosed
Addl. CHief Engineer PHED Region Ajmer
Addl. CHief Engineer PHED Region Ajmer
As per TD
2025_PHCJA_445962_1
NIT No.19/2024-25 of ACE PHED Region Ajmer
Open Tender
Civil Works - Water Works
Percentage
1825 days
Malpura
As per TD
22 documents required · 22 mandatory
₹10,000
Executive Engineer PHED Dn. Malpura
₹14.8 L
Yes
Addl. CHief Engineer PHED Region Ajmer
26 May 2025
5 Feb 2025
25 Mar 2025
5 Feb 2025
24 Mar 2025
5 Feb 2025
21 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Operation & Maintance of Reg. WSS of 55 villages and their dhanies from Todaraisingh PS on Transmission Main II under sub division Todaraisingh as per scope of work, and existing pumping System Pump Houses, CWR Pump House , Cleaning of OHSR/CWR/GLSR every six month, Cleaning of all pump Houses Campus, Mainatining of garden and lawn, Maintaining of Rising and Distribution Pipe Line, Daily valve operation for given Supply of OHSR/GLSR, CWR, and Direct supply etc. This work includes maintaining the records, maintaining power factor 0.96 and Above, dosing of chlorination as bleaching powder/chlorine gas, pump log book, material consumption statement, detail of The leakage repair, and submitted to concerned JEN / AEN every month. Chemicals like Alumina ferric,bleaching powder and Liquid chlorine supplied by department to Transportaion of Meterial from Division Store to sub Division is part of contractor. Electricity bill shall be paid by the department. All other expances, taxes etc are to be borne by contractor.(for 7 Years period with every consecutive Year 5% increment) | |||||
| 1.01 | O& M cost for I st year | - | Nos | 1,34,06,788.81 | - |
| 1.02 | O&M cost for II nd year | - | Nos | 1,40,77,128.25 | - |
| 1.03 | O&M cost for III rd year | - | Nos | 1,47,80,984.66 | - |
| 1.04 | O&M cost for IV th year | - | Nos | 1,55,20,033.89 | - |
| 1.05 | O&M cost for V th year | - | Nos | 1,62,96,035.59 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.28 MB
Tender-Document-19-160-Villages.pdf
Tender Documents • 6.65 MB
BOQ_800882.xls
BOQ • 0.25 MB
BOQ.xls
BOQ • 0.25 MB
Tenderdocument.pdf
Tender Documents • 6.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .