| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹68.8 L+₹6.0 L (9.53%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Solvency Back Dated, not as per SQC | |
| 4 | Rejected-Technical KOYADAN CHOYIKUNIMAL MULLAKODI PO MAYYIL KANNUR PIN 670602 | MAYYIL | KANNUR | KERALA | 670602 | - | Rejected-Technical Solvency Back Dated, not as per SQC |
| Sl No | Description | Qty | Unit | SREEKUMAR K S L2 | RAJEEV P I L1 |
|---|---|---|---|---|---|
| 1.00Fencing work | |||||
| 1.01 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 228.99 | cum | 319.63 ₹73,193.72 | 313.77 ₹71,851.45 Lowest |
| 1.02 | od176128/2024_2025 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:<br>1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 228.99 | cum | 8,393.81 ₹19,22,131.35 | 8,239.73 ₹18,86,848.73 Lowest |
| 1.03 | od176130/2024_2025 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:<br>1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 87.02 | cum | 10,542.83 ₹9,17,479.13 | 10,349 ₹9,00,611.38 Lowest |
| 1.04 | od176226/2024_2025 : Centering and shuttering including strutting, etc. and removal of form for:<br>Foundations, footings, bases of columns, etc for mass concrete | 2,320.44 | sqm | 385.54 ₹8,94,632.64 | 378.47 ₹8,78,218.06 Lowest |
| 1.05 | od176225/2024_2025 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level<br>Thermo - Mechanically Treated bars of grade Fe-500D or more | 18,273.41 | kilogram | 113.28 ₹20,70,079.5 | 111.2 ₹20,32,003.19 Lowest |
| 1.06 | od176196/2024_2025 : Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used .<br>With G.I barbed wire | 40,091.34 | metre | 15.98 ₹6,40,635.49 | 15.69 ₹6,29,033.06 Lowest |
| 1.07 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 8,200 | sqm | 15.91 ₹1,30,494.8 | 15.62 ₹1,28,084 Lowest |
| 1.08 | 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,100 | sqm | 8.1 ₹33,204.67 | 7.95 ₹32,595 Lowest |
| 1.09 | 2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 150 | each | 482.23 ₹72,334.04 | 473.38 ₹71,007 Lowest |
Tender Value
₹58.9 L
EMD Value
₹50,000
Closing Date
26 Apr 2025, 1:00 pmClosed
Project Director
The office of The Project Director, 1st Floor, JP Krishna Building, Pallimukku, Pettah Trivandrum - 695024
Providing and constructing barbed wire fencing of Additionally Acquired 45.98 Acres industrial Land of KINFRA Industrial Park, Mattannur
2025_WAPCO_756442_1
WAP/INFRA/KERALA/2025/KRF/506
Open Tender
Civil Works - Buildings
Item Rate
180 days
Mattannnur
As per Tender Document
21 documents required · 21 mandatory
₹2,950
₹50,000
13 Aug 2025
29 Mar 2025
28 Apr 2025
29 Mar 2025
26 Apr 2025
12 Apr 2025
Amount
Fencing work
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
od176128/2024_2025 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:<br>1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
od176130/2024_2025 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:<br>1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
od176226/2024_2025 : Centering and shuttering including strutting, etc. and removal of form for:<br>Foundations, footings, bases of columns, etc for mass concrete
od176225/2024_2025 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level<br>Thermo - Mechanically Treated bars of grade Fe-500D or more
od176196/2024_2025 : Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used .<br>With G.I barbed wire
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
od158558/2024_2025 : Land surveying for Plot-Reconnaissance survey & finalizing the<br>alignment of fencing area & Longitudinal Alignment levels at 30meter<br>interval in plane area and at a closer interval of 3 to 5 m at uneven places.<br>(Each interval contains one point only)<br> Alignment plan and profile with LS only<br>for the proposed LAND
SREEKUMAR K S (BID ID -2202043)
Bidder Name
RAJEEV P I
SREEKUMAR K S
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .