| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51,454.56Accepted-AOC | ₹51,454.56 | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹56,758.90Rejected-Finance | ₹56,758.90 | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | V DHAMODHARAN L2 | S . SAKTHIVEL L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all kinds of soils depositing on bank with initial lead and lift of 10 m 2m except sand or loose soil hard stiff clay, stiff block cottan soil and hard gravelly soil, SS20B | 15.5 | M3 | 199 ₹3,084.50 | 197 ₹3,053.50 |
| 2.00 | Plain cement concrete (1:4:8) mix using 40 mm ISS HBG Jelly including cost & conveyance of all material to site and all labours charges etc complete. | 0.25 | M3 | 5,599 ₹1,399.75 | 5,468 ₹1,367 |
| 3.00 | Centering for soffits of reinforced cement concrete slab on plan surfaces including cost & conveyance of all materials to site and all labours charges etc complete. | 11.35 | M2 | 499 ₹5,663.65 | 489 ₹5,550.15 |
| 4.00 | Plain cement concrete 1:2:4 mix Using 20 mm HBGs jelly to the required thickness camper and gradient and providing expansion joints with filler materials ramming, finishing the surface smooth and rough with float and brooming including curing the concrete for 24 hours immediately by covering with burlop and moistry the surface wet and forming edge bunds not less than5.00cm height in suitable intervals so as to form a pool of water not less than 2.50cm thick for atleast 14 days etc., | 0.85 | M3 | 7,025 ₹5,971.25 | 6,939 ₹5,898.15 |
| 5.00 | Providing Grono floorfinish 1:2:4 mix 25mm thick using 6-10mm Chips ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification. | 0.81 | M2 | 175 ₹141.75 | 146 ₹118.26 |
| 6.00 | Supply and Delivery of RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints including cost and conveyance of all materials to site and all labour charges for loading and unloading etc.,complete., | 30 | Rm | 1,235 ₹37,050 | 1,075 ₹32,250 |
| 7.00 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment including all labour charges etc.,complete., (WD-W0368) | 30 | Rm | 95 ₹2,850 | 90 ₹2,700 |
| 8.00 | Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification. | 11.5 | M3 | 52 ₹598 | 45 ₹517.50 |
Tender Value
₹62,000
EMD Value
₹1,240
Closing Date
20 Feb 2026, 3:00 pmClosed
Executive Officer Kannivadi Town Panchayat
Executive Officer Town Panchayat Office 117 Karur to Dharapuram Main Road Kannivadi and Post Chinnadharapuram Via Dharapuram Taluk Tiruppur District
Providing RCC PIPE Drainage at ward No 02,Orathuplayam North and Ward No 1 Kolthupudur east in Kannivadi Town Panchayat.
2026_DTP_659259_1
46/2025_4
Open Tender
Civil Works
90 days
Town Panchayat Office Kannivadi
As Per Tender Document
2 documents required · 2 mandatory
₹0
₹1,240
3 Mar 2026
17 Feb 2026
20 Feb 2026
17 Feb 2026
20 Feb 2026
17 Feb 2026
Earth work excavation for foundation in all kinds of soils depositing on bank with initial lead and lift of 10 m 2m except sand or loose soil hard stiff clay, stiff block cottan soil and hard gravelly soil, SS20B
Plain cement concrete (1:4:8) mix using 40 mm ISS HBG Jelly including cost & conveyance of all material to site and all labours charges etc complete.
Centering for soffits of reinforced cement concrete slab on plan surfaces including cost & conveyance of all materials to site and all labours charges etc complete.
Plain cement concrete 1:2:4 mix Using 20 mm HBGs jelly to the required thickness camper and gradient and providing expansion joints with filler materials ramming, finishing the surface smooth and rough with float and brooming including curing the concrete for 24 hours immediately by covering with burlop and moistry the surface wet and forming edge bunds not less than5.00cm height in suitable intervals so as to form a pool of water not less than 2.50cm thick for atleast 14 days etc.,
Providing Grono floorfinish 1:2:4 mix 25mm thick using 6-10mm Chips ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification.
Supply and Delivery of RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints including cost and conveyance of all materials to site and all labour charges for loading and unloading etc.,complete.,
Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment including all labour charges etc.,complete., (WD-W0368)
Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_790962.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid