| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.2 Cr+₹33.9 L (17.5%)Accepted-AOC | ₹2.2 Cr+₹33.9 L (17.5%) Quoted ₹2.3 Cr | L2 | Accepted-AOC decided to accept the bid as lowest responsive bid. |
| 2 | L1₹1.9 CrRejected-AOC | ₹1.9 Cr | L1 | Rejected-AOC Bidder did not accept LOA. |
| 3 | L3₹2.4 Cr+₹41.3 L (21.3%)Rejected-AOC | ₹2.4 Cr+₹41.3 L (21.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.8 Cr+₹81.4 L (42.0%)Rejected-AOC | ₹2.8 Cr+₹81.4 L (42.0%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Metro Medi Systems L2 | Blaze Systems and Services L3 | GMB BIO MED L4 | Hitech Med Gas Solutions L1 |
|---|---|---|---|---|---|---|---|
| 1.00MANIFOLD AND PLANT ROOM - OXYGEN SYSTEM | |||||||
| 1.01 | Supply, installation testing and commissioning of Automatic Oxygen Control Panel with minimum flow rate of 2000 LPM with liquid oxygen connectivity, suitable for 2x16 manifold system Fully complying with ISO 10524-2, ISO 7396-1:2007/HTM02-01 as per technical specifications. The cylinders shall not be included in the quoted price. | 1 | Nos | 2,10,000 ₹2,10,000 | 1,65,200 ₹1,65,200 | 1,32,160 ₹1,32,160 Lowest | 2,75,044 ₹2,75,044 |
| 1.02 | Supply,testing and commissioning of Oxygen Manifold - 2 banks x16 cylinders, as per technical specifications. The cylinders shall not be included in the quoted price. | 1 | Nos | 1,60,000 ₹1,60,000 | 1,53,400 ₹1,53,400 | 1,32,160 ₹1,32,160 | 95,760 ₹95,760 Lowest |
| 1.03 | Supply,testing and commissioning of Cylinder Emergency Oxygen Manifold with high flow regulator- 1 Bank X5 Cylinders | 1 | Nos | 41,300 ₹41,300 | 41,300 ₹41,300 | 33,040 ₹33,040 | 29,260 ₹29,260 Lowest |
| 2.00Nitrous oxide system | |||||||
| 2.01 | NITROUS OXIDE SYSTEM: Supply,testing and commissioning of automatic N2O control panel complete set with inlet and outlet connectors suitable for 2x3 manifold system with minimum flow rate of 600 LPM, fully automatic control panel for both sides with brass hosing and suitable connectors.BSP (M) thread. | 1 | Nos | 1,10,000 ₹1,10,000 Lowest | 1,29,800 ₹1,29,800 | 1,23,900 ₹1,23,900 | 1,12,385 ₹1,12,385 |
| 2.02 | Supply,testing and commissioning of Cylinder Manifold Nitrous oxide - 2 bank x 3cylinders as per technical specifications. | 1 | Nos | 35,400 ₹35,400 | 35,400 ₹35,400 | 24,780 ₹24,780 | 17,955 ₹17,955 Lowest |
| 2.03 | Supply,testing and commissioning of Nitrous Oxide Emergency Manifold - 1 banks x 2 cylinders with hogh flow Regulator.as per technical specifications. The cylinders shall not be included in the quoted price. | 1 | Nos | 23,600 ₹23,600 | 23,600 ₹23,600 | 21,476 ₹21,476 | 13,965 ₹13,965 Lowest |
| 3.00CARBON DIOXIDE SYSTEM | |||||||
| 3.01 | Supply,testing and commissioning of Cylinder Emergency CO2 Manifold - 2 bank x 1 cylinder with a high flow regulator with gauges and safety valves complete with all accessories etc. as required complete as per specification | 1 | Nos | 23,600 ₹23,600 | 23,600 ₹23,600 | 24,780 ₹24,780 | 7,315 ₹7,315 Lowest |
Tender Value
₹2.2 Cr
EMD Value
₹1 L
Closing Date
7 Jan 2026, 4:00 pmClosed
Head- Consultancy Wing
Consultancy Wing, KSEBL, Vydyuthi Bhavanam, Pattom, Thiruvananthapuram
Supply, Installation, Testing and Commissioning of Medical Gas Piping System (MGPS) for Taluk Hospital Karunagappally, Kollam
2025_KSEB_820413_1
CW/KSEBL/08/2025-26
Open Tender
Electrical Works
Item Rate
120 days
Taluk Hospital Karunagappally
As per Bid
4 documents required · 4 mandatory
₹8,850
₹1 L
Thiruvananthapuram
15 Jun 2026
20 Dec 2025
9 Jan 2026
20 Dec 2025
7 Jan 2026
21 Dec 2025
30 Dec 2025
MANIFOLD AND PLANT ROOM - OXYGEN SYSTEM
Supply, installation testing and commissioning of Automatic Oxygen Control Panel with minimum flow rate of 2000 LPM with liquid oxygen connectivity, suitable for 2x16 manifold system Fully complying with ISO 10524-2, ISO 7396-1:2007/HTM02-01 as per technical specifications. The cylinders shall not be included in the quoted price.
Supply,testing and commissioning of Oxygen Manifold - 2 banks x16 cylinders, as per technical specifications. The cylinders shall not be included in the quoted price.
Supply,testing and commissioning of Cylinder Emergency Oxygen Manifold with high flow regulator- 1 Bank X5 Cylinders
Nitrous oxide system
NITROUS OXIDE SYSTEM: Supply,testing and commissioning of automatic N2O control panel complete set with inlet and outlet connectors suitable for 2x3 manifold system with minimum flow rate of 600 LPM, fully automatic control panel for both sides with brass hosing and suitable connectors.BSP (M) thread.
Supply,testing and commissioning of Cylinder Manifold Nitrous oxide - 2 bank x 3cylinders as per technical specifications.
Supply,testing and commissioning of Nitrous Oxide Emergency Manifold - 1 banks x 2 cylinders with hogh flow Regulator.as per technical specifications. The cylinders shall not be included in the quoted price.
CARBON DIOXIDE SYSTEM
Supply,testing and commissioning of Cylinder Emergency CO2 Manifold - 2 bank x 1 cylinder with a high flow regulator with gauges and safety valves complete with all accessories etc. as required complete as per specification
CARBON DIOXIDE SYSTEM: Supply,testing and commissioning of semi automatic CO2 control panel complete set with inlet and outlet connectors for automatic for both sides with brass housing and suitable connectors. BSP (M) thread.
MEDICAL AIR SYSTEM
MEDICAL AIR SYSTEM: Supply,testing and commissioning of Compressed air plant complete with - 2 compressors, each compressor should have minimum free air delivery of 2000 LPM @10bars, 1 air receiver tank of minimum 2000 ltr capacity, filtration and dryer system to ensure medical air quality as per HTM standards (each compressor module should include an inline filter with particle retention of 10 microns), NRV, pressure reducing station,automatic drain valves,pressure guages,ball valves, electrical control panel including circuit breakers, starters, pressure switches, timers, as per technical specifications
VACCUM PLANT
Supply, Installation, testing and commissioning of Rotary Vane type Oil-lubricated Duplex Medical Vacuum Plant (Package Unit) having a capacity of 3000 LPM including 2 Nos Vacuum pump, air receiver tank with 3000 litre, filters, dryers, valves, NRV, pressure gauge, pressure switch, Electrical control panel, starters, timer, circuit breaker all accessories as per HTM 02-01/NFPA 99C standards.
DISTRIBUTION PANEL
Supply, Installation, testing and commissioning of 3 phase ,6 way TPN MCCB DB consisting of 100 Amp 4P MCCB as incomer, outgoing of 6 nos 40/32 TP D curve MCB, cable termination box etc. complete.
PIPE LINE SYSTEM
Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards.All copper pipes should be degreased and delivered at both ends of required sizes and as per technical specifications. 12mm x 1 mm thick Copper pipe
Supply, installation testing and commissioning of Copper pipe: as per standard BS:EN13348:2008 /astm B819 standards, solid drawn, seamless, deoxidized, non-arsenical, half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards .All copper pipes should be degreased and delivered at both ends of required sizes and as per technical specification -15mm x 0.9mm thick copper pipe
Supply, installation testing and commissioning of Copper pipe: as per standard BS:EN13348:2008 /astm B819 standards, solid drawn, seamless, deoxidized, non-arsenical, half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards. All copper pipes should be degreased and delivered at both ends of required sizes and as per technical specifications.22 mm x0.9 mm thick Copper pipe
Supply, installation testing and commissioning of Copper pipe: as per standard BS:EN13348:2008 /astm B819 standards, solid drawn, seamless, deoxidized, non-arsenical, half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards. All copper pipes should be degreased and delivered at both ends of required sizes and as per technical specifications.28 mm x 0.9 mm thick Copper pipe
Supply,installation testing and commissioning of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn, seamless, deoxidized, non-arsenical, half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards.All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specifications. 35mm x 1.2 mm thick Copper pipe
Supply of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standardwith all fiiings supporting materials bracing, pressure testing etc as per standards. All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specification 42 mm x 1.2 mm thick copper pipe
Supply of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standard with all fiiings supporting materials bracing, pressure testing etc as per standards. All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specification 54 mm x 1.2 mm thick copper pipe
Supply of Copper pipe: as per stanard BS:EN13348:2008 /astm B819 standards,solid drawn,seamless,deoxidized,non-arsenical,half hard tempered and degreased copper pipe conforming to the standard with all fiiings supporting materials bracing, pressure testing etc as per standards. All copper pipes should be degreased and delivered at both ends of recquired sizes and as per technical specification 72mm x 1.2 mm thick copper pipe
GAS OUTLETS
Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications. Venturi type AGSS outlets conforming to EN ISO 9170-2
Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications. O2 Outlets with Probes
Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications. Vac Outlets with Probes
Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications. Air (7 bar) Outlets with Probes
Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications-Air (4 bar) Outlets with Probes
Supply, Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications. N2O Outlets with Probes
Supply,Installation , testing and commissioning of Gas Outlets meeting requirements of EN ISO 9170-1/ HTM 02-01/DIN as per technical specifications.CO2 Outlets with Probes
Master Alarm panel
Supply,testing and commissioning of Master Plant Alarm Panel,Complies with HTM 02-01/ISO 7396-1 Standards. Each Master Alarm should be modular in design and be fitted with required number of master alarm modules. The master alarms should be capable to monitor minimum 25 point. Each point represents an alarm condition that the source equipment might have. When an alarm condition exists, a red-light flashes and the audible alarm sounds. If several alarm conditions occur simultaneously, the most recent alarm light should flash, while the other alarm lights should remain lit. When an alarm condition is created, an audible alarm should be actuated. A dry contact module should be available to interface with a building management system. The box material should be of gauge steel of requisite thickness and equipped with mounting brackets. The emissions from alarms should conform with EMC standards. Master alarm management system should be designed to display alarm conditions from the source supply units indicating the broad status of the source equipment and manifolds as well as the master distribution status from the source supplies. Depending on the alarm priority, a visual and audible alarm should be initiated to indicate an alarm condition. Each panel shall display and/or input of multi point alarms,including all necessary cabling between mater alarm and floor panels. The master alarm must be able to monitor the following source alarm conditions. as per technical specifications.Master Plant Alarm Panel ,Complies with HTM 02-01/ISO
Area valve And Alarm unit
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the NFPA 99/HTM 02-01/ISO 7396-1 requirements and should be European CE Certified or UL listed. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications. 6gas
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the NFPA 99/HTM 02-01/ISO 7396-1 requirements and should be European CE Certified or UL listed. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications. 5gas-
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the NFPA 99/HTM 02-01/ISO 7396-1 requirements and should be European CE Certified or UL listed. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications. 4gas -
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the NFPA 99/HTM 02-01/ISO 7396-1 requirements and should be European CE Certified or UL listed. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications. 3 gas -
Supply,Installation,testing and commissioning of Area Valve Service + Alarm Units, fully complying, by means of pressure sensors which detect deviations from the normal operating limits of either pressure or medical vacuum. The area alarm should have a digital/analogue display of pressures. The medical gas area alarm should fully satisfy the NFPA 99/HTM 02-01/ISO 7396-1 requirements and should be European CE Certified or UL listed. An audible warning should sound simultaneously with any failure indication and a mute facility should be provided as per technical Specifications. 2 gas -
BALL VALVES
Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-54mm
Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-42mm
Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-35mm
Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications 28mm
Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-22mm
Supply,installation, testing and commissioning of Ball Valves, complying with HTM 02-01/DIN, as per technical Specifications-15 mm
OXYGEN GAS CYLINDER
Supply,testing and commissioning of D type CO2 Gas filled Cylinder having as per technical specification.D type CO2 Gas filled Cylinder
Supply,testing and commissioning of D type Nitrous Oxide Gas filled Cylinder as per technical specification.D type Nitrous Oxide Gas filled Cylinder
Supply, testing and commissioning of class D type Oxygen Gas filled Cylinder etc in complete as per technical specification.
BED HEAD PANELS
Supply and installation of Bed Head 5ft (Horizontal) unit made out of High strength extruded Aluminum Panel of minimum 2.5 mm thickness with powder coated to make it aesthetically appealing and long lasting, the panel should be divided into different sections to segregate power, data and medical gas<br> chamber suitable for accommodating following utilities - Oxygen, Vacuum, Medical Air, Nurse call switch ; 1, spare probe, 2 no 5 /15A combined socket with switch outlet 2 set, provision RJ-45 socket/ Ethernet, shall have monitor holder and equipped with two side rail system to hold different associated <br>accessories like vaccine basket, Holder for vacuum collection jar, examination lamp, IV pole, etc. and all necessary mechanical supports for complete installation as instructed and directed by engineer in charge. Bed head panel as above with 5 Gas outlet
Supply and installation of Bed Head 5ft(Horizontal) unit made out of High sbength extruded Aluminum Panel of minimum 2.5 mm thickness with powder coated to make it aesthetically appealing and long lasting, the panel should be divided into different sections to segregate power, data and medical gas chamber suitable for accommodating following utilities - Oxygen, Vacuum, Medical Air, Nurse call switch1, spare probe, 2 no 5 /15A combined socket with switch outlet — 2 set, provision RJ-45 socket/ Ethernet, shall have monitor holder and equipped with two side rail system to hold different associated accessories like vaccine basket, Holder for vacuum collection jar, examination lamp, IV pole, etc. and all necessary mechanical supports for complete installation as instructed and directed by engineer incharge. Bed head panel as above with 2 Gas outlet
BPC Flow meters,Gas Outlets
Supply, Installation, testing and commissioning of High Pressure Antistatic Hose with color coded.
Supply Installation of Theatre Vacuum unit with trolly and 2000 ml collection jar as per technical specification.
Supply Installation of Ward vacuum unit with 600 ml collection jar as per technical specification.
Supply Installation of BPC Oxygen Flow meter as per technical specification.
DISMANTLING
Dismantling of the existing portable oxygen generating plant consisting of Oxygen generator and compressed air including including Filters, Control panels, filters, storage tank and associated accessories and reinstallation of the above units and equipment in the newly constructing MGPS room( located near to the existing plant) in all aspects without damage(all associated civil works excluded)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Volume1.pdf
Tender Documents • 2.65 MB
Volume2TechnicalSpecificationsMGPS.pdf
Tender Documents • 1.02 MB
Volume3DrawingsMGPS.pdf
Tender Documents • 10.60 MB
BOQ_1379653.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .