| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.6 Cr+₹9.6 L (6.57%)Rejected-AOC | ₹1.6 Cr+₹9.6 L (6.57%) | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹1.6 Cr+₹18.4 L (12.6%)Rejected-AOC | ₹1.6 Cr+₹18.4 L (12.6%) | L3 | Rejected-AOC L3 bidder |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
6 Mar 2024, 6:00 pmClosed
SUPERINTENDING ENGINEER
KD CIRCLE CHENGANNUR
GENERAL Kuzhiyadi Paliyakari Padasekharam KP Mitigation of flood in the Padasekharam of Kuttanadu Taluk Mititgation of flood in Kuzhiyadi Paliyakkary Padasekharam in Veliyanadu Panchayath General Civil Work
2024_Irrig_657645_1
IRR/KP/TR/5557/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
545 days
Veliyanad Alappuzha
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,508
Yes
₹50,000
Yes
2 Jul 2024
12 Feb 2024
11 Mar 2024
12 Feb 2024
6 Mar 2024
12 Feb 2024
12 Feb 2024 - 6 Mar 2024
Amount
PROTECTION WORKS
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
OD15053/2023-2024:Earthwork in excavation in or under water by mechanical means(Hydraulic excavator) /manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plain) including disposal of excavated earth, lead up to 50m and lift upto 1.5m,disposed earth to be leveled and neatly dressed. All kinds of soil. certificate:- Certified that the observed data is prepared by taking the rate and labour charges as per schedule of rates and has been prepared as per the actual observation at site
OD23444/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD25477/2023-2024: DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble (without bond stone)including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD23445/2023-2024:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD15054/2023-2024:Earthwork in rough excavation banking excavated earth in layers not exceeding 20 cm in depth,breaking clods and dressing up in embackment for roads ,flood banks,marginal banks and guid banks with all leads and lifts in allkinds of soil(based on DSR 2.2.1-2.4-2.5+20% )under excavation in stiff kayal clay.
OD15072/2023-2024:banking contractor supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and topmost layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50m and lift up to 1.5m.All kinds of soil. (specification - 2.3.1+60.2.1-2.25)
OD32868/2023-2024:Supplying and stacking well matured 1/2 split and straight 6 m long coconut post for driving down through various strata bellow bed level including cost conveyance labour charges etc complete. ( Sl. No. 3.4 page 79- Details vide Order no. W7/194/11/K.P (a) dated 9.10.2022 of CE, Kuttanad Package and Inland Navigation)
OD32869/2023-2024:Coconut Pile- Driving down half split coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accessibility to hydraulic excavator through land, but through water bodies having minimum width greater than 10metre
OD32870/2023-2024:Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification. ( Sl. No. 3.7 page 80- Details vide Order no. W7/194/11/K.P (a) dated 9.10.2022 of CE, Kuttanad Package and Inland Navigation)
MOTOR THARA
OD32921/2023-2024:Putting up ring bund of top width 1.50m, bottom width 2.75m. and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of wailing pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Separation membrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and wailing pieces using reaper and nails in full height including tying properly using iron wire and coir altogether, supply and filling inside with hard clay/cut earth up to 2.50m, level and conveyed with all leads and lifts including consolidating properly and maintaining the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. ( Sl. No. 5.3 page 86- Details vide Order no. W7/194/11/K.P (a) dated 9.10.2022 of CE, Kuttanad Package and Inland Navigation)
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD23447/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.
OD15050/2023-2024:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accessibility to hydraulic excavator through land and water bodies having minimum width upto 10 Metre
2.27:Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
OD23472/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
OD23473/2023-2024:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD15052/2023-2024:Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc,complete for improving the CBR value of subgrade
MOTOR SHED
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
12.1.2:Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.80 mm thick with zinc coating less than 275 gm/m2
12.4.2:Providing ridges or hips width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete.0.63 mm thick with zinc coating not less than 275 gm/m2
OD15048/2023-2024:Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc,complete for improving the CBR value of subgrade
50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
11.5:62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufactures specification. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
13.53.1:Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to given an even shade:New work (two or more coats) including coat of approved steel primer but excluding a coat of mordant solution.
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
SUFFIN FRANCIS AND COMPANY
PK CONSTRUCTIONS
Bidder Name
Joseph Thomas
PK CONSTRUCTIONS
SUFFIN FRANCIS AND COMPANY
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1016408.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .