Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Fee/PreQual/Technical/Finance PALACE COMPOUND NEAR TELEPHONE BHAVAN AGARTALA | +16.31% | ₹13.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.9 L+₹31,401.73 (2.31%)Admitted-Fee/PreQual/Technical/Finance | +19.00% | ₹13.9 L+₹31,401.73 (2.31%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.7 L
EMD Value
₹12,465
Closing Date
7 Sept 2026, 3:00 pmClosed
Executive Engineer IE Division Agartala
O/o the Executive Engineer IE Division Agartala
Operation of the 09 Nos DG Sets installed in the AGMC and GBP hospital Agartala round the clock for a period of 06 Months wef SEPTEMBER 2026 to FEBRUARY2027
2026_CEPWD_76351_1
EE_IED_AGT_86_2026_27
Open Tender
Electrical Works
Percentage
180 days
AGMC and GBP hospital Agartala
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹12,465
8 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hiring of Skilled Electrician/Semi-Skilled Electrician for providing of round the clock duty in 03 (Three) shifts for operation of the existing DG Sets in 04 (Four) Separates places located at AGMC & GBP Hospital Premises etc. as per the directions of the Engineer-In-Charge. | |||||
| 1.01 | 01 (One) Highly Skilled Electrician from 9.00 AM to 5.00 PM for supervision and testing of whole system i.e. (04 location) for 180 days = 180 Shifts | 180 | shifts | 785.88 | ₹1,41,458.4 |
| 1.02 | 01 (One) Skilled Electrician from 6.00 AM to 2.00 PM for each location i.e, (03 location x 01 Skilled Electrician) = 03 Skilled Electrician/Day. Total Shift = 03 Skilled Electrician/Day X 180 days = 540 Shifts | 540 | shifts | 671.42 | ₹3,62,566.8 |
| 1.03 | 01 (One) Skilled Electrician from 02.00 PM to 10.00 PM for each location i.e, (03 location x 01 Skilled Electrician) = 03 Skilled Electrician/Day. Total Shift = 03 Semi Skilled Electrician/Day X 180 days= 540 Shifts | 540 | shifts | 671.42 | ₹3,62,566.8 |
| 1.04 | 01 (One) Semi-Skilled Electrician from 10.00 PM to 06.00 AM for each location i.e, (03 location x 01 Skilled Electrician) = 03 Skilled Electrician/Day. Total Shift = 03 Skilled Electrician/Day X 180 days= 540 Shifts | 540 | shifts | 556.96 | ₹3,00,758.4 |
stage.html
html • 0.02 MB
finance_77723.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
DNIeT86.pdf
Tender Documents • 2.16 MB
BOQ_77723.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .