Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 247 DHAMPURA LAKSAR ROAD DISTT HARIDWAR 249408 UTTARAKHAND | HARIDWAR | HARIDWAR | UTTARAKHAND | 249408 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
7 Nov 2023, 5:00 pmClosed
Office of the Superintending Engineer
Office of the Superintending Engineer Electy Test AND Commissioning Circle 220KV Sub Station Campus, Ramnagar Roorkee (Uttarakhand)
Supply and installation of 02 Ton Split Air Conditioners at Test Lab under TANDC Division, Dehradun
2023_PTC21_64595_1
SETandC/PTCUL/T01/CCR/T23-24
Open Tender
Miscellaneous Works
Lump-sum
60 days
DEHRADUN
AS PER BID
4 documents required · 4 mandatory
₹295
Yes
Executive Engineer, T AND C Dehradun
₹9,500
Yes
30 Dec 2023
13 Oct 2023
10 Nov 2023
13 Oct 2023
7 Nov 2023
13 Oct 2023
Amount
Supply of Split Air Conditioner (Capacity - 2 Ton) comprising Copper Cooling tubes, Indoor Unit, Outdoor Unit and inter - connecting Insulation pipes with remote and accessories.
Intallation of Split Air Conditioner (Capacity - 2 Ton) along with material, labour and T&P required for the proper completion of work.
Work of Providing and Fixing 3KVA Automatic stablizer with copper winding for Split Air Conditioner (Capacity - 2 Tone) with complete cost of material, labour and T&P required for the proper completion of work.
Work of providing and laying Power Wiring for the successful installation of Split Air Conditioner (Capacity - 2 Tone) by providing ISI marked 2.5 sq.mm. copper wire for Phase, Neutral and earthing wire of best quality with appropriate MCB, power socket and three pin top plug along with seperate MCB Box for each Air Conditioner. Work includes the cost of all material, labour and T&P required for the proper completion of work.
(i) Work of Dismantlling the old and existing 1ɸ AC Distribution board by opening all the conections of existing lighting and Power Circuits. (ii) Work of Providing & Fixing 3- Phase AC Distribution Board of Best Quality (non corrossive material) comprising 3ɸ, 100A Isolator with corresponding MCBs of appropriate size i.e. 5A, 10A, 16A, 25A, 32A etc. for 05 No. Power circuit, 05 No. Lighting circuit for rooms, kitchen, bathrooms etc and 05 No. separate Power circuit for Air Conditioners. Work also includes bifuracting Power and Lighting Load Circuit in ACDB Board as per load condition at every Circuit, Work also includes Distrbution of Load by distributing the equal load at 3- Phase power supply including the cost of all material, labour and T&P required for the proper completion of work.
Note: GST shall be paid extra as per applicable government rules.
MAHAVEER TECHNO ENGINEERS
MAYANK ELECTRICAL WORK
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .