Loading…
Loading…
Tender Value
₹9.5 Cr
EMD Value
₹6.3 L
Closing Date
30 Mar 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
15 conditions · 3 needing a document upload
10.2 - Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, as provided at Page 41 of tender documents, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
10.1 Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Non-submission of the Completion certificate issued by the Competent Authority shall result into summarily rejection of the offer.
Defination of Similar Work :- 3.15 (i) - Any Civil Engineering work
22 conditions · 2 needing a document upload
"The said suppliers of goods and/or services would be subject to GST Act and Rules as applicable from time to time. Tenderers are requested to submit their offers as per GST Tax regime. All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law"
Successful tenderers are required to submit the number of labour to be employed for this particular work. Also the list showing names, along with all other details, of male and female workers employed in this work, should be submitted to office, at the time of submitting performance guarantee and before executing contract agreement. They should also ensure that 1) The payment to the contract labour should be made through bank/cheque. 2) Identity Cards should be issued to all contract workers. 3) Necessary steps should be taken to deduct provident fund from the payment made to contract labour and ensure that the same is credited to their Provident Fund account. 4)Medical facilities from ESI should be ensured, if applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are required to submit a copy of cancelled cheque in order to facilitate the payments regarding refund of EMD etc. in their proper accounts.
In addition to latest provisions of GCC, and all contents of tender documents, all other latest instructions of Railway Boards issued vide various letters received from time to time on concerned matters and related to tender, will also be applicable for the tenders as per necessity and tenderers have to co-operate with Railways and ensure the compliance
I/We agree to carry out all works with use of modern equipments of required capacity for the work without extra payment. The decision of railway engineer shall be final and binding in this regard.
It is the responsibility of contractor to arrange the payment of the labour employed for the work through bank and to deduct PF as per the provisions of Minimum Wages Act.
The quantities shown above are approximate and to give a general guideline. Railway reserves a right to increase, decrease or to delete any of the items mentioned in schedule.
As per ACS 1 to GCC April 2022, issued vide Railway Board's letter dt. 14.07.2022, PVC Clause shall be applicable only in tenders having advertised value above Rs. 2 Crores provided to the provisions as per clause 46A-1. Tenderers should take a note and quote their rates accordingly.
Tenderers are advised to quote their rates including all type of taxes and levies etc. to be paid by them. Any extra payment will not be made on account of taxes/Levies etc., in excess of Contract Agreement Value,
In case of submission of Bid Security in the form of Bank Guarantee, a scanned copy of Original BG valid for a period of 90 days beyond the validity period of tender, and addressed in favour of Sr. DFM/WCR/BPL, shall be uploaded on IREPS portal while applying for tender. And As per ACS 2 to GCC April 2022, circulated vide Railway Board letter dt. 13.12.22, original BG should be delivered in person to the Concerned Official in Office before closing date for submission of bid (i.e. Excluding the last date of submission of bid) without fail. Any failure in this connection shall lead to summary rejection of bid.
Indian Railways Standard General Conditions of Contract, April 2022 (GCC, April 2022) has been introduced and available on website with all correction slips issued up to date for inviting tender and same will be applicable for this tender. Advance Correction Slip No. 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 to Indian Railways Standard General Conditions of Contract, April - 2022 circulated by the Railway Board vide letter No. 2022/CE-I/ CT/GCC-2022/Policy dated 14.07.2022, 13.12.2022, 26.04.2023, 07.08.2023, 20.10.2023 , 21.12.2023, 25.09.2024, 20.12.2024, 09.01.2025 and 04.03.2025 are applicable to this tender. Tenderers are requested to download the same from the railways website and ensure the implementation of the latest provisions made in GCC while execution of work. After that, if any latest correction slip issued by Railway Board on any matter, will also be applicable with immediate effect, though not mentioned in original tender document.
Cess Repair & widening work in Ruthiyai-Maksi Section and Construction of Open Drain along the track in Ruthiyai - Maksi Section At Km 1118/1-1119/4, 1120/11- 1121/1, 1130/6-1131/4, 1142/7-1143/3, 1146/1-1146/8 1149/3-1149/6, 1152/9- 1153/2, 1162/14-1153/5, 1168/03-1168/15, 1175/3-9, 1200/5-17, 1246/90- 1247/300, 1247/100-300, 1216/500-1217/100, 1218/250-500, 1273/600-1274/250, 1278/220-1278/780, 1280/265-1280/575, 1295/0-1295/450, 1301/800-1302/300 under ADEN/M/Shajapur.
WCR-BPL-W-25-26-W-34-168~WCR
WCR-BPL-W-25-26-W-34-168
Open
Works - General
15 Months
Bhopal, Madhya Pradesh
₹0
₹6.3 L
30 Mar 2026
7 Mar 2026
16 Mar 2026
28 items across 3 schedules · ₹9,93,51,229.89 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| in filling in embankment, guide around buried type abutments, bridge refuges, platforms etc. with own earth conforming to Class SQ1/SQ2/SQ3, after preparation as applicable, benching banks wherever required, spreading motor grader, bringing content to OMC, mechanical to specified density a n d dressing to final profile as per RDSO RDSO/2020/GE: IRS-0004 with correction slips. Note: 1) Foundation Benching including additional on account of this, wherever shall be paid extra under relevant item for benching. 2) Payment under this item shall be made the cross section measurements (i) with original ground profile bank based on initial ground levels benching and (ii) final profile worked out with final levels as guidelines. | Soil in in the for of of per | — | — | — | |
| 1 | Class SQ1 | cum | 120000.00 | 345.64 | 4,14,76,800 |
| in cutting in formation, trolley side drains, level crossing platforms, catch water drains, of nallah & finishing to required and slopes to obtain a neat to standard profile inclusive of materials, plant & machinery, leading either to make spoil dumps or embankment with leads within 2 side of edge of the cutting(s) all lifts, ascent, descent, loading, bailing & pumping out water, clearance of site and all other works thereto for completing the work Specification No. RDSO/2020/GE: with latest updated correction slips satisfaction of the Engineer-in- Note: (i) All usable earth arising from shall be led into bank formation spoils shall be dumped / stacked toe of embankment. (ii) All hard boulders not fit for filling will the contractor and will be property Railways. (iii)Cut trees shall be property and to be deposited in the railway unless specified otherwise in of Contract. | all for km if as and be the | — | — | — | |
| 2 | conditions and classifications of | soil cum | 6000.00 | 109.41 | 6,56,460 |
| 3 | not requiring blasting | cum | 1000.00 | 259.67 | 2,59,670 |
| in excavation by mechanical means Excavator)/Manual Means and floors of the bridges, retaining including setting out, dressing ramming of bottom, getting out material, back filling in layers with material and consolidation of ramming and watering etc. including disposal of surplus soil up to a lead types of shoring and strutting with and material complete as technical specification as directed in charge. Note: This item will excavation work in connection with miscellaneous works also like side foundation for OHE masts and other structures in connection with Conversion, Doubling, New lines. | for of the the of per be | — | — | — | |
| 4 | soils | cum | 500.00 | 212.37 | 1,06,185 |
| 5 | item 113010 for earth-work on other side of the track (when available along track or no road to work at site) by dumping own earth, collected along toe height on to other side of track of the existing bank by head load, of tracks with all contractor's labour, tools, plant including loading baskets, lifting, leading to the non- of bank including crossing of tracks etc. and as directed by in-charge. | for cum of & the | 1000.00 | 46.16 | 46,160 |
| machinery for minor miscellaneous for short duration including fuel, lubricants and The contractor shall arrange permits as required by rules and prevailing in the area of work. shall be made for actual working site. | all | — | — | — | |
| 6 | Loaders 3DX Plus or similar with 1.10 cum bucket capacity | Hour | 150.00 | 830.66 | 1,24,599 |
| 7 | similar tyre mounted Pick-n-Carry 12T capacity for misc. works material | Hour of | 50.00 | 1,123.37 | 56,168.5 |
| Schedule total | ₹4,27,26,042.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .