Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical . |
Tender Value
₹2.6 Cr
EMD Value
₹1 L
Closing Date
30 Jul 2026, 6:00 pmClosed
KSRRDA
3rd Floor, Revenue Complex, Public Office Compound, Vikas Bhavan P. O. Thiruvananthapuram, Kerala PIN-695033
PMGSY-III- 2021 - 2022 (Batch-1) Package No. KR0667 Chadayamangalam Block, Kollam District including Maintenance for Five years after construction. (Balance work Re-Tender)
2026_KSRD_148793_1
41/3414/2024-25/CE-KSRRDA1
Open Tender
Civil Works - Roads
Percentage
360 days
KSRRDA
Please refer Tender documents.
8 documents required · 8 mandatory
₹8,270
₹1 L
Yes
11 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
30 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MRL 10 - MRL08-MANJAPARA KUNDAYAM PULIMOOD AKKONAM KEEZHTHONNI ANAPARA MUKKADA PALAMON ROAD 4924 M | |||||
| 2CLEARING AND GRUBBING | |||||
| 2.01 | Clearing Grass and Removal of Rubbish - Clearing grass and removal of rubbish upto a distance of 30m outside the priphery of the area as per technical specification Clause 200.1 | 0.05 | Hectare | 24,774.85 | ₹1,337.84 |
| 3PAVEMENT COMPONENTS | |||||
| 3.01 | Boundary Piller- Reinforced cement concrete M15 grade boundary pillers of standard design as per IRC:8 fixing in position including painting and priming etc.as per drawing and technical Specification clause 1704 | 80 | each | 828.3 | ₹66,264 |
| 3.02 | Scarifying Existing Bituminous Surface to a depth of 150mm - by Mechanical Means - Scarifying the existing granular surafce to a depth of 150mm and disposal of scarified material with a lift upto 3m and lead upto 1000m as per technical specification Clause 301.4.1 | 2,868.1 | Sqm | 5.32 | ₹15,258.29 |
| 3.03 | Dismantling flexible Pavements- Dismantling of flexible Pavements and disposal of dismantled material upto a lead of 100m, stacking serviceable and unserviceable materials seperately by Mechanical means as per technical specification Clause 202.3 - Bituminous Courses | 140.36 | Cum | 283.74 | ₹39,825.75 |
| 3.04 | Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per technical specification Clause 302.3 | 0.8 | Cum | 31.45 | ₹25.13 |
| 3.05 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause | 0.8 | Cum | 44.89 | ₹35.91 |
| 3.06 | Granular Sub-base with well graded material (Table 400.1)-By Mix in Place Method- For Grading I material -Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC, and compacting with smooth wheel roller to achieve the desired density as per technical specification Clause 401 | 0.4 | Cum | 2,815.98 | ₹1,123.58 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
SBD41-KR0667.pdf
Tender Documents • 1.45 MB
BOQ_233984.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .