| 1 | L1₹21.9 LAccepted-AOC | ₹21.9 L | L1 | Accepted-AOC Award |
| 2 | L2₹26.9 L+₹5.1 L (23.2%)Rejected-Finance | ₹26.9 L+₹5.1 L (23.2%) | L2 | Rejected-Finance Lowest 2 |
| 3 | L3₹39.6 L+₹17.8 L (81.3%)Rejected-Finance | ₹39.6 L+₹17.8 L (81.3%) | L3 | Rejected-Finance Lowest 3 |
Tender Value
₹27.4 L
EMD Value
₹48,600
Closing Date
11 Feb 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer HP PWD Division Tanda
Providing and fixing, Supply and installation of Medical Gas pipe line system at Oxygen upgradation including maintenance for five year (Deposit work)
2020_PWD_43415_7
PWD-Civil-11175-11205-Tanda
Open Tender
Civil Works
Item Rate
90 days
Tanda
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,500
Executive Engineer HP PWD Divison Tanda
₹48,600
12 Apr 2021
1 Feb 2021
12 Feb 2021
1 Feb 2021
11 Feb 2021
1 Feb 2021
Amount
Providing, Fixing, Supply & Installation of Imported Oxygen Main Manifold (10+10). with 20nos. pig tail pipes & 20nos. of non return valves with middle frame complete. 20cylinder manifold bank as left side and 20cylinder manifold bank as right side complete with 20 nos.pig tailpipes and 20nos. non-return valves. : It should fully complies and meets with the requirements of the UK DOH Health Technical Memorandum 02-01 (HTM 02-01) standards only. It shall be duly CE marked to the Medical Device Directive 93/42/EEC under the auspices of notified body no. and under this directive, med gas products are classified as Class IIb Medical Devices. It shall be provided with a copy of the certificate of origin from chamber of commerce complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Imported Oxygen Digital Fully LCD Screen Automatic Changeover Control Panel of 1750lpm : It should fully complies and meets with the requirements of the UK DOH Health Technical Memorandum 02-01 (HTM 02-01) standards only. It shall be duly CE marked to the Medical Device Directive 93/42/EEC under the auspices of notified body no. and under this directive, med gas products are classified as Class IIb Medical Devices. It shall be provided with a copy of the certificate of origin from chamber of commerce. Automatic Changeover Manifolds are intended to provide a continuous supply of medical gases for respiratory, clinical and surgical use in healthcare facilities. The system shall be duplex such that the supply is maintained in single fault condition. The Automatic Changeover Manifolds shall be supplied pre-piped, pre-wired and fully tested and comply with the United Kingdom Department of Health (DoH) publication HTM 02-01 and NHS Model Engineering Specification C11. A test certificate shall be provided with each system detailing the results of the factory tests (*EMC Test passed, Adiabatic test passed. Copy of certificate must be submitted.) It should have halogen polymers free. It should have Digital 3.5’ colorful display. It should have Integrated & protected test point. All components degreased for oxygen use .Average gas consumption indication (for not liquefied gases). Remaining gas volume indication (for not liquefied gases). It should have general maintenance indicator. It should have Pressure transmitters monitor both banks of cylinders. The system should have a universal input and work in a wide power range: AC 90 to 264 Volts 50/60 Hz. The manifold control system shall be powered by an extra low voltage on board supply. A separate power supply board should be foreseen. The controller shall include alarm connections with a wire monitoring technology and sets of BMS connections for both normally open and normally closed operation. • Line pressure shall be continuously monitored by an electronic pressure sensors; mechanically actuated pressure switches are not acceptable. The manifold shall be capable of being fully isolated via a full flow ball valve in order to change any regulator without interruption of supply. In the event of a low line pressure condition, both solenoid valves shall open to enable both banks to deliver gas and restore normal pipeline pressure. The system should incorporate graphical display to indicate pressure level in each bank of cylinders and a line pressure. Digital display should be backed up by mechanical gauges in case of power failure. • All alarms should be duplicated on a display and embedded membrane panel with LEDs. A manifold status panel shall be provided with colour coded LED indication lights for the following operating and fault indications: Power On (Green), High Line Pressure (Red), Low Line Pressure (Red), Reserve Low (Amber), Left Bank Running (Green), Left Bank Low (Amber), Left Bank Empty (Amber), Right Bank Running (Green), Right Bank Low (Amber), Right Bank Empty (Amber). The pressure regulators shall be designed and certified for use of oxygen at 230 bar and 60°C complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Mounting Frame :- Free standing Modular Mounting Frame made of powder Coated MS Section for providing Strength to manifold. The frame does not require any support from the wall and is free standing. The Frame should have the mounting plate to install the Panel. The frame should be assembled without welding using threaded nut and bolt connection and can be dismantled for relocation. It should have provision for grouting on the floor. Over all Length of Frame will be 3500 mm to provide sufficient space to accomodate 10 cylinders on each side complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Slotting angle cable tray Type support (Inside Gas Manifold) complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Imported Medical Gas Terminal Units (Gas Outlet Points) for Oxygen : It should fully complies and meets with the requirements of the UK DOH Health Technical Memorandum 02-01 (HTM 02-01) standards only. It shall be duly CE marked to the Medical Device Directive 93/42/EEC under the auspices of notified body no. 0088 and under this directive, med gas products are classified as Class IIb Medical Devices. It shall have gas indexing geometry. Other gas specific indexing geometries are not acceptable. Terminal unit front fascia should be metal and it should be hundred percent metal. Gas specific components comprising the terminal unit second fix shall be manufactured from die-cast zinc alloy or similar hard wearing metal. Plastic components are not acceptable. Terminal units socket castings shall be permanently coated with a low friction fluoropolymer for maximum reliability and service life. The terminal unit socket die-casting shall incorporate a gas indexing pin to overcome the risk of loosening due to rough handling or abuse. The second fix socket shall incorporate a sheer-plane to safeguard the first fix and pipeline in the event of accidental damage or bed jacking. Gas specific components shall incorporate the gas identity marking permanently stamped or cast into the component surface. The first fix shall be all metal construction, with a brass base block and copper stub pipe. The first fix shall incorporate an integral check valve to enable servicing of the second fix and valve seals without isolation of the gas supply complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Imported OXYGEN FLOWMETER WITH POLYSULPHONE HUMIDIFIER : It shall fully comply and meets with active medical device of class IIa and in compliance with the EN ISO 15002: 2008 standard. It should be duly CE marked and comply with 93/42/EEC Medical Devices: General. It shall be CE marked with the notified body number specified. It shall be provided with a copy of the certificate of origin. Pressure compensated to prevent back pressure build up on flow indicator. It should have cartridge knob, extremely reliable, easy-to-clean and ensuring an optimized adjustment. Perfect tightness of the knob thanks to its polyamide seat. The knob was tested under pressurized working conditions during more than 10,000 cycles without showing any leakage after closing. Expanded scale providing higher reading accuracy. Durable polycarbonate flow tube with cover. Monoblock scale cover made of polyamide for a higher sturdiness and a greater safety. The inopportune unscrewing of the monoblock scale cover is not possible. Body made of nickel-plated brass, very strong. Flowmeter should be MRI compatible. Flow meter should be placed in the vertical position. It should be light weight of 275 g. The flow meters should be of 0-15 LPM range for oxygen and with inlet pressure 50-60psi. (4.5 bar). The closing of the knob should be without any leakage. Polysulphone 250cc Humidifier bottle should be unbreakable, reusable to disinfectants and complements complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Imported LINE LOCKABLE ISOLATION VALVES WITH STUB PIPES: It should fully complies and meets with the requirements of the UK DOH Health Technical Memorandum 02-01 (HTM 02-01) standards only. It shall be duly CE marked to the Medical Device Directive 93/42/EEC under the auspices of notified body no. and under this directive, med gas products are classified as Class IIb Medical Devices. It shall be provided with a copy of the certificate of origin from chamber of commerce. Line Isolation valves and should comprise full-bore ball valve complete with copper stub pipes for ease of installation. Valve - connected to the copper stub pipes by means of flat faced unions fitted with nitrile O-ring seals, allowing removal of the valve without the need to distort the pipe work. Stub pipes for valve up to 54 mm will be connected to the valve body using screwed connectors, while valve above this size will use flanged connectors. Valve - Brass body, end cap and stem, with a full – bore chrome plated brass ball. Valve - Operate from fully closed to fully open with a quarter turn of the handle. All line values - Supplied with a mechanism to enable the unit to be locked in the fully closed or fully open position. Supplied with copper stub pipes for ease of installation using inert gas jointing procedures. O-Ring Seals on the valve stub allow gas tight capping at a spur for further expression complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Imported 28MM BALL VALVE --- LINE LOCKABLE ISOLATION VALVES WITH STUB PIPES
Providing, Fixing, Supply & Installation of Imported 22MM BALL VALVE --- LINE LOCKABLE ISOLATION VALVES WITH STUB PIPES
Providing, Fixing, Supply & Installation of Medical Grade Copper Pipes of BS EN 13348. Copper pipes must be inspected and duly Third Party Certified by Lloyd’s Registered Asia. Medical Grade Copper pipes manufactured from Phosphorous de-oxidized non-arsenical copper to BS:EN: 1412:1996 grade CW 024A ( Cu-DHP) manufactured to metric outside diameters and having mechanical properties in accordance with BS:EN: 13348, Degreasing of pipe shall be such that there is less than 20 mg/m2(0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS:EN:13348 complete including maintenance for five year and carriage of materials within all leads, lifts and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing, Fixing, Supply & Installation of Imported 54MM OD X 1.2MM THICK
Providing, Fixing, Supply & Installation of 28MM OD X 1 MM THICK
Providing, Fixing, Supply & Installation of 22MM OD X 1 MM THICK
Providing, Fixing, Supply & Installation of Imported Stainless Steel Adaptor/ Probes
j k m consultant
Medical Products Service
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .