Tender Value
₹24.3 L
EMD Value
₹48,516
Closing Date
9 Oct 2026, 2:00 pm
Executive Engineer,KID
Irrigation Waterways Directorate Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
M/R To Damaged slope of Pilgrim Road 5 at Lot-8 under Kakdwip Irrigation Division i.c.w. G.S. Mela-2027
2026_IWD_5075711_24
WBIW/EE/KIDIVISION/e-NIT- 03 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Kakdwip
Please refer Tender documents.
6 documents required · 6 mandatory
₹48,516
Yes
26 Sept 2026
26 Sept 2026
9 Oct 2026
26 Sept 2026
9 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Page-C-8, Item-2.01 (i) of USoR /I&WD
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(i) 15 cm av. Diameter | 4,485.5 | Mtr | 258.62 | ₹11,60,040.01 |
| 2 | Page-C-8, Item-2.02 (i) of USoR /I&WD
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (i) 15 cm av. diameter | 2,714.4 | Mtr | 125.14 | ₹3,39,680.02 |
| 3 | Page-C-9, Item-2.05 (i) of USoR /I&WD
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus. | 819 | Mtr | 123.95 | ₹1,01,515.05 |
| 4 | Page-C-24, Item-2.78 of USoR
Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge
b)Two Coat | 2,427.6 | Sqm | 65.55 | ₹1,59,129.18 |
| 5 | Appvoved Rate by the SE/EC
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of
E) Beyond 4.00 Km and upto 5.00 Km
NB: Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Note 1: Extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹43.00/m³ [Vide Ref: Page No: 87, Item No: 16(Note) of NH Schedule of Rates 2019]
Note 2: The rate of royalty for earth/soil/fine sand/silt used for filling/brick making ( including such materials derived from dredging/de-silting) as notified same as that of Ordinary Earth/Brick Earth/fuller Earth vide Gazette notification No. 581-ICE-12013(99)/6/2022-MINES SEC-Dept. of ICE, Date:- 26.09.2022 of Department of Industry, Commerce & Enterprises Mines Branch @ ₹29.00/m³ has been added in this derivation. The royalty will be paid to the agency on production of necessary documents in support of paymentmade towards the royalty.
Note 3: Extra rate towards cess for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹5.30/m³ [Vide Ref: Memo No: 138/3512-29/C/99 Dated; 22.06.2000 of DLR & Jt. LRC, WB] | 754.08 | Cum | 392.46 | ₹2,95,946.24 |
| 6 | Page-C-11, Item-2.24 of USoR
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 19,375 | Each | 7.15 | ₹1,38,531.25 |
| 7 | Page-C-12, Item-2.27 of USoR
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 19,375 | Each | 8.34 | ₹1,61,587.5 |
| 8 | Page-C-12, Item-2.29 of USoR
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 19,375 | Each | 3.58 | ₹69,362.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 0.26 MB
BOQ_5166551.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .