Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
2 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
This tender is floated for construction of 3X350 MT Mounded Storage Vessel at Gandhinagar, Gujrat.
20000430-HD-10157
20000430-HD-10157
Open Tender
Two Bid
Gandhinagar, Gujarat
₹0
₹30 L
2 Oct 2020
11 Sept 2020
2 Oct 2020
2 Oct 2020
11 Sept 2020 - 21 Sept 2020
18 Sept 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Area Cleaning of bushes/shrubs | Area Cleaning of bushes/shrubs — CLEARING OF ALL VEGETATION STUMPS, BUSHES, LOGS AND OTHER PERISHABLE AND OBJECTIONABLE ORGANIC MATERIALS, REMOVAL OF TOP 75 MM OF SOIL FROM THE AREAS TO BE DEVELOPED INCLUDING CARTING AWAY, DISPOSING, BURNING, STACKING, SPREADING ETC ANYWHERE WITHIN THE PLOT AS SPECIFIED AND DIRECTED. | - | Square Meters |
| 2 | Earthwork excavation-all soils | Earthwork excavation-all soils — EXCAVATION OF EARTH, FOR DEPTH UPTO AND INCLUDING 3.0 M,1.FOR FOUNDATIONS OF BUILDINGS, ROADS, DRIVEWAYS, PEDESTALS ETC. OR ANY OTHER PLACE AS, IN ORDINARY SOILS INCLUDING SOFT ROCK/DISINTEGRATED ROCK, IN BOTH DRY AND WET CONDITIONS.2.INCLUDING PUMPING AND BAILING OUT SURFACE AND SUBSOIL WATER, SHORING, STRUTTING AS REQUIRED AS PER SITE CONDITION, SLUSH REMOVAL, INCLUDING BACKFILLING ETC, IN LAYERS AT ALL HEIGHTS AND DEPTHS AS PER DRAWING AND SPECIFICATIONS WHEREVER REQUIRED, IN FOUNDATION PITS, UNDER FLOORS AND OTHER PLACES WITH EXCAVATED SUITABLE SURPLUS EARTH, INCLUDING RECLAIMING FROM SPOIL HEAPS KEPT ELSEWHERE INCLUDING DRESSING AND LEVELLING, WATERING AND MECHANICAL COMPACTION ETC.3.TRANSPORTING SURPLUS SOIL TO UNOBJECTIONABLE PLACE WITHIN BOUNDARY LIMITS AND SPREADING IN LAYERS.4.THE MEASUREMENT FOR PAYMENT SHALL BE FOR THEORETICAL VOLUME ONLY AND IT SHALL BE THE VOLUME OF THE BLOCK OF THE EXCAVATION HAVING MAXIMUM BOTTOM DIMENSION OF THE FOUNDATION AS PER DRAWING AND TO ACTUAL DEPTH UP TO AND INCLUDING 3.0 M | - | Cubic Meters |
| 3 | Suppy/Laying MURRUM | Suppy/Laying MURRUM — SUPPLYING & PROVIDING APPROVED QUALITY MURRUM OF PI NOT GREATER THAN 15 AND LABORATORY MDD NOT LOWER THAN 1.7 G/CC FOR FILLING AS PER TENDER SPECIFICATION FOR BACK FILLING, SUB-GRADE & PLINTH FILLING, AROUND THE FOUNDATION, ETC AS APPLICABLE INCLUDING COST OF SUPPLY OF MURRUM FROM BORROW PITS OUTSIDE HPCL PLANT; TESTING, SPREADING IN LAYERS OF 200 MM THICK, WATERING AND COMPACTING WITH PLATE VIBRATOR/HAND COMPACTOR AS DECIDED BY THE SITE-IN-CHARGE TILL MIN. 95%MDD OF LAB STANDARD PROCTOR TEST IS ACHIEVED; TESTING; COMPLYING ALL THE REQUIREMENT OF MINING DEPT/APPLICABLE DEPT OF UT OF D&NH; ROW PAYMENTS; TRANSPORTATION TO SITE FOR ALL APPLICABLE LEADS & LIFTS COMPLETE IN ALL RESPECT AS PER TENDER SPECIFICATION/SCOPE OF WORK ETC, AS DIRECTED BY HPCL EIC. QUOTED RATES ARE DEEMED TO INCLUDE DRESSING UP THE SURFACE, BREAKING CLODS, REMOVAL OF SLUSH AND WATER, REMOVAL OF SURPLUS EARTH AFTER FORMATION, WATERING RE-HANDLING AT SITE AND CONDUCTING INITIAL LABORATORY TESTS ON SAMPLES AND CONSEQUENT INSTITUTE DRY DENSITY/OMC TESTS AT 500 SQM OF AREA AFTER EACH LAYER OF FILLING. THE INITIAL FILLING SHOULD START ONLY AFTER STRIPPING THE AREA FROM BUSHES, GRASS AND OTHER VEGETATION. NO SEPARATE PAYMENT WILL BE MADE FOR CLEARING BUSHES, VEGETATION AND OTHER MATERIALS. JOB TO BE COMPLETED AS PER ATTACHED TECHNICAL SPECIFICATION AND AS DIRECTED BY HPCL EIC COMPLETE.CONTAINING NOT MORE THAN 20% COHESIVE FINES NAMELY CLAY, 20MM AND DOWN SIZE GRADING | - | Cubic Meters |
| 4 | Supply/Laying of WSEL Layer us 12435-GANDHINAGAR LPG | Supply/Laying of WSEL Layer us 12435-GANDHINAGAR LPG — SUPPLYING AND LAYING OF WSEL LAYER IN DENSE TO VERY DENSE CONDITION USING 150 MM TO 180 MM SIZED BASALT OR GRANITE STONES WITH INTERSTICES PACKED WITH SPALLS AND STONE DUST AND WATERING COMPACTING WITH VIBRO-ROLLER TO ACHIEVE THE DESIRED COMPACTION AS PER THE DETAILED PROCEDURE OF CONSTRUCTION AND COMPACTION OF WSEL GIVEN IN THE TENDER SPECIFICATIONS, FILLING IN LAYERS, INCLUDING THE COST OF ALL LABOUR, MATERIAL, EQUIPMENT, LEAD, LIFT ETC. ALL COMPLETE AS PER TECHNICAL SPECIFICATIONS AND AS DIRECTED BY THE ENGINEER-IN-CHARGE. THE COMPACTION OF EACH LAYER IS DEEMED TO BE ACHIEVED ONLY WHEN 98% MDD IS ACHIEVED FOR THE LAYER OF MURRUM/SERVICEABLE EARTH LAID IMMEDIATELY ABOVE THE WSEL LAYER AND THE MURRUM DOES NOT UNDERGO FURTHER COMPRESSION AS WITNESSED BY OBSERVING THE LEVELS. | - | Cubic Meters |
| 5 | SUP & FLG RIVER | SUP & FLG RIVER — SUPPLYING AND FILLING APPROVED QUALITY LOCALLY AVAILABLE BEST QUALITY SLAG SAND IN LAYERS OF COMPACTED THICKNESS 250 MM EACH. RATE TO INCLUDE ARRANGING FOR APPROVED SLAG FROM OUTSIDE PLANT PREMISES, PAYMENT OF ALL ROYALTIES, TAXES, CESS, ETC TO THE STATUTORY AUTHORITY, LOADING, TRANSPORTATION, UNLOADING, REMOVAL OF DEBRIS, ORGANIC MATTER ETC, SPREADING IN LAYERS, WATERING, ROLLING AND COMPACTING EACH LAYER WITH 10 METER VIBRO ROLLER TILL MAXIMUM COMPACTION IS ACHIEVED AND FINISHING TO SLOPES AND GRADES AS PER DRAWINGS SPECIFICATIONS AND INSTRUCTIONS OF ENGINEER IN CHARGE. RATE SHALL BE APPLICABLE FOR ALL DEPTHS/HEIGHT BELOW/ABOVE NGL UPTO 1.5 METER. NOTE: SLAG SAND OF GRAIN SIZES 5 MM TO 0.075 MM WITH 10% FINES AND ROLLED WITH VIBRO ROLLER TO BE USED TO OBTAIN DENSE TO VERY DENSE LAYERS. FOLLOW THE PROCEDURE OF CONSTRUCTION AND COMPACTION AS STATED IN TENDER DOCUMENT. | - | Cubic Meters |
| 6 | Supply/Laying Geotextile sheet | Supply/Laying Geotextile sheet — SUPPLY AND LAYING GEOTEXTILE SHEET-SUPPLYING AND LAYING TERRAM 1000(WT: 130 TO 135 GRAMS/M2 AND ROLL WT OF 60 KG FOR 4.5 METER WIDTH AND 100 METER LENGTH) GEOTEXTILE SHEET WITH LAPS ON EDGES INCLUDING THE COST OF ALL LABOUR, MATERIAL AND EQUIPMENTS COMPLETE AS PER SPECIFICATIONS, APPROVED DRAWINGS AND AS DIRECTED BY THE ENGINEER-IN-CHARGE. AS-LAID AREA ONLY WILL BE MEASURED FOR MAKING PAYMENT. OVERLAPS SHALL NOT BE MEASURED. | - | Square Meters |
| 7 | Supply/Laying UPVC Sheet | Supply/Laying UPVC Sheet — SUPPLY AND LAYING UPVC SHEET OF SPECIFIC GRAVITY 1.35 TO 1.43-SUPPLYING AND LAYING 1000 MICRON THICKNESS UPVC SHEET WITH LAPS ON EDGES INCLUDING THE COST OF ALL LABOUR, MATERIAL, ADHESIVE AND EQUIPMENTS COMPLETE AS PER SPECIFICATIONS, APPROVED DRAWINGS AND AS DIRECTED BY THE ENGINEER-IN-CHARGE. AS-LAID AREA ONLY WILL BE MEASURED FOR MAKING PAYMENT. OVERLAPS SHALL NOT BE MEASURED. AFTER LAYING TOP UPVC SHEET, WATER RETENTION TEST FOR 6 HRS SHALL BE CARRIED OUT BY CONTRACTOR. IN CASE OF LEAKAGES, SAME SHALL BE RECTIFIED AND THE RETENTION TEST SHALL BE REPEATED. | - | Square Meters |
| 8 | Supply/Laying Paver 80 MM, | Supply/Laying Paver 80 MM, — SUPPLYING AND LAYING OF CEMENT CONCRETE COLORED INTER LOCKING PAVER BLOCK 80 MM THICKNESS WITH GLOSSY FINISH, I SHAPE OR ANY OTHER APPROVED SHAPE, M-30 STRENGTH OF APPROVED BRAND LAID OVER THE SAND BED. THE CC INTERLOCKING BLOCK TO BE OF UNIFORM GREY COLOR OR AS APPROVED COLOR LAID IN PATTERN AS DIRECTED BY HPCL EIC COMPLETE IN ALL RESPECT AS PER SCOPE OF WORK, DETAILED CONSTRUCTION DRAWING, TECHNICAL SPECIFICATION AND DIRECTION OF THE ENGINEER-IN-CHARGE. SCOPE OF JOB INCLUDE PROVIDING SAND BED OF MINIMUM 50 MM FOR LAYING OF PAVER. THE JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATION, JOB PROCEDURE ETC. COMPLETE AND AS DIRECTED BY EIC. | - | Square Meters |
| 9 | Suply/Laying pea gravel 8-20mm 12435-GANDHINAGAR LPG | Suply/Laying pea gravel 8-20mm 12435-GANDHINAGAR LPG — SUPPLY AND LAYING PEA GRAVEL 8-20 MM-SUPPLY AND LAYING CLEAN, WASHED, GRADED, ROUNDED, HARD PEA GRAVEL OF SIZE 8-20 MM FREE FROM ALL ORGANIC MATERIAL, SULPHATES OR ANY OTHER DELETERIOUS MATERIAL INCLUDING THE COST OF ALL LABOUR, MATERIAL, TRANSPORTATION, SPREADING, EQUIPMENTS ALL COMPLETE AS PER SPECIFICATIONS, APPROVED DRAWINGS AND AS DIRECTED BY THE ENGINEER-IN- CHARGE. | - | Cubic Meters |
| 10 | Supply laying UPVC drain pipe | Supply laying UPVC drain pipe — SUPPLY AND FIXING OF HPCL APPROVED MAKE UPVC CASING PIPE CONFIRMING TO IS 4985/1988 WITH UP TO DATE AMENDMENTS) CASING PIPES 150 MM DIA. | - | Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000430-HD-10157.pdf
TENDER_DOCUMENT • 18.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .