Loading…
Loading…
Tender Value
₹22.2 L
EMD Value
₹23,000
Closing Date
22 Jul 2026, 6:00 pm
OFFICE OF THE EXECUTIVE ENGINEER, AMRELI IRRIGATION DIVISION,AMRELI
Construction of Manavav Checkdam On Local River Near Village:Manavav Ta.Dhari Dist.Amreli.
321813
1 of 2026-27
Open
AMC/Maintenance Contracts
Amreli
8 documents required · 7 mandatory · 1 optional
₹900
Executive Engineer, Amreli Irrigation Division,Amreli
₹23,000
7 Jul 2026
7 Jul 2026
7 Jul 2026
22 Jul 2026
7 Jul 2026
BILL OF QUANTITIES
Amreli Irrigation Division, Amreli
Name of work:- the Construction Of Manavav Checkdam On River Near Village:Manavav Ta.Dhari
(A) Percentage Rate Tender (Upto INR 50 Cr.)
Bill of Quantity
Quantity Unit Items of work Rate Amount
Excavation in all sort of strata and formations
incl. depositing the unuseful excavated stuff as
and where directed incl sorting and stacking
useful materials as directed upto 200 mt lead and
all lift etc. complete incl. dewatering.
196.79 Cum (A) IN OVERBURDEN INCL. HARD MURRUM 79.00
393.64 Cum (B) IN SOFT ROCK 176.00
20.60 Cum Prov. & Laying in position cement concrete
using cement, sand and crushed metal coarse
aggregate by mass and machine mix for PCC/RCC
including necessary formworks compaction by
vibrator,curing as directed with all lead & lift etc
complete. (Excluding cost of steel ) FOR. BODY
WALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC.
4/F) "NOMINAL MIX" Conc. grade 1:2:4 and MSA-
428.50 Cum Prov. & Laying in position cement concrete
using cement, sand and crushed metal coarse
aggregate by mass and machine mix for PCC/RCC
including necessary formworks compaction by
vibrator,curing as directed with all lead & lift etc
complete. (Excluding cost of steel ) FOR. BODY
WALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC.
4/C) Controlled Concrete grade M-15 and MSA-
Providing,cutting,bending,binding and fixing in
position as per drawing TMT BAR, reinforcement
for R.C.C. works and anchor bars incl cost of
black annealed 16 to 18 BWG M.S. Wire etc.
complete with all lead and lift.
Earthwork / Back filling with selected earth brought
from out side borrow area or from excavated useful
material incl. watering ramming, Compaction with
pneumatic temping and all lead and lift etc
18.00 Rmt. Providing and fixing in position 100/110 mm dia
PVC Pipe weep holes in the retaining
walls/sidewall/ abt etc
24.00 Cum Providing and laying graded filters of
and,gravel/metal andover size metal ( 100 to
mm) behind the retaining wall & wing walls as
directed as per approved drawing with all lead and
lifts etc complete. 530.00
41.30 Sqmt Providing and laying dry rubble pitching with 20 cms
gravel/metal and 20 cms sand layers as base of
inverted graded filter and without header stone but
incl.hand packing trimming & dressing of slopes etc
A) 30 cms thick stone pitching 253.00
Providing and laying STONE LOANCHING APRON
by using 50% stone which having weighing not less
108.00 Cum than 40 Kg or as specified incl hand packing and
filling the interstices by spouls etc complete with all
Providing and fixing in position white marble
1.00 No plate of size 45x45x1.8 cm incl ingraving the
letters as per drawing/as directed etc complete. 1350.00
Providing Photography and Videography of Entire
I/We am/are willing to carry out the work at…..............%above/below percent (Should be
written in figures and words)of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender(ForaboveINR50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount(If any)%(in figure)………………………………
(C)Net Tendered Amount(A-B)(in figure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deductedasperprevailingrulesi.e.1%ofthework done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Construction of Manavav Checkdam.pdf
BOQ Construction Of Manavav Checkdam.pdf
Tender Notice No.01 of 2026-27.pdf
Download all tender documents and submit your bid