Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 LAdmitted-Finance | ₹3.7 L | L2 | Admitted-Finance |
| 3 | L3₹3.9 LAdmitted-Finance | ₹3.9 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SARLA DEVI CONTRACTOR L3 | PARVEJ URF MEENU L2 | MAHENDRA KUMAR CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.01 | Cleaning thick bushes & thorny jungle without uprooting. | 17,380 | Sqm | 5.3 ₹92,114 | 5.08 ₹88,290.40 | 3.37 ₹58,570.60 |
| 1.02 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5 cm. | 6,715 | Sqm | 5.87 ₹39,417.05 | 5.63 ₹37,818.88 | 3.46 ₹23,207.04 |
| 1.03 | Slush and lehal clearance/trench digging including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 1,366 | Cum | 65 ₹88,790 | 62.37 ₹85,197.42 | 63.36 ₹86,549.76 |
| 1.04 | Earth work clearance/trench digging including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 2,534 | Cum | 65 ₹1.6 L | 62 ₹1.6 L | 29.44 ₹74,600.96 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
4 May 2026, 2:00 pmClosed
Executive Engineer
Office Sharda Sagar Division Pilibhit
Cleaning of Madhotanda Escape Between Km.0.000 to Km 3.950 for Year 2026-27(Lot 03)
2026_UPIDC_1143214_3
02/E.E/2026-27
Open Tender
Civil Works
30 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹7,800
29 May 2026
29 Apr 2026
4 May 2026
29 Apr 2026
4 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Cleaning thick bushes & thorny jungle without uprooting. | 17,380 | Sqm | 518 | ₹90,02,840 | Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge |
| 1.02 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5 cm. | 6,715 | Sqm | 100 | ₹6,71,500 | Earth work in embankment by power tranported earth with a leadUpto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders Diversion of Road. |
| 1.03 | Slush and lehal clearance/trench digging including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 1,366 | Cum | 100 | ₹1,36,600 | Earth work in embankment by power tranported earth with a leadUpto 200m. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders Diversion of Road. |
| 1.04 | Earth work clearance/trench digging including lift upto 1.5m and lead upto 30 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 2,534 | Cum | 10 | ₹25,340 | Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc. |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_2135302.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid