Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 LRejected-AOC | ₹2.5 L | L2 | Rejected-AOC L2 |
Tender Value
₹2.5 L
EMD Value
₹6,348
Closing Date
22 Jun 2026, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Special buildings subdivisionThrissur
GENERAL-Pre-Monsoon work 2026-2027 -Urgent cutting of dangerous trees and branches at Govt. Medical College Campus Thrissur.-General Civil work
2026_PWD_854010_2
08/AEE/SPL/2026-27
Open Tender
Civil Works - Buildings
180 days
Medical college Thrissur
Please refer Tender documents.
9 documents required · 9 mandatory
₹560
Yes
₹6,348
Yes
29 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A | |||||
| 1.001 | OD27613/2026-2027:Engaging wood cutter | - | each | 2,323 | - |
| 1.002 | OD27614/2026-2027:Hire and running charges of light crane | - | Day | 5,872.25 | - |
| 1.003 | OD27615/2026-2027:Engaging Coolie | - | Day | 1,082.18 | - |
| 1.004 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 377.65 | - |
| 1.005 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | 675.98 | - |
| 1.006 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 919.09 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1446702.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1446702.xls
BOQ • 0.31 MB
nit.pdf
Other Document • 0.02 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid