| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹1.5 L+₹13,072.45 (9.28%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹1.6 L+₹17,290.70 (12.3%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹1.7 L+₹27,803.12 (19.7%)Rejected-Finance | 4 | Rejected-Finance 4 | |
| 5 | 5₹2.0 L+₹57,351.01 (40.7%)Rejected-Finance | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | HARISH S L3 | JIJIL KUMAR R L4 | REJITH R C L1 | Anu M S L2 | ANEESH S P L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Retaining wall | ||||||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 34.5 | cum | 917.96 ₹31,669.62 | 979 ₹33,775.5 | 817.59 ₹28,206.86 Lowest | 893.47 ₹30,824.72 | 1,150.5 ₹39,692.25 |
| 1.00 | OD529422/2025-2026:DRY RUBBLE MASONRY with Departmental stone- hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 24.08 | cum | 2,779.19 ₹66,922.9 | 2,964 ₹71,373.12 | 2,475.33 ₹59,605.95 Lowest | 2,705.08 ₹65,138.33 | 3,559.4 ₹85,710.35 |
| 1.00 | OD529463/2025-2026:DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 10.92 | cum | 3,055.22 ₹33,363 | 3,258 ₹35,577.36 | 2,721.18 ₹29,715.29 Lowest | 2,973.74 ₹32,473.24 | 3,837.28 ₹41,903.1 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.88 | cum | 7,639.01 ₹14,323.14 | 8,148 ₹15,277.5 | 6,803.81 ₹12,757.14 Lowest | 7,435.3 ₹13,941.19 | 9,574.23 ₹17,951.68 |
| 1.00 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 121.88 | kilogram | 90.49 ₹11,028.47 | 96.5 ₹11,760.94 | 80.59 ₹9,821.91 Lowest | 88.07 ₹10,733.53 | 97.64 ₹11,899.88 |
| 1.01 | OD529552/2025-2026:Man coolie | 1 | no | 829.67 ₹829.67 | 884.8 ₹884.8 | 738.95 ₹738.95 Lowest | 807.54 ₹807.54 | 1,039.85 ₹1,039.85 |
Tender Value
₹2.1 L
EMD Value
₹5,271
Closing Date
20 Mar 2026, 5:00 pmClosed
AE LIDEW
AE LIDEW
buildings
2026_LSGD_846181_8
AE/LSGD/KTL/25-26
Open Tender
Civil Works - Buildings
Item Rate
189 days
Kottukal
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,271
Yes
23 May 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
Retaining wall
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
OD529422/2025-2026:DRY RUBBLE MASONRY with Departmental stone- hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
OD529463/2025-2026:DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric
OD529552/2025-2026:Man coolie
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1431846.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
compoundwallsbd.pdf
Tender Documents • 1.78 MB
BOQ_1431846.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .