Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | ₹10.8 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹12.7 LRejected-Finance | ₹12.7 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹14.6 LRejected-Finance | ₹14.6 L | L3 | Rejected-Finance Npt Lowest |
| 4 | L4₹15.3 LRejected-Finance KARUR | ₹15.3 L | L4 | Rejected-Finance not Lowest |
| 5 | L5₹15.9 LRejected-Finance | ₹15.9 L | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | kanagaraj L2 | KUMARAN KUDIL CONSTRUCTIONS L3 | Bharathi Construction L1 | Sri Navaladiyar And Co L4 | TR CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00BOQ | ||||||||
| 1.01 | THOROUGHLY PICKING THE EXISTING BT, WBM ROAD LEVELLING, COMPACTION BY POWER ROLLER. RATE INCLUDES LABOUR CHARGES, MACHINERY HIRE CHARES AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE. | 325 | SQM | 40 ₹13,000 Lowest | 63 ₹20,475 | 50 ₹16,250 | 40 ₹13,000 Lowest | 45 ₹14,625 |
| 1.02 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 130 | CUM | 225 ₹29,250 | 225 ₹29,250 | 150 ₹19,500 Lowest | 270 ₹35,100 | 275 ₹35,750 |
| 1.03 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | 130 | CUM | 225 ₹29,250 | 225 ₹29,250 | 150 ₹19,500 Lowest | 270 ₹35,100 | 275 ₹35,750 |
| 1.04 | PROVIDING AND LAYING OF "WET MIX" MACADAM BASE COURSE OF 100 MM THICK COMPACTED THICKNESS WITH STONE AGGREGATE AND GRANULAR POWDER OF QUALITY SIZE WITH MORTAR AND COMPACTION WITH VIBRATING ROLLER OF 80 TO 100 KN STATIC WEIGHT WITH SLOPE, GRADIENT AND SAFETY AS PER INSTRUCTION OF ENGINEER INCHARGE. | 75 | CUM | 2,200 ₹1,65,000 Lowest | 2,430 ₹1,82,250 | 2,800 ₹2,10,000 | 2,700 ₹2,02,500 | 2,800 ₹2,10,000 |
| 1.05 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR FLOORING EXCLUDING SHUTTERING BUT INCLUDING LEVELLING THE TOP SURFACE USING POWER TROWEL, CURING, ETC., COMPLETE BELOW GROUND LEVEL AND UPTO FFL. | 150 | CUM | 4,600 ₹6,90,000 Lowest | 5,400 ₹8,10,000 | 4,700 ₹7,05,000 | 5,500 ₹8,25,000 | 5,600 ₹8,40,000 |
| 1.06 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING FOR ALL TYPES OF SHUTTERING WORKS LIKE FOOTING, RAFT, PLINTH BEAM, ETC., AS "PLASTER FREE FINISH" BELOW GROUND LEVEL AND UPTO FFL. | 40 | SQM | 650 ₹26,000 | 900 ₹36,000 | 600 ₹24,000 Lowest | 900 ₹36,000 | 1,000 ₹40,000 |
| 1.07 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 2 | MT | 15,000 ₹30,000 | 15,300 ₹30,600 | 12,000 ₹24,000 Lowest | 18,000 ₹36,000 | 18,500 ₹37,000 |
| 1.08 | PREPARE THE CONCRETE SURFACE AND MAKING GROOVE CUTTING OF SIZE 5 X 20MM DEEP WITH REQUIRED TOOLS AND TACKLES AND FILLING WITH POLYMER BASED BITUMEN OF APPROVED MAKE AS PER THE INSTRUCTIONS OF ENGINEER IN CHARGE | 80 | RMR | 160 ₹12,800 | 270 ₹21,600 | 35 ₹2,800 Lowest | 120 ₹9,600 | 125 ₹10,000 |
| 1.09 | DISMANTLING OF RCC M20/M25 CONCRETE WITH BREAKERS AND CUTTING OF THE STEEL REINFORCEMENTS, ETC., AND DISPOSE OFF THE DEBRIS TO A LEAD OF 2 KM APART AS DIRECTED. | 60 | CUM | 4,000 ₹2,40,000 | 4,500 ₹2,70,000 | 350 ₹21,000 Lowest | 5,000 ₹3,00,000 | 5,500 ₹3,30,000 |
Tender Value
Refer Docs
Closing Date
15 Jun 2026, 3:00 pmClosed
Chief General Manager (Projects and Energy)
PMD Office, TNPL Unit I, Kagithapuram.
Providing concrete road (size - 90.0x7.0mtr) for damaged concrete and BT road in North side of TNPL LSFM Cement Plant
2026_TNPL_679805_1
TNPL/PMD/CIV/CEM/262733000100
Open Tender
Civil Works
Tender cum Auction
60 days
TNPL LSFM Cement Plant, Kagithapuram, Karur Dt.
As per Invitation for Bids of Bid Document
4 documents required · 4 mandatory
₹0
Exempted
17 Jul 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | THOROUGHLY PICKING THE EXISTING BT, WBM ROAD LEVELLING, COMPACTION BY POWER ROLLER. RATE INCLUDES LABOUR CHARGES, MACHINERY HIRE CHARES AND ALL OTHER INCIDENTAL CHARGES ETC., COMPLETE. | 325 | SQM | - | - |
| 1.02 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 130 | CUM | - | - |
| 1.03 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | 130 | CUM | - | - |
| 1.04 | PROVIDING AND LAYING OF "WET MIX" MACADAM BASE COURSE OF 100 MM THICK COMPACTED THICKNESS WITH STONE AGGREGATE AND GRANULAR POWDER OF QUALITY SIZE WITH MORTAR AND COMPACTION WITH VIBRATING ROLLER OF 80 TO 100 KN STATIC WEIGHT WITH SLOPE, GRADIENT AND SAFETY AS PER INSTRUCTION OF ENGINEER INCHARGE. | 75 | CUM | - | - |
| 1.05 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR FLOORING EXCLUDING SHUTTERING BUT INCLUDING LEVELLING THE TOP SURFACE USING POWER TROWEL, CURING, ETC., COMPLETE BELOW GROUND LEVEL AND UPTO FFL. | 150 | CUM | - | - |
| 1.06 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING FOR ALL TYPES OF SHUTTERING WORKS LIKE FOOTING, RAFT, PLINTH BEAM, ETC., AS "PLASTER FREE FINISH" BELOW GROUND LEVEL AND UPTO FFL. | 40 | SQM | - | - |
| 1.07 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 2 | MT | - | - |
| 1.08 | PREPARE THE CONCRETE SURFACE AND MAKING GROOVE CUTTING OF SIZE 5 X 20MM DEEP WITH REQUIRED TOOLS AND TACKLES AND FILLING WITH POLYMER BASED BITUMEN OF APPROVED MAKE AS PER THE INSTRUCTIONS OF ENGINEER IN CHARGE | 80 | RMR | - | - |
| 1.09 | DISMANTLING OF RCC M20/M25 CONCRETE WITH BREAKERS AND CUTTING OF THE STEEL REINFORCEMENTS, ETC., AND DISPOSE OFF THE DEBRIS TO A LEAD OF 2 KM APART AS DIRECTED. | 60 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BidDocument_262733000100.pdf
Tender Documents • 2.33 MB
BOQ_816785.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].