Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
24 Mar 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Petlad Irrigation Division Petlad
Restoration To Cambay Branch by providing C.C. Lining. & Key wall In between 11125 m to 12800 m under Juridiction of Changa Section of Sojitra Irrigation Sub division
279046
20 of 2025-26
Open
Miscellaneous Works
Works
Anand
11 documents required · 10 mandatory · 1 optional
₹6,000
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹4.4 L
Yes
23 Feb 2026
23 Feb 2026
23 Feb 2026
24 Mar 2026
23 Feb 2026
BILL OF QUANTITIES
Name of work :- Restoration To Cambay Branch by providing C.C. Lining. & Key wall In
between 11125 m to 12800 m under Juridiction of Changa Section of
Sojitra Irrigation Sub division
Estimated Rate without Total Amount
Estimated Rate without Total Amount
Sr.No Quntity Item Unit Without GST Rs.
In figures In World
Clearing the shrubs, like akadas, Err:508
weeds and other vegetables including
depositing the same outside and
burning etc. complete from canal bed,
top and both slopes of the banks, for
canal with discharge. (C ) For Canals
Above 250 Cusec.
Earth work in embankment using Err:508
selected soil, soft & hard murrum
excavated from approved borrow area /
village tanks etc. Including conveying,
spreading in uniform layers, breaking
clods and dressing to the designed
2 4482.00 canal section etc. with lead upto 500m CM 91.75
and all lift.(For canals having capacity
beyond 300 Cusec) ( By Machinery )
Lead upto 1.5 Km
Compaction for making embankment Err:508
for canal by laying in regular layers of
15 cm in thickness including breaking
clods to 25 mm size incl. light rolling
3 4482.00 by suitable rollers with slight watering CM 27.70
to facilitate rolling and dressing the
side slopes etc.
Clearing the silt from the Canal Err:508
bed/Slope by digging the same to the
required bed level and gradient
including depositing the excavated
earth regularly in spoil bank for
utilizing the same preparing the banks
4 15207.00 after breaking clods as and where CM 78.30
directed for lead upto 50 m. and all
lifts. (BY MACHINERY) For Lead upto
1.5 km Excluding Dewatering
Scrapping out the old plaster and Err:508
5 34651.00 cleaning the surface including racking SM 86.60
out the joints 20 mm. deep.
Providing and laying plain/reinforced
cement concrete lining of M-15 (MSA
20 mm) in bed, side slopes and
curvature including batching, mixing,
transporting, placing, vibrating,
smooth finishing, curing including
6 dewatering where required.
(MACHINERY BASED by "BATCH MIX
PLANT & TRANSIT MIXER" - WITH
PAVER MEMBRANE CURING )
(A)10.00 cm thick lining in Bed / Slope Err:508
(B)20.00 cm thick lining in Bed / Slope Err:508
Providing & Placing in position Err:508
reinforcement bars including cutting,
bending, welding joints where
7 8.900 necessary, hooking etc. complete as MT 82019.00
per drawing for all lead and lifts.A)TMT
/ CRS (FE 500 D)
Providing groove and filling expansion Err:508
joint of size 12 mm wide and 25 mm
deep in canal lining during
construction with two coats of primer
and filled with bituminous and fine
sand in proportion of 2:1, as directed
Providing & Laying in position with Err:508
Batch Mix Plant & Transit Mixer
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate
for C.C./ R.C.C work including
necessary formwork, centering,
scaffolding, compaction by vibrator,
curing as directed with all lead & lift
9 829.00 etc complete without dewatering and CM 5022.00
excluding the cost of steel
reinforcement.(A) For Pier and
Abutments/Wing wall/Head
wall/Return wall/Dowel Wall etc.a)
Concrete grade M-15 and MSA-20 mm
Providing inspection steps while lining Err:508
along the canal slopes as per drawing
etc. complete as directed.
Excavation for foundation in all sorts Err:508
of soil including yellow sandy gravelly
soils ,soft & hard murrum etc. in dry
condition including depositing the
excavated stuff in uniform layers in
11 293.00 banks or as and where directed etc. CM 102.40
complete for lead up to 500m and all
lift. (BY MACHINERY) (a) Excluding
Backfilling the foundation trenches Err:508
around the structures etc with selected
12 996.00 excavated stuff including watering, CM 36.90
ramming, compacting etc. complete.
Providing and laying burnt brick Err:508
masonry in foundation ordinary
portland cement mortar 1:5 proportion
13 12.00 including, curing etc. complete for all CM 5040.10
leads and lifts. (Conventional Bricks)
Providing cement plaster in thickness Err:508
and proportion as under including,
smooth finishing, curing, scaffolding
14 68.00 etc. complete for all leads and lifts.(A) SM 193.20
Cement mortar 1:3 proportion. ( b )
Providing and fixing in position Err:508
( different diameter ) NP2 R.C.C. pipe
with collar including filling and
caulking the joints with cement mortar
15 48.00 1:1 proportion, finishing to design Rmt 535.80
grade and level curing etc. complete for
all leads and lifts.(a)NP-2 class
Overhauling and oiling greasing of Err:508
branch/distributary/minor etc comp
as directed New / Repairing of steel
gate including providing basic steel
16 201.00 material; M.S. Shaft plate, angles, Kg. 127.20
channels etc. incl. fabrication
transporting to site & erection and
painting etc. complete.
Providing and fixing the iron rod for Err:508
steel gates including providing big size
17 6.00 thread and finishing as required etc Rmt 1268.50
comp.(A)For 38 mm dia rod
Providing and fixing heavy duty CI nut Err:508
for steel gates as directed etc comp.(a)
18 3.00 For 38 mm dia rod length. Height of No. 1300.00
nut is 120 x 120 x 100 cuting.
Providing and fixing heavy duty thrust Err:508
bearing for following dia as directed etc
19 3.00 comp a- for 38 mm dia and 50 mm dia No. 800.00
bar and ID/OD 65mm to 95 mm
Providing and Laying HDPE Film of Err:508
750 micron in bed and slopes of canal
at the required level etc complete
Total Rs…(Without GST)
Rs. Four Crore Forty One Lac Eighteen Thousand Six Hundred Thirty Six & Ten Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of
Division or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule
should be filled in inkand total of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all
respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. KM= Kilo metre, Kg= Kilo gram MT -
Metric Tonne Rmt = Running metre, CM= Cubic metre, SM= Square metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24
Deputy Executive Engineer Divisional Account Officer
Sojitra Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Percentage Calculation Percentage Calculation
Name of work :- Restoration To Cambay Branch by providing C.C. Lining. & Key wall In between 11125 m to 12800 m under Juridiction of Changa Section of Sojitra Irrigation Sub division
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL Total Item Cost Total %
Sr. Estimated but according to Per Unit Cost Per Unit Cost Unit Cost Per Unit Bitumen Unit y Per Unit Machinery Comodity Comodity cost per
No. may be more estimated Rs. Cost Cost Per Unit Cost Unit
Clearing the shrubs, like akadas, weeds
and other vegetables including
depositing the same outside and
burning etc. complete from canal bed,
top and both slopes of the banks, for
canal with discharge. (C ) For Canals
Above 250 Cusec.
Earth work in embankment using
selected soil, soft & hard murrum
excavated from approved borrow area /
village tanks etc. Including conveying,
spreading in uniform layers, breaking
canal section etc. with lead upto 500m
and all lift.(For canals having capacity
beyond 300 Cusec) ( By Machinery )
Lead upto 1.5 Km
Compaction for making embankment
for canal by laying in regular layers of
15 cm in thickness including breaking
clods to 25 mm size incl. light rolling by
suitable rollers with slight watering to
facilitate rolling and dressing the side
Clearing the silt from the Canal
bed/Slope by digging the same to the
required bed level and gradient
including depositing the excavated
earth regularly in spoil bank for
utilizing the same preparing the banks
directed for lead upto 50 m. and all lifts.
(BY MACHINERY) For Lead upto 1.5 km
Excluding Dewatering
Scrapping out the old plaster and
out the joints 20 mm. deep.
Providing and laying plain/reinforced
cement concrete lining of M-15 (MSA
mm) in bed, side slopes and curvature
including batching, mixing,
transporting, placing, vibrating, smooth
finishing, curing including dewatering
where required.(MACHINERY BASED by
"BATCH MIX PLANT & TRANSIT
MIXER" - WITH PAVER MEMBRANE
(A)10.00 cm thick lining in Bed / Slope
(B)20.00 cm thick lining in Bed / Slope
Percentage Calculation Percentage Calculation
Name of work :- Restoration To Cambay Branch by providing C.C. Lining. & Key wall In between 11125 m to 12800 m under Juridiction of Changa Section of Sojitra Irrigation Sub division
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL Total Item Cost Total %
Sr. Estimated but according to Per Unit Cost Per Unit Cost Unit Cost Per Unit Bitumen Unit y Per Unit Machinery Comodity Comodity cost per
No. may be more estimated Rs. Cost Cost Per Unit Cost Unit
Providing & Placing in position
reinforcement bars including cutting,
bending, welding joints where
drawing for all lead and lifts.A)TMT /
Providing groove and filling expansion
joint of size 12 mm wide and 25 mm
deep in canal lining during construction
with two coats of primer and filled with
bituminous and fine sand in proportion
of 2:1, as directed etc. complete.
Providing & Laying in position with
Batch Mix Plant & Transit Mixer
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate for
C.C./ R.C.C work including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc complete
without dewatering and excluding the
cost of steel reinforcement.(A) For Pier
and Abutments/Wing wall/Head
wall/Return wall/Dowel Wall etc.a)
Concrete grade M-15 and MSA-20 mm
Providing inspection steps while lining
along the canal slopes as per drawing
Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils
,soft & hard murrum etc. in dry
condition including depositing the
excavated stuff in uniform layers in
complete for lead up to 500m and all
lift. (BY MACHINERY) (a) Excluding
Backfilling the foundation trenches
around the structures etc with selected
ramming, compacting etc. complete. (By
Providing and laying burnt brick
masonry in foundation ordinary
including, curing etc. complete for all
leads and lifts. (Conventional Bricks)
Percentage Calculation Percentage Calculation
Name of work :- Restoration To Cambay Branch by providing C.C. Lining. & Key wall In between 11125 m to 12800 m under Juridiction of Changa Section of Sojitra Irrigation Sub division
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cement Total Cement Steel per Total Steel Bitumen Total PoL Per Total PoL cost Machiner Total Other Total Other TOTAL Total Item Cost Total %
Sr. Estimated but according to Per Unit Cost Per Unit Cost Unit Cost Per Unit Bitumen Unit y Per Unit Machinery Comodity Comodity cost per
No. may be more estimated Rs. Cost Cost Per Unit Cost Unit
Providing cement plaster in thickness
and proportion as under including,
smooth finishing, curing, scaffolding
Cement mortar 1:3 proportion. ( b )
Providing and fixing in position
( different diameter ) NP2 R.C.C. pipe
with collar including filling and
caulking the joints with cement mortar
and level curing etc. complete for all
leads and lifts.(a)NP-2 class 225 mm dia
Overhauling and oiling greasing of
branch/distributary/minor etc comp as
directed New / Repairing of steel gate
including providing basic steel material;
incl. fabrication transporting to site &
erection and painting etc. complete.
Providing and fixing the iron rod for
steel gates including providing big size
comp.(A)For 38 mm dia rod
Providing and fixing heavy duty CI nut
for steel gates as directed etc comp.(a)
is 120 x 120 x 100 cuting.
Providing and fixing heavy duty thrust
bearing for following dia as directed etc
bar and ID/OD 65mm to 95 mm
Providing and Laying HDPE Film of
required level etc complete
Signature of Contractor Deputy Executive Engineer Executive Engineer
Sojitra Irrigation sub Division Petlad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 20 of 2025-26 Online - Copy.pdf
Notice Inviting online Tender.pdf
NEW SBD BOOK 11125 m 12800 m.pdf
BOQ and POL.pdf
5.1 Special Condition 1.pdf
5.2 Special Condition 2.pdf
6 Work and Site Condition.pdf
6.1 Material Specifications.pdf
6.2 Itemwise Technical Specification.pdf
7 General Condition.pdf
10 Testing Norms.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .