Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC LSGD PANDALAM BLOCK PANCHAYATH KULANADA P O | ALAPPUZHA | KERALA | 686102 | ₹1.4 Cr | 1 | Accepted-AOC 01 |
| 2 | 2₹1.4 Cr+₹5.5 L (3.99%)Rejected-Finance | ₹1.4 Cr+₹5.5 L (3.99%) | 2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | BABILU L2 | PRABHA.M.V L1 |
|---|---|---|---|---|---|
| 1.00SHOPPING COMPLEX BUILDING | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 500.04 | cum | 360.79 ₹1,80,410.87 | 330.78 ₹1,65,404.55 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 70.78 | cum | 133.74 ₹9,466.25 | 121.72 ₹8,615.46 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 89.66 | cum | 7,899.4 ₹7,08,276 | 7,797.36 ₹6,99,126.89 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 28.55 | cum | 12,395.99 ₹3,53,843.53 | 10,394.9 ₹2,96,722.42 Lowest |
| 1.00 | OD501745/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. .All work upto plinth level | 19.1 | cum | 12,770.68 ₹2,43,971.07 | 10,770.66 ₹2,05,762.69 Lowest |
| 1.01 | OD462080/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. All work upto plinth level | 44.88 | cum | 10,888.69 ₹4,88,706.18 | 10,863.66 ₹4,87,582.79 Lowest |
| 1.01 | OD381383/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. .All work above plinth level upto floor V level | 22.09 | cum | 12,780.89 ₹2,82,342.64 | 12,769.84 ₹2,82,098.54 Lowest |
| 1.01 | OD501714/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. .All work above plinth level upto floor V level | 87.34 | cum | 12,670.99 ₹11,06,734.95 | 12,660.96 ₹11,05,858.89 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 26,939.41 | kilogram | 122.5 ₹33,00,077.73 | 112.48 ₹30,30,144.84 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
10 Jul 2025, 2:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER ELANTHOOR GP
Project No 91 Elanthoor Grama Panchayath Construction of Shopping Complex in Elanthoor Grama Panchayath Phase I
2025_LSGD_773362_1
1/AE/LIDEW/ELTR/91
Open Tender
Civil Works - Buildings
Item Rate
120 days
ELANTHOOR
Please refer Tender documents.
11 documents required · 11 mandatory
₹6,508
Yes
₹50,000
Yes
19 Nov 2025
1 Jul 2025
11 Jul 2025
1 Jul 2025
10 Jul 2025
1 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_1262929.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .