Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC KALADI GRAMA PANCHAYAT P O KADANCHERY 679 582 | MALAPPURAM | KERALA | 679582 | L1 | Accepted-AOC L1.Agreement executed | |
| 2 | L2₹7.3 L+₹58,694.96 (8.78%)Rejected-AOC | L2 | Rejected-AOC Rejected.Agreement executed withL1 |
Tender Value
Refer Docs
EMD Value
₹15,618
Closing Date
7 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer PWD Roads Ponnani
PWD Roads Sub Division Ponnan
SLTF 2019-20 Construction of CC drain from km.86/500 to 86/650 of Palakkad Ponnani Road in ponnani LAC in malappuram Dt
2020_PWD_402615_1
PWD/2020-2021/16306/PNN
Open Tender
Civil Works - Roads
Item Rate
120 days
ponnani
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,380
Yes
₹15,618
Yes
22 Feb 2021
28 Dec 2020
11 Jan 2021
28 Dec 2020
7 Jan 2021
28 Dec 2020
60 days
Amount
DETAILED ESTIMATE
12.1.5.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Marshyn Soil - Depth upto 3 m - Mechanical Means -<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means -
od30739/2019_2020 : Dry rubble masonry work for substructure complete as per drawing and technical Specification : Dry Rubble Masonry (Coursed/uncoursed) Taking output = 1 cum
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
od31084/2019_2020 : Engaging Labor
SUDEVAN T
Bidder Name
SUDEVAN T
ANEESH E V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_572595.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .