Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance | ₹4.2 L | L1 | Accepted-Finance TECHNO-COMMERCIALLY ACCEPTED L1 |
| 2 | L2₹4.2 LRejected-Finance | ₹4.2 L | L2 | Rejected-Finance Bidder quoted higher than L-1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹3.8 L
EMD Value
₹5,580
Closing Date
1 Jan 2026, 5:00 pmClosed
project officer patherdih coal washery
office of project officer, 5.0 mtpa patherdih nlw washery
Complete Rewinding Repairing of 500 KVA Transformer 11KV440V lighting transformer oil cooled type make bharat Bijlee ltd, made in Germany si no 1790/1 at Patherdih Coal Washery
2025_BCCL_349755_1
BCCL/EWZ/PCW/25-26/17
Open Tender
Electrical and Maintenance Works
21 days
5.0 mtpa patherdih nlw washery
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,580
19 Feb 2026
22 Dec 2025
2 Jan 2026
22 Dec 2025
1 Jan 2026
22 Dec 2025
22 Dec 2025 - 24 Dec 2025
Item Description/ Heading
cost of new copper super anamled wire and strip 360 kg @Rs.1000= Rs.360000/- less copper scrap strip and wire 355 kg @ Rs.400/-= Rs.218000/-
Insulation material cost ( 20 % of net copper conductor value)
labour cost (15% of new copper conductor value)
complete L.T. stud complete set brass with nut bolt
complete H.T. stud complete set brass with nut bolt
link copper patti
transporting charge to & fro
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.99 MB
BOQ_362506.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid