Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L Quoted ₹2.3 L | L1 | Accepted-AOC SINCE L1 |
| 2 | L2₹2.3 LRejected-Finance | ₹2.3 L | L2 | Rejected-Finance SINCE L2 |
| 3 | L3₹2.3 LRejected-Finance KATRASGARH BOKARO 828113 JHARKHAND INDIA | BOKARO | BOKARO | JHARKHAND | 828113 | ₹2.3 L | L3 | Rejected-Finance SINCE L3 |
| Sl No | Description | Qty | Unit | M/S OM ENGINEERING L2 | SINHA SALES & SERVICES L1 | M/S DAUD ENGINEERING WORKS L2 |
|---|---|---|---|---|---|---|
| 2.00 | Structure steel work riveted bolted or welded in buildup section trusses and framed work, including cutting hosting fixing in position& applying a priming coat of approved steel primer all completed | 470.62 | kg | 125 ₹58,827.50 | 115 ₹54,121.30 | 125 ₹58,827.50 |
| 3.00 | Supply & fixing of Brake drum (Rear) | 2 | set | 4,800 ₹9,600 | 4,800 ₹9,600 | 4,800 ₹9,600 |
| 4.00 | Supply & fixing of Brake shoe rear with repeat. | 2 | nos | 1,700 ₹3,400 | 1,700 ₹3,400 | 1,700 ₹3,400 |
| 5.00 | Supply & fixing of wheel bearing. (Rear). | 2 | set | 2,400 ₹4,800 | 2,400 ₹4,800 | 2,400 ₹4,800 |
| 6.00 | Supply & fixing of Brake cam | 2 | set | 3,800 ₹7,600 | 3,800 ₹7,600 | 3,800 ₹7,600 |
| 7.00 | Supply & fixing of Hub oil seal. | 4 | set | 1,200 ₹4,800 | 1,000 ₹4,000 | 1,200 ₹4,800 |
| 8.00 | Supply & fixing of rear axle shaft. | 2 | nos | 4,500 ₹9,000 | 4,500 ₹9,000 | 4,500 ₹9,000 |
| 9.00 | Supply & fixing of rear axle bearing. | 1 | nos | 8,100 ₹8,100 | 8,100 ₹8,100 | 8,100 ₹8,100 |
| 10.00 | Supply & fixing of rear hub bearing. | 2 | nos | 2,100 ₹4,200 | 2,100 ₹4,200 | 2,100 ₹4,200 |
| 11.00 | 04 wheel greasing & overhauling. | 1 | job | 2,500 ₹2,500 | 2,500 ₹2,500 | 2,500 ₹2,500 |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
9 Mar 2026, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Repairing of brake system,Hub,spring leaf,gear box , kin pin, tail crown tanker body,Tata model water BHM-1273 of Topa Project Under Kuju Area.
2026_CCL_354765_1
GM (K)/EnM/eTender/25-26/194
Open Tender
Electrical and Maintenance Works
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹3,200
21 May 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 6 Mar 2026
Structure steel work riveted bolted or welded in buildup section trusses and framed work, including cutting hosting fixing in position& applying a priming coat of approved steel primer all completed
Supply & fixing of Brake drum (Rear)
Supply & fixing of Brake shoe rear with repeat.
Supply & fixing of wheel bearing. (Rear).
Supply & fixing of Brake cam
Supply & fixing of Hub oil seal.
Supply & fixing of rear axle shaft.
Supply & fixing of rear axle bearing.
Supply & fixing of rear hub bearing.
04 wheel greasing & overhauling.
Supply & fixing of kin pin kit.
Supply & fixing of Tie rod and drag link.
Supply & fixing of wheel rim and churi lock.
Supply & fixing of gear box chapa assly.
Supply & fixing of gear box clever rod assly.
Supply & fixing of gear box housing with bolt and mounting
Supply & fixing of gear box oil seal & packing kit.
Supply & fixing of pressure plate.
Supply & fixing of clutch plate
Supply & fixing of steering pump
Supply & fixing of wheel cylinder
Supply & fixing of centre bearing cross member & bolt.
Supply & fixing of UJ cross, Yoke teeth, propeller shaft and cutting,welding
Repairing of tail crown system with replacement of tail pinion, tail bearing, crown side bearing & tail cut bearing.
Supply & fixing of Buster assy.
Supply & fixing of rear and front brake disc. assly
contracto profit @ 10%
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_367594.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid