| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC 5 DARSHANI GATE DEHRADUN PIN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹26.1 L Quoted ₹26.4 L | L1 | Accepted-AOC ok |
| 2 | L2₹26.5 L+₹15,898 (0.60%)Rejected-AOC 4578 STREET 15 15A AGGARWAL ROAD DARYAGANJ CENTRAL DELHI DELHI 110002 UDYAM DL 01 0031798 | CENTRAL DELHI | DELHI | 110002 | ₹26.5 L+₹15,898 (0.60%) | L2 | Rejected-AOC ok |
Tender Value
₹27.6 L
EMD Value
₹55,300
Closing Date
17 Mar 2022, 6:00 pmClosed
CWE Dehradun
HQ CWE Dehradun
COMPREHENSIVE MAINTENANCE OF AC PLANT AND ALLIED WORKS UNDER AGE E/M-II OF GE DEHRADUN
2021_MES_480388_4
9631/DDN/E8
Open Tender
Civil Works
Item Rate
334 days
Dehradun
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
GE Dehradun
₹55,300
Yes
31 Mar 2022
25 Feb 2022
19 Mar 2022
25 Feb 2022
17 Mar 2022
4 Mar 2022
Amount
Comprehensive maintenance by OEM or authorised service person once in each quarter including emergency visits during contract period as and when required for the diagnosis of trouble, adjustment, minor repair or re-setting of control as well as maintenance of central air conditioning plant chiller unit of capacity 3x150 TR and other connected installed machineries & accessories (screw type compressor 3x150TR (Make-M/s Trane) single stage 3000 rpm 415 volt AC 50 Hz, semi hermetically sealed motor of capacity 235 KW, Hot water generator 180 KW 2 Nos, 60 KW 1 No & pumping sets, condensing pumping sets 3 Nos, FRP cooling tower, mono block pump sets -3 Nos, Air handling units -34 Nos with belt driven motor, FCU 27 Nos, air blower fittings, shaft assembly cooling coil expansion valve water softening plant control panel LT panel Remote control panel of AHU's etc) with and including chemicals required for de scaling of condenser and chillers, compressor and connected motors etc completely cleaning, removing the dust particles, servicing, replacement of all minor parts (costing less than Rs 500/ each part) , greasing, oiling, changing of compressor oil, charging of refrigerant as per manufacturer's recommendation throughout contract period all required for the efficient, smooth & satisfactorily functioning as per manufacturer's instruction complete.
Notes:- (a) The tenderers shall have to submit the copy of MOU with OEM M/s Trane company through its authorized service provider as a proof to carry out annual/quarterly/preventive maintenance etc recommended by OEM immediately after commencement of work and strictly follow the company maintenance recommendations. The rates quoted shall deemed to include all such maintenance cost.
(b) The contractor shall submit the record of periodical /preventive /annual maintenance service carried out by M/s Trane along with recommendation of necessary repairs and maintenance procedure along with documentary evidence for claiming payment. The contractor shall produce the "purchase order" issued to M/s Trane/authorised service provider for Annual Maintenance.
(c) Contractors quoted rates shall be deemed to be inclusive of any miscellaneous minor spares such as wires, toggle switch, lugs, nuts, cable gland, connector, thimbles, gland packing etc when required or as ordered by Engr in Charge for smooth and uninterrupted operation of the complete system except spares such as mentioned here in after in relevant items of this schedule.
(d) The quoted rates shall includes yearly replacement of compressor oil and descaling etc (e) The quoted rates shall includes cleaning/washing filters at 34 AHUs and 27 FCUs every month complete all as directed by Engr in Charge failing which a of penalty @ Rs 10000/- per month will be charged.
(f) Yearly once Oil sample analysis of chiller compressor oil from Trane Factory for testing of oil parameters as mentioned in Trane chiller service manual. As per the oil analysis report replacement of Oil & Oil Filter for smooth and efficient working of compressor.
(g) In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost.
(h) The rates quoted shall include checking of ducting & grill for leakages and repair the same, loose fitting /tightening of ducting etc to reduce vibration & noise and gland packing of pumps etc. make up water tank /expansion tank of hot water circuit and chilled water circuit, installed at the roof of the plant room & various locations of hospital building.
Bi-monthly maintenance for two boilers of cap 600 Kg/Hr -This service will be performed at the start of the maintenance service term. All manufacturers’ recommended yearly maintenance procedures on the unit (s) will be conducted. (I) The inspection will be conducted on a mutually agreeable date (1 visit)
(II). Preventative Maintenance - This service provides for regularly scheduled preventative maintenance inspections as recommended by OEM including descaling if reqd.
(III). Written Reports - A report will be provided at the end of each inspection with recommendations of necessary repairs and maintenance procedures.
(IV). Emergency Service - Includes two breakup/emergency calls between inspections as required for the purpose of diagnosis of trouble, adjustment, minor repair, or resetting of controls.
(V). Annual Maintenance - Once a year a thorough maintenance procedure will be performed.
(VI) Preventative Maintenance - Regularly scheduled preventative maintenance inspection will include the following:
• Check the general operation of the unit.
• Log the operating temperatures, pressures, voltages, and amperages.
• Check the operation of the control circuit.
• Check the operation of the motor and starter.
• Analyse the recorded data. Compare the data to the original design conditions.
• Review operating procedures with operating personnel.
• Provide a written report of completed work, operation log and indicate any uncorrected deficiencies detected.
(VII). Written Reports - To be provided at the end of inspection with recommendations of necessary repairs and maintenance procedures.
Notes:- (a) The tenderers shall have to submit the copy of MOU with OEM M/s Thermax company through its authorized service provider as a proof to carry out annual/quarterly/preventive maintenance etc recommended by OEM immediately after commencement of work and strictly follow the company maintenance recommendations. The rates quoted shall be deem to include all such maintenance cost.
(b) The contractor shall submit the record of periodical /preventive /annual maintenance service carried out M/s Thermax company along with recommendation of necessary repairs and maintenance procedure along with documentary evidence for claiming payment. The contractor shall produce the "purchase order" issued to M/s Thermax company/authorised service provider for Annual Maintenance.
(c) Contractors quoted rates shall be deemed to be inclusive of any miscellaneous minor spares such as wires, toggle switch, lugs, nuts, cable gland, connector, thimbles, gland packing etc when required or as ordered by Engr in Charge for smooth and uninterrupted operation of the complete system except spares such as mentioned here in after in relevant items of this schedule.
(d) In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost.
Bi- monthly Maintenance for diesel fired hot water geyser of cap 300000 K Cal per hrs. - This service will be performed at the start of the maintenance service term. All manufacturers’ recommended yearly maintenance procedures on the unit(s) will be conducted. (i) The inspection will be conducted on a mutually agreeable date (1 visit)
II. Preventative Maintenance - This service provides for regularly scheduled preventative maintenance inspectionsas recommended by OEM. including descaling if reqd.
III. Written Reports - A report will be provided at the end of each inspection with recommendations of necessary repairs and maintenance procedures.
IV. Emergency Service - Includes two breakup/emergency calls between inspections as required for the purpose of diagnosis of trouble, adjustment, minor repair, or resetting of controls.
V. Annual Maintenance - Once a year a thorough maintenance procedure will be performed.
VI Preventative Maintenance - Regularly scheduled preventative maintenance inspection will include the following:
• Check the general operation of the unit.
• Log the operating temperatures, pressures, voltages, and amperages.
• Check the operation of the control circuit.
• Check the operation of the motor and starter.
• Analyse the recorded data. Compare the data to the original design conditions.
• Review operating procedures with operating personnel.
• Provide a written report of completed work, operation log and indicate any uncorrected deficiencies detected.
VII. Written Reports - To be provided at the end of inspection with recommendations of necessary repairs and maintenance procedures.
Notes:- (a) The tenderers shall have to submit the copy of MOU with OEM M/s Alfa Therm Limited through its authorized service provider as a proof to carry out annual/quarterly/prevantive maintenance etc recommended by OEM immediately after commencement of work and strictly follow the company maintenance recommendations. The rates quoted shall be deem to include all such maintenance cost.
(b) The contractor shall submit the record of periodical /preventive /annual maintenance service carried out M/s Alfa Therm Limited along with recommendation of necessary repairs and maintenance procedure alongwith documentary evidence for claiming payment. The contractor shall produce the "purchase order" issued to M/s Thermax company/auth service provider for Annual Maintenance.
(c) Contractors quoted rates shall be deemed to be inclusive of any miscellaneous minor spares such as wires, toggle switch, lugs, nuts, cable gland, connector, thimbles, gland packing etc when required or as ordered by Engr in Charge for smooth and uninterrupted operation of the complete system except spares such as mentioned here in after in relevant items of this schedule.
(d) In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost.
(d) The item rates include de scaling, cleaning/washing, overhauling of every two month complete all as directed by Engr in Charge failing which a penalty @ Rs 5000/- per two months will be charged.
(e) In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost.
S & F Digital temperature controller for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F transformer for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F fuel pump An 67C for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F photocell for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F electrode for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F sequence controller for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F nozzle for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F pressure gauge for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
S & F fuel pump AS 47 A/C for diesel fired burner for 3,00,000 Kcal/Hr as per existing make and size as per OEM recommendation.
M&L for spray painting of different sizes connecting pipes, valves, panels etc and its related items including writing letters etc at AC Plant as per colour code with one coat of primer and two coat of synthetic enameled paint after making the surface and removing existing paint all as specified and directed
Supplying laying fixing testing and commissioning of insulation of following sizes of chilled water piping inside the building with closed cell elastomeric nitrile rubber of insulation applied by adhesive confirming to standards specification complete all as specified and directed.
Supply & Fixing of following items for repair of FRP Cooling Towers :-
(a) Resin, Fiber with catalyst & Cobalt for repairing of leakage of FRP cooling tower.
(b) Replacement of 90 mm PVC nozzle
(c) MS angle for support of cooling tower (4x40x40mm)
(d) Replacement of galvinised iron mesh with PVC coating of thickness 2 mm and width 150 mm
(e) FRP louver
(f) MS sheet fan guard
M& L for replacement of damaged hot dip galvanised wire mesh around the cooling tower of cap 175 TR complete all as specified and directed.
M& L for replacement of damaged hot dip galvanised wire mesh around the cooling tower of cap 50 TR complete all as specified and directed.
Supply and fixing in replacement of Electronic temperature sensor suitable for Make Trane USA 1x160 TR R 134 type refrigerant AC plant including taking out of existing unserviceable sensor and testing and commissioning complete all as specified and directed.
S & F in replacement of cassette type PRE filter made out MS GI sheet and galvanized iron stainless steel/aluminium anodized SS 304, non woolen synthetic media HPDE media having efficiency 90% down to 10 micron complete of following sizes:-
(a) 485x461x25 mm
(b) 465x729x25 mm
(c) 585x439x25 mm
(d) 585x519x25 mm
(e) 585x549x25 mm
(f) 610x610x25 mm
(g) 610x305x50 mm
S & F in replacement Hepa filter of suitable size 1067x250x77 mm of AHU rated flow (CMH)=1700.IPD (mm WG) less than 25 and efficiency more than 99.97 down to 0.3 micron.
S & F in replacement fine filter of suitable size 610x305x305 mm of AHU rated flow (CMH)=1700.IPD (mm WG) less than 25 and efficiency more than 99% down 1 to 5 micron.
All as per item No 21.00 but size 610x610x305mm
Supply & fixing in replacement V belt (A section 13x8 mm & 'B' section 17x11 mm) of following size.
M & L for rewinding of electric motor of the following capacity, 3 phase 50 HZ 415 Volt with super enameled copper winding wire of suitable gauge including insulating material, varnishing, heating, etc and including dismantling, reassembling and re fixing after rewinding to its original location including testing and commissioning to its satisfactory results all as specified & directed.
(a) up to 2 HP
(b) 3 to 5 HP
M&L for changing of AC plant system from cooling to heating mode during winter season and shifting heating to cooling during summer as per direction of Eng-in-charge within seven days by draining out complete water from system washing the line min three times to remove impurities from line and refilling complete plant with soft water, checking system for leakage & arrest same duly testing and commissioning of the system complete all as directed.
Note:- a) Plant is to be filled with soft water only and same will tested after filling if found hardness above permissible limit no payment shall be made.
(b) Necessary chemical/additives required for the same except Nacl 35% are included in item rate.
(c) If breakdown will exceed beyond seven days proportional payment shall be deducted from item No 1&2. The decision of GE shall be final & binding in this respect.
M & L for overhauling/repairing to water softening plant including replacement of strainer-02 Nos, resin, inlet tank, ejector after draining out water and removing silt etc scrapping out rust/ algae and cleaning complete including connections of water inlet outlet etc and reassembling all the dismantled components and testing including commissioning complete to the entire satisfaction of EIC.
M&L for charging of refrigerant gas R-134(a) with required pressure including arresting of all leakage and testing on full load, gas charging, Nitrogen pressure test to find out leakage pressure testing & arresting of all leakage throughout the maintenance contract period will be measured and paid only once throughout contract period complete after repetitive leakage/topping all as specified and directed.
Supply & Fixing in replacement power contactor 3 pole type MO/MNX 50 415 volt, 32 Amps complete all as specified and directed.
Supply & Fixing in replacement power contactor 3 pole type MO/MNX 25 415 volt, 32 Amps complete all as specified and directed.
Supply & Fixing in replacement power contactor 3 pole type MO/MNX 9 with 415 volt 30 complete all as specified and directed.
Supply & Fixing in replacement power contactor 3 pole type MO/MNX 18 with 415 volt, 32 Amps complete all as specified and directed.
Supply and fixing of magnetic coil suitable for MO 25/MO18 or as per existing make suitable for 230/415 Volts AC supply operation complete all as specified and directed.
Supply and fixing of magnetic coil suitable for MNX 9 to MNX 40 or as per existing make suitable for 230/415 Volts AC supply operation complete all as specified and directed.
Supply and fixing of magnetic coil suitable for MNX 50 or as per existing make suitable for 230/415 Volts AC supply operation complete all as specified and directed.
Supply & Fixing in replacement auxiliary contactor 3 pole type MO TA 4 with a front add mounting complete all as specified and directed.
Supply & Fixing in replacement electronic timer 0-30 sec complete all as specified and directed.
Supply & fix in replacement power indicating led lamp with holder assembly (R,Y,B &W) 230 Volt AC complete all as specified and directed.
Supply and fix in replacement of LED ammeter 0-30/0-40/0-60 amp range square type 240 volt AC 50 hz complete all as specified and directed.
Supply and fix in replacement of LED Voltmeter 0-500 voltage range square type 240 volt AC 50 hz complete all as specified and directed.
Supply & fix in replacement over load relay range 14-23 amp, MN2 type. complete all as specified and directed.
All as per item No 40.00 but range of 9-15 Amp
All as per item No 40.00 but range of 20-33 Amp
All as per item No 40.00 but range 2-10 Amp.
Supply and fix in replacement of 8 pin relay mpc5 amp 220 volt AC complete all as specified and directed.
Supply and fix in replacement of Push button NO/NC contact as per existing type complete all as specified and directed.
Supply and fixing in replacement of HRC fuse 80A 120kA-500V as per IEC 60269-2 corrosion proof complete all as specified and directed.
Supply & fixing in replacement CI butterfly valve of dia 50mm, PN 1.6 conforming to IS 13095 with side handle operated complete including packing material complete all as specified and directed.
All as per Item No-47 above but 65 mm dia
All as per Item No-47 above but 125 mm dia
All as per Item No-47 above but 150 mm dia
S & F in replacement motorized valve 2 way/3 way 19 mm dia (DN20) any dia for chilled water pipe line with and including actuator motor complete and all other accessories required as per site requirement including testing and commissioning complete all as specified and directed.
All as per item No 51 above but 32 mm dia
All as per item No 51 above but 40 mm dia
All as per item No 51 above but 50 mm dia
M & L of actuators of motorized valve 2/3 way with replacement of any dia pipe for warm water pipe line complete all as specified and directed.
Supply and fix in replacement of NRV/Check valve 150mm, complete as per existing make size and type including packing material/gasket nut bolts etc complete all as specified and directed.
All as per item No 56.00 but size 125 mm
All as per item No 56.00 but size 80 mm
Supply & fixing in replacement balancing valve 32/40 mm as per existing type & size including packing material testing & commissioning complete all as specified and directed.
Supply & fixing in replacement balancing valve 50 mm as per existing type & size including packing material testing & commissioning complete all as specified and directed.
Supply & fixing in replacement balancing valve 80 mm as per existing type & size including packing material testing & commissioning complete all as specified and directed.
Supply & fixing in replacement balancing valve 125 mm as per existing type & size including packing material testing & commissioning complete all as specified and directed.
Supply & fixing in replacement industrial type alcohol filled thermometer 0-50 degree as per existing make & size and type complete all as specified and directed.
Supply & Fix in replacement three phase heating element of capacity 14 to 16 KW for hot water generator complete all as specified and directed.
All as per item No 64 here and above but 6 to 7.5 KW.
Supply and fixing in replacement of PVC cooling fins size of 150x300x600mm in bluish shedding having thickness 0.2 mm and in hexagonal shape for suitable mihir cooling tower of central type AC plant complete all as specified and directed.
S & F in replacement water flow switch WF S6000 150 PSI 100 C NPT 15 Amp 250 Volt complete all as specified and directed.
S & F in replacement PVC float valve assembly 20mm dia including fitting complete all as specified and directed.
S & F in replacement pressure gauge round type of 10 cm dia metal cased between pressure range 0-7 Kg/sqcm including siphon assembly with gun metal stop valve including knob complete all as specified and as directed.
Supply only cleaned salt not less than 35% Nacl for softening of water as per sample all as specified and as directed.
Supply & fixing in replacement automatic air release valve including testing /commissioning complete all as specified and directed.
M&L for replacement of compressor in repair including taking out after disconnecting the electrical and refrigerant connection of defective sealed unit of walk in cooler cold room and replacing the compressor and connecting the sealed unit both electrical and refrigerant connections including charging of refrigerant gas as required complete all as specified & directed. Notes :- (i) Gas shall be measured and paid separately
Supply and replacing filter drier for walk in cooler cold room complete all as specified and directed.
M&L for charging of refrigerant gas R-22 with required pressure including arresting of all leakage and testing on full load, gas charging, Nitrogen pressure test to find out leakage pressure testing & arresting of all leakage throughout the maintenance contract period will be measured and paid only once throughout contract period complete after repetitive leakage/topping all as specified and directed.
S&F in replacement of pre-fine blower filter 10-20 Micron of size 540x640x50mm as per existing make & size complete all as specified and directed.
S&F in replacement of fine blower filter 5 Micron of as per existing size and make 610x610x150mm, complete all as specified & directed.
Supply in replacement of air strip heater 3 KW finned type suitable for AC Plants complete all as specified & directed.
M/s Kamal Traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .