Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹6,963
Closing Date
30 Sept 2026, 10:00 am3d left
Executive Engineer, Mahananda Link Canal Division
Mahananda Link Canal Division, 2nd Mile, Sevoke Road, Siliguri
Maintenance and repair for pre boro irrigation at Dy -2 in between ch. 0.00 km to 10.00 km including Minor 1 and Minor 2 of Dy -2 of TMLC in Block Rajganj Dist. Jalpaiguri during the year 2026-27
2026_IWD_5023164_16
WBIW/EE/MLCD/NIT-01(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
Block -Rajganj
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,963
Yes
23 Sept 2026
23 Sept 2026
1 Oct 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 57,358.4 | Sqm | 2.38 | ₹1,36,512.99 |
| 2 | Earthwork in re-excavation / silt clearance of drainage channels in all kinds of soil including sludge and slush but excluding slush mixed with industrial wastes, sewage, municipal garbage, carcasses, etc and depositing the same as per profile in proper place as directed by the Engineer-in-charge without causing hindrance to traffic and posing health
hazard and making arrangement to maintain the site in workable condition including removal of polypacks, brickbats, stone ballasts & boulders, remnants of bullah & bamboo pins and all kinds of water hyacinth, solid / semi solid compact mass formed due to water hyacinth and burning them to ashes or removing outside Govt land where necessary and removal of thick & thorny jungles upto 30 cm girth including shoring and shuttering, if required, and including initial removal of sludge and slush etc by pan or bucket if required, and making
arrangement for bailing out of any seepage water and removal of sand or soil blown from underneath, all complete.
(Measurement : Pre-work and Post-work level section. Pre-work section to be taken after removal of water hyacinth and all other floating materials etc.)
(a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M | 165.05 | Cum | 154.93 | ₹25,571.2 |
| 3 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 1,081.5 | metre | 34.56 | ₹37,376.64 |
| 4 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | 541 | metre | 13.11 | ₹7,092.51 |
| 5 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | 206 | metre | 26.22 | ₹5,401.32 |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 3,642 | NOS | 7.15 | ₹26,040.3 |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag | 3,642 | NOS | 8.34 | ₹30,374.28 |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 3,642 | NOS | 3.58 | ₹13,038.36 |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size)excluding shuttering and reinforcement if any, inground floor as per relevant IS codes.
(i) North Bengal Variety | 4.35 | cum | 5,712.76 | ₹24,850.51 |
| 10 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approvedstout props with wooden planks/ply wood/steelsheet plate with required bracing for any kind ofplain or reinforced concrete works in all sorts of
minor structure including culvert, box culvert, crossdrainetc. The rate is inclusive of fitting, fixing andstriking out after completion of work as perspecification and direction. (b) Where staging is not required. | 8.1 | Sqm | 255.05 | ₹2,065.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.06 MB
2911.pdf
Other Document • 0.51 MB
BOQ_5108057.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .