Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.0 L+₹36,468.82 (3.43%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.1 L+₹47,164.85 (4.44%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹11.8 L+₹1.1 L (10.6%)Rejected-Finance PUTHUSSERIPADY HOUSE KALYANAPATTA KANNIMARI P O 678103 | KANNIMARI | PALAKKAD | KERALA | 678103 | L4 | Rejected-Finance L4 | |
| 5 | L5₹13.1 L+₹2.5 L (23.6%)Rejected-Finance K K PATHY POST 678101 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | JAYAKRISHNAN.M V L1 | manoj.k L2 | TOMEY RAPHAEL L4 | SURESH M L3 | GREENHAVEN CONSTRUCTIONS and PROJECTPVT LTD L6 | Mani PWD Contractor L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00cada work | |||||||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 28.46 | cum | 1,024.32 ₹29,156.24 Lowest | 1,061.67 ₹30,219.37 | 1,134.73 ₹32,298.95 | 1,058.38 ₹30,125.73 | 1,290.18 ₹36,723.68 | 1,268.41 ₹36,104.02 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 42 | cum | 170.04 ₹7,141.68 Lowest | 177.58 ₹7,458.36 | 188.07 ₹7,898.94 | 177.64 ₹7,460.88 | 213.83 ₹8,980.86 | 210.23 ₹8,829.66 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 55.12 | cum | 5,235.71 ₹2,88,618.51 Lowest | 5,418 ₹2,98,667.25 | 5,791.01 ₹3,19,229.43 | 5,469.73 ₹3,01,518.87 | 6,584.3 ₹3,62,959.54 | 6,473.24 ₹3,56,837.36 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 709.19 | sqm | 254.87 ₹1,80,750.75 Lowest | 263 ₹1,86,516.44 | 281.9 ₹1,99,920.1 | 266.26 ₹1,88,828.4 | 320.51 ₹2,27,301.85 | 315.11 ₹2,23,472.23 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 70 | cum | 5,655.63 ₹3,95,894.1 Lowest | 5,852 ₹4,09,640 | 6,255.47 ₹4,37,882.9 | 5,908.42 ₹4,13,589.4 | 7,112.39 ₹4,97,867.3 | 6,992.42 ₹4,89,469.4 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.38 | cum | 6,095.74 ₹69,339.04 Lowest | 6,308 ₹71,753.5 | 6,742.26 ₹76,693.21 | 6,368.2 ₹72,438.28 | 7,665.86 ₹87,199.16 | 7,536.55 ₹85,728.26 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.48 | cum | 6,922.59 ₹3,309 Lowest | 7,163 ₹3,423.91 | 7,656.8 ₹3,659.95 | 7,232.01 ₹3,456.9 | 8,705.68 ₹4,161.32 | 8,558.84 ₹4,091.13 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 104.9 | kilogram | 74.2 ₹7,783.51 Lowest | 76 ₹7,972.32 | 82.07 ₹8,609.06 | 77.52 ₹8,131.77 | 93.32 ₹9,789.17 | 91.74 ₹9,623.43 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 385 | sqm | 209.42 ₹80,626.7 Lowest | 216.72 ₹83,437.2 | 231.64 ₹89,181.4 | 218.79 ₹84,234.15 | 263.37 ₹1,01,397.45 | 258.92 ₹99,684.2 |
Tender Value
₹16.1 L
EMD Value
₹40,252
Closing Date
14 Aug 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Irrigation Division Chittur
Clearing GrassDemolishing CC Earth WorkExacavation CC 1_4_8 CC 1_3_6CC 1_2 _4 CC 1_1 5_3 Centering and shutteringPlatering etc
2025_Irrig_781812_1
IRR/PI/TR/3169/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
360 days
Chittur
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹40,252
Yes
14 Oct 2025
2 Aug 2025
18 Aug 2025
3 Aug 2025
14 Aug 2025
3 Aug 2025
3 Aug 2025 - 8 Aug 2025
Amount
cada work
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
manoj.k (BID ID -2284998)
SURESH M (BID ID -2286013)
TOMEY RAPHAEL (BID ID -2285272)
Mani PWD Contractor (BID ID -2288201)
GREENHAVEN CONSTRUCTIONS and PROJECTPVT LTD (BID ID -2287475)
Bidder Name
TOMEY RAPHAEL
Mani PWD Contractor
manoj.k
JAYAKRISHNAN.M V
SURESH M
GREENHAVEN CONSTRUCTIONS and PROJECTPVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1282283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .