Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.3 LAccepted-AOC WA 43 1ST FLOOR ROYAL HOUSE SHAKARPUR DELHI 110092 | DELHI | DELHI | DELHI | 110092 | 1 | Accepted-AOC L1 BIDDER IN RA | |
| 2 | 2₹24.5 L+₹6.3 L (34.2%)Rejected-Finance MOHLLA SATYAPURI NEAR RELIANCE TOWER NARORA BULANDSHAHAR UP 203389 | BULANDSHAHR | UTTAR PRADESH | 203389 | 2 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 3 | 3₹25 L+₹6.8 L (37.0%)Rejected-Finance KANKER CHHATTISGARH 494771 INDIA UDYAM CG 08 0001930 | KANKER | CHHATTISGARH | 494771 | 3 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 4 | 4₹33.4 L+₹15.1 L (82.7%)Rejected-Finance | 4 | Rejected-Finance HIGHER THAN L1 BIDDER | |
| 5 | 5₹42 L+₹23.8 L (130.1%)Rejected-Finance QTR NO 111 28 TYPE IV PTPP COLONY PARICHAA JHANSI I 7 | JHANSI | UTTAR PRADESH | 284001 | 5 | Rejected-Finance HIGHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | ASIF PASHA POWER MACHINERY SERVICES | MADHU ENGINEERING SERVICES | THE TIME CONSTRUCTION | HITECH POWER PROJECT SERVICES | POWER MECH PROJECTS LIMITED | A K ENGINEERS | BHAGWAT CONSTRUCTION | ECO POWER SERVICES | M/s THERMAL INDIA ENGINEERS |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00“BEARING INSPECTION OF TURBINE BEARINGS NO. 1 TO 4 ALONG WITH LPT OVERHAUL INCLUDING MPI-NFT OF FREESTANDING STAGE BLADES & LPT DRAINAGE MODIFICATION DURING OVERHAULING OF GENERATOR WORKS IN 250 MW U#2 OF SSTPS SURATGARH RVUNL” | ||||||||||||
| 1.01 | Total price for the Mandatory Scope of Work only as per Annexure-A (inclusive of all consumables, input materials and supervision) | 1 | LS | 49,00,000 ₹57,82,000 | 25,00,000 ₹29,50,000 | 45,00,000 ₹53,10,000 | 33,35,000 ₹39,35,300 | 95,00,000 ₹1,12,10,000 | 19,50,000 ₹23,01,000 Lowest | 24,50,000 ₹28,91,000 | 65,00,000 ₹76,70,000 | 42,00,000 ₹49,56,000 |
Tender Value
Refer Docs
Closing Date
13 Apr 2026, 1:00 pmClosed
RSM NOIDA
BHEL PSNR OFFICE PLOT NO 25 SECTOR 16A FILM CITY NOIDA G B NAGAR U.P. 201301
BEARING INSPECTION OF TURBINE INCLUDING MPI NFT OF FREESTANDING STAGE BLADES LPT DRAINAGE MODIFICATION IN 250 MW U2 OF SSTPS SURATGARH RVUNL
2026_BHEL_60023_1
NDA/SRG-2/TG_BEARING/26_016
Limited
Supply, Erection and Commissioning
Lump-sum
20 days
SURATGARH
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
22 Apr 2026
8 Apr 2026
13 Apr 2026
8 Apr 2026
13 Apr 2026
8 Apr 2026
8 Apr 2026 - 13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | HSN/SAC |
|---|---|---|---|---|---|---|
| 1“BEARING INSPECTION OF TURBINE BEARINGS NO. 1 TO 4 ALONG WITH LPT OVERHAUL INCLUDING MPI-NFT OF FREESTANDING STAGE BLADES & LPT DRAINAGE MODIFICATION DURING OVERHAULING OF GENERATOR WORKS IN 250 MW U#2 OF SSTPS SURATGARH RVUNL” | ||||||
| 1.01 | Total price for the Mandatory Scope of Work only as per Annexure-A (inclusive of all consumables, input materials and supervision) | - | LS | - | - | 998717 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tendernotice_2.pdf
PDF • 4.65 MB
Tendernotice_3.pdf
PDF • 1.03 MB
Tendernotice_4.pdf
PDF • 0.46 MB
Tendernotice_5.pdf
PDF • 0.95 MB
Tendernotice_6.pdf
PDF • 1.41 MB
BOQ_64982.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .