Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance P 22 C I T ROAD 10TH FLOOR KOLKATA 700014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | ₹3.9 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.9 Cr+₹7.7 L (2.00%)Rejected-Finance D L ROY ROAD KRISHNAGAR NADIA | KRISHNAGAR | NADIA | WEST BENGAL | ₹3.9 Cr+₹7.7 L (2.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.0 Cr+₹11.6 L (3.00%)Rejected-Finance ACROPOLIS BUILDING OFFICE NO 16 7TH FLOOR 1858 1 RAJDANGA MAIN ROAD KOLKATA 700 107 | KOLKATA | KOLKATA | WEST BENGAL | 700107 | ₹4.0 Cr+₹11.6 L (3.00%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹7.7 L
Closing Date
9 Feb 2024, 2:00 pmClosed
SUPERINTENDING ENGINEER EASTERN CIRCLE PHE DTE
NIJALAY, PLOT NO. CN-8, SEC-V, SALT LAKE CITY, KOLKATA - 700091
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of capacity 174 m3/hr at Chapra Bangaljhi Water Supply Scheme within Chapra Block under Krishnagar Sub-Divn. under Nadia Division, P.H.E. Dte.
2024_PHED_643070_7
WBPHED/SE/EC/NIEQ-63/2023-24
Open Tender
CIVIL WORKS
Lump-sum
180 days
Chapra Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹7.7 L
31 Oct 2025
10 Jan 2024
12 Feb 2024
10 Jan 2024
9 Feb 2024
10 Jan 2024
Amount
Construction of Arsenic-cum-Iron Removal Plant (AIRP) to reduce Arsenic concentration to 10 ppb (0.01 mg/l) and Iron to 100 ppb (0.1 mg/l) from influent concentration upto 500 ppb (0.5 mg/l) and 3000 ppb (3 mg/1) respectively (single / multi-stage) based on oxidation followed by chemical co-precipitation, filtration etc. and departmental process/hydraulic design consisting of inlet arrangement, oxidation chamber (30 minute detention time), flash mixer, flocculation and sedimentation unit, filtration unit with Back washing arrangement (including the cost of 2 years polishing media where applicable) with air and water, back wash water tank of suitable capacity, and staging height, air compressors, blower etc, with or without activated alumina chamber all with pneumatic valve and control arrangements, clear water reservoir (30 minute detention time), Solid-liquid sludge separation bed with 100% recirculation facility, including the cost of all mechanical and electrical items (but excluding the cost of Raw water inlet pumps and clear water pumps), all accessories & RCC sludge storage tank etc, chemical house-cum-store, administrative building (with minimum 100 m2 plinth area), allied pipeline, integration of total plant etc. all complete showing all necessary arrangements, structural & hydraulic detail based on departmental drawing and specification with trial run for a period of 3 (three) months after completion of the works and 3 months maintenance after successful trial run including the cost of chemicals but excluding the cost of electricity charges.
Type-1 - Fully Gravity System with RG Filter — with baffled flocculator,plain sedimentation tank, rapid gravity filter, with or without gravity type activated alumina chamber all complete as per departmental drawing no. PC I/AIRP/Type-1/Sheet- 1 & 2.
Type-1 With Activated Alumina Polishing Unit of Capacity 174 Cum/Hr
Operation and Maintenance @5% per annum excluding cost of electricity but including the cost of all manpower, disinfectant and day to day maintenance [For 03 (three) years]
GST @18% on all the above items.
Labour Welfare Cess @1% on all the above items.
B.M. ENGINEERING & CONSTRUCTION
Harbauer India Pvt Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .