Loading…
Loading…
Tender Value
₹16.1 L
EMD Value
₹17,000
Closing Date
18 Apr 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Anganwadi Centre (AWC) buildinga at roof of Paikasahi Primary School in Ward No.56.
2026_ORULB_127693_25
MC(CMC)CTC_Div-IIINo1/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹17,000
Yes
7 Apr 2026
7 Apr 2026
22 Apr 2026
7 Apr 2026
18 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge. | - | Cum | - | - |
| 2 | b)Earth work in excavation of foundation in all kinds of soil(1.50mtr to 7.50mtr depth) | - | Cum | - | - |
| 3 | Filling foundation and plinth with Sand well watered and rammed including cost,conveyance and royality of sand etc complete. | - | Cum | - | - |
| 4 | Supplying all labour,materials,T&P for Cement Concrete (1:3:6) in foundation using 4 cm size hard granite Hand Broken metal including cost of materials,royalty & conveyance charges with watering,curing all complete as per direction of Engineer-in-charge. | - | Cum | - | - |
| 5 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | - | Cum | - | - |
| 6 | Supplying all labour,materials & T&P for Brick masonary with Fly Ash bricks in Foundation & Plinth having C.S not less than 35 kg/Cm2 in Cement Mortar (1:6) including watering and curing etc complete as per direction of Engineer-in-charge. | - | Cum | - | - |
| 7 | Supplying all labour, materials, T&P for Cement Concrete M-20 for reinforced cement concrete works in using 12mm to 20 mm size hard granite Crusher Broken chips including cost of materials,royalty & conveyance charges with watering,curing all complete as per direction of Engineer-in-charge.S.T. Slab | - | Cum | 7,795.47 | - |
| 8 | Supplying all labour,materials,T&P for Cement Concrete M-20 for reinforced cement concrete works in using 12mm to 20 mm size hard granite Crusher Broken chips including cost of materials,royalty & conveyance charges with watering,curing all complete as per direction of Engineer-in-charge.Column Beam (1st Floor) | - | Cum | 21,128.22 | - |
| 9 | Lintel in 1st Floor | - | Cum | 16,317.97 | - |
| 10 | Chajja | - | Sqm | 1,439.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_587378.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .