Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.4 LAdmitted-Finance | -7.99% | ₹18.4 L | L1 | Admitted-Finance |
| 2 | L2₹18.6 L+₹19,781.84 (1.08%)Admitted-Finance | -7.00% | ₹18.6 L+₹19,781.84 (1.08%) | L2 | Admitted-Finance |
| 3 | L3₹18.9 L+₹49,554.51 (2.70%)Admitted-Finance | -5.51% | ₹18.9 L+₹49,554.51 (2.70%) | L3 | Admitted-Finance |
| 4 | L4₹19.2 L+₹84,322.60 (4.59%)Admitted-Finance | -3.77% | ₹19.2 L+₹84,322.60 (4.59%) | L4 | Admitted-Finance |
| 5 | L5₹19.5 L+₹1.1 L (6.24%)Admitted-Finance | -2.25% | ₹19.5 L+₹1.1 L (6.24%) | L5 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
20 Jul 2026, 6:00 pmClosed
EE PWD DIV SULTANPUR
EE PWD DIV SULTANPUR
Construction of Drain at Marwada choki village near SH-70, Km. 0.200 Km. SH
2026_CEPWD_573544_1
EE PWD DIV SULTANPUR NITNO-17/2026-27
Open Tender
Civil Works
Percentage
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV SULTANPUR
₹40,000
Yes
24 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
20 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 457.92 | Cum | - | - |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | 76.32 | Cum | - | - |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C grade M 20 | 203.52 | Cum | - | - |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and MoRTH specifications Clauses 1009,1600 and 2102 | 10.38 | MT | - | - |
| 16 | Add GST (18%) on Total Construction Cost | 1 | Total | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
Tendernotice_2.pdf
PDF • 0.48 MB
Tendernotice_3.pdf
PDF • 1.39 MB
Tendernotice_4.pdf
PDF • 11.56 MB
BOQ_1020249.xls
BOQ • 0.26 MB
DATE-CORRIGENDUM02.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .