Executive Engineer, Und Irrigation Division, Jamnagar
SASOI-II WATER RESOURCES PROJECT Annual Maintenance of Dam – Jungle Cutting, Desilting of drains etc. at Dam site throughout the year 2026-27.
330144
07 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹14,000
1 Aug 2026
1 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : SASOI-II WATER RESOURCES PROJECT
Annual Maintenance of Dam – Jungle Cutting, Desilting of drains etc.
at Dam site throughout the year 2026-27.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Clearing the silt from canal /drain bed by digging 1065.00 Cum. 166.00
the same to the required bed level and gradient
including depositing the excavated earth regularly
on spoil bank for utilizing the same for preparing
the bund after bracking the clods as and where
directed for lead upto 30 mt and lift as under.
(Excluding weed cutting) (A) Depth 0 to 3.0 Mt.
2 Rehandling the excavated stuff incl. stacking as 1005.00 Cum. 59.50
and where directed for all sort of soil, soft
murrum, hard murrum, soft rock, hard rock etc. for
specified lead as under and all lift incl. loading
unloading transportation etc complete without
rolling and watering.
(c) Lead 500 mt.to1 Km.
3 Labour charges for cleaning of manholes including 15.00 No./ 2367.00
desilting, removing grass, clearing inlet and outlet Year
pipe in manhole including depositing the
materials as and where directed up to 50 mt. lead
and all lift etc. complete. (Throughout the year)
4 Maintenance of earthan dam by Cleaning the slope 74270.00 Sqmt. 3.80
of E.dam within the dam boundary incl. gutter per
(Drains) by removing the bushes, shrubs, girth and
small trees including depositing the materials as Year
and where directed up to 50 mt. lead and all lift
etc. complete.(Throughout the year)
5 Cutting & removing green water grass (pine ) with 20080.00 Sqmt. 19.70
silt under slushy condition from canal bed or
bucket including dispose off and cleaning the
surface including removal of silt, debris etc for all
lead & lift etc complete as directed.
6 Providing murrum including spreading the same 1454.00 Cum. 166.00
and dressing the side slope & top surface in
required grade and camber with lead upto 1.0 km
7 Filling the empty bag filled with good selected 2000.00 No. 32.39
earth or sand incl. stiching and laying or stacking
as and where directed with all lead and lift etc.
8 Finishing wall with weather proof exterior 492.00 Sqmt. 122.14
emulsion paint on wall surface (two coats) to give
an required shape even shade after thoroughly
brushing the surface to remove all dirt, and
remains of loose powdered materials etc.complete.
9 Providing and fixing gauge post with M.S. channel 6.55 Sqmt. 821.00
of size 150 x 75 x 75 mm of required length as per
design with necessary foundation and with
painted enameled plate and fixing it on MS channel
etc. complete with necessary oil paint.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 13,21,508=93 Estimated Amount Rs. 13,21,508=93
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender. DELETED
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Executive Engineer
Signature of Contractor Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
6.pdf
BOQ.pdf
Tender Notice No.7.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .