Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Apr 2021, 6:55 pmClosed
Executive Engineer Mech. irrigation Div. Baramulla
Mech. irrigation Div. Baramulla
Repairs to 05 cusec pump at LIS Lassipora of MISD Handwara.
2021_IFC_121341_11
eNIT-49 of 2020-21
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Handwara
Please refer Tender documents.
6 documents required · 6 mandatory
₹100
Yes
Executive Engineer Mech. irrigation Div. Baramulla
Exempted
Mech. irrigation Div. Baramulla
6 Apr 2021
27 Mar 2021
3 Apr 2021
27 Mar 2021
2 Apr 2021
27 Mar 2021
30 Mar 2021
Amount
Repairing of the 05 cusec Horizontal pump at LIS Lassipora by way of • Dismantling of pumping unit at site, shifting of housing to the road side by engaging labours loading on private vehicle shifting to workshop. • Complete dismantling of pump housing at workshop, cleaning of its parts with K-oil for thorough inspection and extraction of damaged parts by engaging skilled manpower. • Repairs to the SS impeller shaft at excessively worn out places by way of welding, turning, finishing and balancing on lathe machine by engaging a skilled operator. Job further includes manufacturing, P/F of MS check-nut as per sample. • P/F of ball bearings No.6312& No.6310 along with proper & adequate lubrication. • P/F of palmative gland packing & assorted size nuts and bolts. • Manufacturing, providing and fitting of M.S bearing cup as per sample. • Providing and fitting of TC-16 rubber tyre coupling by way of extraction of damaged coupling from the pumping unit , boring of the coupling halves of the TC-16 coupling on lathe as per the size of driver and driven ends. The coupling shall be provided with coupling bolts and rubber. • Assembling of pump housing at workshop by engaging skilled manpower after carrying out necessary repairs/ replacements and then shifting it back to site in a privately owned load carrier, re-assemble it with other allied accessories and testing on full load. Job includes all charges for handling, loading/ unloading, head loads, carriage etc. and all tools & tackles required for proper execution of work shall be provided by the firm • Job includes cast iron welding to pump casing by way of using superior electrode. After repairs successful testing on full load is to be carried out by the firm
M/s BUHROO MECHANICAL WORKS
M/s SAJID ENGINEERING WORKS
Mir Fab Industries
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .