Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance 38A BALLYGUNGE BROAD STREET BROAD STREET KOLKATA WEST BENGAL 700019 | KOLKATA | WEST BENGAL | 700019 | ₹1.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.8 Cr+₹9.7 L (5.87%)Accepted-Finance 14 1B EZRA STREET WORLD TRADE CENTER 9TH FLOOR EZRA STREET EZRA STREET KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | ₹1.8 Cr+₹9.7 L (5.87%) | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender specific OEM Authorization Certificate not submitted |
| 4 | Rejected-Technical 5A SYNERGY BUILDING THAKDARI RAJARHAT KOLKATA WEST BENGAL 700102 | 24 PARAGANAS NORTH | WEST BENGAL | 700102 | - | - | Rejected-Technical No response received for clarification on shortfall documents |
| 5 | Rejected-Technical 104 105 SUNEJA TOWER 1 DISTRICT CENTRE JANAKPURI NEW DELHI DELHI 110058 | WEST DELHI | DELHI | 110058 | - | - | Rejected-Technical Tender specific OEM Authorization Certificate not submitted |
Tender Value
₹1.9 Cr
Closing Date
31 Aug 2021, 3:00 pmClosed
DGM (IT)
O/o RED (NER), AAI, RHQ,
Facility Management Services of IT infrastructure at New Integrated Terminal Building Agartala Airport for 3 years
2021_AAI_84522_1
AAI/NER/IT/FMS/Agartala
Open Tender
Information Technology
Works
1095 days
New Terminal Bldng., Agartala Airport
Please refer Tender documents.
24 documents required · 24 mandatory
₹1,770
Yes
Exempted
8 Oct 2021
10 Aug 2021
2 Sept 2021
10 Aug 2021
31 Aug 2021
10 Aug 2021
10 Aug 2021 - 27 Aug 2021
Amount
SH-I Service support engineer charges for maintaining IT Infrastructure
Service support with 1 Engineer on 24 X 7 X 365 Days – Round the clock (minimum 3 shifts per day) basis for ACTIVE NETWORK
Service support with 1 Engineer on 24 X 7 X 365 Days- Round the clock(minimum 3 shifts per day) basis for PASSIVE CABLING
One (01) Support Staff for (Active and passive) in General Shift
Sub Head- II
Supply of SM OFC.
Supply of SM OFC 24 Port LIU with accessories (Fully loaded adapters connectors and other accessories)
Supply of 3meter Fiber optic patch Cord (SC-LC/ LC-LC or in line with requirements)
Supply of Cat 6A cable-- 66 Boxes (305 mtrs. Per Box) or 40 Boxes (500 Mtrs)
Cat 6A UTP Information Outlet with Faceplate & Box set
Supply of RJ-45 connector
Supply of Wall Mount 12U Rack
Supply of Power Distribution Unit 5/15 Amp
Supply of 1.5” Casing and Capping
Supply of 25mm, ISI Certified Chemical Resistant PVC Conduit: [Other Specifications: Max. Service Temperature 140°F with De-Rating Factor of 0.50, Pressure Ratings 120 - 810psi]
Supply of 25MM, ISI certified MS conduit
Supply of 32mm ISI Certified Stress Crack Resistance PE100 HDPE Pipe. [Other Specifications: Density of 940.0 to 958.0 KG/M3, Melt Flow Rate of 0.2to1.1 g/10 Mins, Carbon Black Content of 2.5 + 0.5%, Heat Reversion of 3%, Pressure Grade of PN16 (Green), Thermal Conductivity of 0.4 W/MK]
Sub Head- III
Laying, Testing of Single Mode 6 core Fiber cable on surface/wall/false ceiling or terrace as required (inclusive of fixtures)
Laying, Testing of CAT 6, 4-Pair UTP cable (cable laying / relay/ Removing through PVC conduits, casing and capping etc.)
Installation charges PVC pipe / PVC Channel / GI pipe for Laying of OFC / UTP (inclusive of fixtures)
Fixing of 32mm ISI Certified Stress Crack Resistance PE100 HDPE on wall including fixtures
Installation charges MS conduit for Laying of OFC /UTP (inclusive of fixtures)
Fixing of I/O on surface and termination of UTP CAT 6 cable on I/O as per Industry Standard TSB 568 A/B
Installation charges for LIU
Fiber to Pigtail splicing & testing including manpower etc./ per core
Floor Cutting & Resurfacing- Granite/ marble/Tiles/RCC
Soft Soil digging upto 1.5 Mtrs and resurfacing
Hard Soil digging upto depth 1.5 Mtrs and resurfacing.
VARELI TECNAC PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .