Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.2 LAccepted-AOC | 1 | Accepted-AOC CS | |
| 2 | 2₹21.1 L+₹4.9 L (30.1%)Rejected-Finance | 2 | Rejected-Finance second lowest |
Tender Value
Refer Docs
EMD Value
₹25,800
Closing Date
26 Oct 2019, 4:00 pmClosed
Executive Engineer (Electrical)
Office of the Executive Engineer Electrical Division Travancore Devaswom Board Chengannur 689121
SDP-Pamba-MnM Festivals 1195 ME-Providing temporary light arrangements using diesel generator set on hire basis on Swami Ayyappan road as stand by system
2019_TDB_310827_1
TDB/EEE/ET-12/19-20
Open Tender
Electrical Works
Item Rate
69 days
Chengannur
Refer NIT
3 documents required · 3 mandatory
₹2,800
online
₹25,800
7 Nov 2020
19 Oct 2019
29 Oct 2019
19 Oct 2019
26 Oct 2019
19 Oct 2019
Amount
Hire and Labour charges providing 62.5 KVA .Diesel Generator set complete including conveyance postig of duty staff for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Running charges for 62.5 KVA D.G set including supply of fuels,labour charges for temporary light from 16-11-2019 to 19-01-2020 ie 64 days (6PM to 6AM)
Hire and Labour charges for 50sq.mm*4 core PVC aluminium U.G cableand giving connection for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges and providing a main board with 200A TPN SFV with 200A TPN busbar chamber as incomer and 6 no of 63A TPN SFV as out going and giving connection for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges and providing 3 phase 6 way HRC .DB with 63 A TPN SF .HRC and giving connection for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges and providing temporary pipe earthing as per 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges providing 2 run 3/20 PVC insulated copper wire through the existing pipe and giving connection as required for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges providing 2 run 7/20 PVC insulated copper wire through the existing pipe and giving connection as required for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges providing 2 * 7/16SWG PVC insulated copper clipped with 12 SWG GI wire and giving as connection required for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
Hire and Labour charges providing 400W metal halide lamp set (50 nos/day) for the 1st day, ie as on 16-11-2019
Do..do..do..do.. For adiitional 64 days ie from 17-11-2019 to 19-01-2020.
P SREEKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .