Dy.Minicipal Commissioner - West Zone
Construction of Ganesh Kund Near Ahavadiya Lake and other places of Ranip Ward In west zone. (Re-Tender)
336993
2/26-27 (T.N.16)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹12,280
20 Aug 2026
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.12280.00)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs.900.00
6. Time-Limit 1 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “E-2” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
10 Date of Opening Dt.02-09-2026, 15:00 PM
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
11. hours: On date: 02-09-2026 &12:00 pm West Zone, 2nd Floor,
Tender A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura.Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
12 Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
13 Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
Time permitted to start parts of
14 to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract
fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
he works without proper precautions/safety measures as
equired will attract a fine of Rs. 5,000/- for each incident.
16 Defect &Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards
the expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the
certified date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period
shall be 12 months from the certified date of completion which
should include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
17 Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether minor
work or major of part thereof of any amount, the contractor shall be
bound to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in 48 hours of
intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above
Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of
last notice of penalty.
18 Compensation for Delay 10% of Remaining work (As per Circular)
19 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The Tender
20 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Addl.C.E.(west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
(WEST ZONE) TENDER FORM
Name of Work :- Construction of Ganesh Kund Near Ahavadiya Lake and other places of Ranip
Ward In west zone. (Re-Tender)
It.No. Description Rate Per
Excavation for foundation up to1.5 m depth
including sorting out and stacking of useful
materials and disposing of theexcavated
stuff upto 50 Meter lead.(A) Loose or soft
soil (Sor Year 2023-24. Item No. 04001A)
1.5 to 3.0 mt.depth (Sor Year 2023-24. Item
Conveyance charge of lime murrum building
rubbish earth manure or sludge & execavated
1,570.00 rock and rubbish [Earth]. Upto 0.5 Km Lead 303.69
(Sor Year 2023-24.Item No. 030201A2)
Rent for provide j.c.b Machine for Refilling
Work and Levelling the site as Directed.Rate
also includes all necessary Operating like
40.00 Diesel, tools and Driver expences etc. comp. ( 600.00
Based on Previously approved rate by C E sir
Providing and supplying of labour for
necessary manual excavation, cleaning,
4 Shifting of Material Or any other, or for any
other work as directed by Engineer In charge.
The Rate includes Handcart with Mazdoor
Labour charges - Mazdoor (Male) (Day/Night)
115.00 (Sor Year 2023-24.Item No. L022) 493.00
Labour charges - Supervision for Machinery
10.00 (Sor Year 2023-24.Item No. L029) 711.00
Providing arrengement for double layer
Baricating for protection of site avoid accident
110.00 by using bericating rolls, bamboo, teka , kathi 395.00
with all labours etc. Comp.
Providing and laying cement
concrete1:4:8 (1-Cement: 4- coarses
and:8-hand broken stone aggregates 40mm
nominal size) and curing complete
excluding cost of formworkin (A) Foundation
and Plinth (upto 10 ton). (Sor Year 2023-
24.Item No. 05004A)
P/F good qualitity HDPE plastic cover of
requried size by jointing the pices of cover by
special sewing & using chemical adhesvies to
990.00 retain water in kund. Rate also incl. labour 250.00
work for setting cover in situ. ( Approved Rate
Providing and fixing of 2mm Aluminium/4mm
ACP sheeting fixed with Type-4 Class B High
Intensity Grade Sheeting as per IRC 67:2012
reflective sheeting of size including lettering
and signs as applicable.
Providing and operation dewatering Pump
including fuel charges & operator Charges etc.
as directed etc. comp. (Shift for Eight Hour)
(For Each Pump Set, No payment should be
allowed for non working condition of
machinery ) ( Based on Previously approved
rate by C E sir )
Supplying 5000 liters capacity Portable water
tanker for 8 hours per day (net 8 hours) of
100.00 AMC Central Zone as & when req.by 450.00
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
AHMEDABAD MUNICIPAL CORPORATION ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work :- Construction of Ganesh Kund Near Ahavadiya Lake and other places of Ranip
Ward In west zone. (Re-Tender)
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
NAME OF WORK :- “Constructing Ganesh Visarjan kund behind NID in Paldi Ward West Zone”
Item No 1 Excavation for foundation upto1.5m depth including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (A)Loose or soft soil
Excavationforfoundationupto1.5m depth including sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead. (A)Loose or soft soil. The Work Should be done as per instruction of Engg.Incharge.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such ordinary excavating
implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this category. For materials and
workmanship for earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose stones,
materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed. The materials so
obtained shall be the property of the Client and shall be conveyed and stacked as directed, within 50-m. lead.
The roots of the trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority / Municipal
Commissioner, before cutting shall be cut after obtaining such permission from them. It shall be the Client's
responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be given by the Engineer-
in-charge. The Contractor shall assume full responsibility for alignment, elevation and dimension of each and
all parts of the work. Contractor shall supply labours, materials, etc. required for setting out the reference
marks and bench marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as shown in the
drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost.
No extra payment shall be made for such precautionary measures, taken.
The bottom of the excavated area shall be leveled both longitudinally and transversely, as directed, by
removing excess soil and watering, as required. No earth filling will be allowed for bringing it to level, if by
mistake or any other reason, excavation is made deeper or wider than shown on the drawings or as directed.
The extra depth or width shall be made up with sand filling, as specified for the bottom level of the subsequent
finishing at the cost of the Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all utility
services, lighting the excavated areas, separating and stacking serviceable materials neatly, shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the work.
Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in progress
and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever required
inlayers, including ramming and watering, ensuring proper compaction etc. complete. The Contractor shall
remove the balance of the excavated quantity from the site of work, to a place, as directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The decision of Engineer-
In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown on the
drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to stepping and sloping back as found necessary, on
account of conditions of soil and requirements of safety. The rate shall include for clearing the site, surface
dressing, making layout for road, fixing permanent grid points with MS iron posts, embedded in C.C. 1:2:4,
placed sufficiently away from the existing traffic lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of the excavated
area, pumping out rain or surface water at any stage of construction so as to keep the excavated area dry, to
the satisfaction of the /Engineer-in-charge. The rate shall include leveling and ramming the bottoms of
excavations to receive concrete, etc. including trimming to slope wherever necessary etc. complete. In filling
clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall be paid.
Consolidation to be done by mechanical compactor as per relevant item. The rate shall be for a unit of one m3.
Item No 1(A) Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful
materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil. The Work Should be done as per instruction of
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such ordinary excavating
implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this category. For materials and
workmanship for earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose stones,
materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed. The materials so
obtained shall be the property of the Client and shall be conveyed and stacked as directed, within 50-m. lead.
The roots of the trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority / Municipal
Commissioner, before cutting shall be cut after obtaining such permission from them. It shall be the Client's
responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be given by the Engineer-
in-charge. The Contractor shall assume full responsibility for alignment, elevation and dimension of each and
all parts of the work. Contractor shall supply labours, materials, etc. required for setting out the reference
marks and bench marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as shown in the
drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost.
No extra payment shall be made for such precautionary measures, taken.
The bottom of the excavated area shall be leveled both longitudinally and transversely, as directed, by
removing excess soil and watering, as required. No earth filling will be allowed for bringing it to level, if by
mistake or any other reason, excavation is made deeper or wider than shown on the drawings or as directed.
The extra depth or width shall be made up with sand filling, as specified for the bottom level of the subsequent
finishing at the cost of the Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all utility
services, lighting the excavated areas, separating and stacking serviceable materials neatly, shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the work.
Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in progress
and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever required
inlayers, including ramming and watering, ensuring proper compaction etc. complete. The Contractor shall
remove the balance of the excavated quantity from the site of work, to a place, as directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The decision of Engineer-
In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown on the
drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to stepping and sloping back as found necessary, on
account of conditions of soil and requirements of safety. The rate shall include for clearing the site, surface
dressing, making layout for road, fixing permanent grid points with MS iron posts, embedded in C.C. 1:2:4,
placed sufficiently away from the existing traffic lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of the excavated
area, pumping out rain or surface water at any stage of construction so as to keep the excavated area dry, to
the satisfaction of the /Engineer-in-charge. The rate shall include leveling and ramming the bottoms of
excavations to receive concrete, etc. including trimming to slope wherever necessary etc. complete. In filling
clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall be paid.
Consolidation to be done by mechanical compactor as per relevant item. The rate shall be for a unit of one m3.
Item No 2 Conveyance charge of earth ,lime, murrum, building rubbish,manual garbage, sludge, excavated
rock ,fly ash, aggregate of any kind etc. comp.up to 5.0 Km. lead.
All the surplus earth & debris remaining on site after sufficient watering shall be carried away immediately
from site of work. to the place within 5 km. distance as directed by the Engineer in charge, so as not to cause
any inconvenience to the public or traffic.
If the instructions of Engineer in charge of work are not followed within 7 days from the site, the work shall be
carried out by the Municipal Corporation at the risk & cost of the contractor & any claim dispute will not be
entertained in the respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be
carried out by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth
after the trenches we will watered and refilled with the sand. The rate of carting including carting of brick bats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
Mode of measurement shall be for Cmt. Basis
Item No.3 Rent for providing JCB Machine for refilling work and levelling the site as directed. Rate also
includes all necessary operating like diesel, tools and driver expences etc. comp.
Rent for providing JCB Machine for refilling work and levelling the site as directed. Rate also includes all
necessary operating like diesel, tools and driver expences etc. comp.The Work Should be done as per
instruction of Engg.Incharge. The rate shall be for a unit of one Hr. basis.
Item No 4 Supplying ,labour for excavation of all types of soil, levelling work and Security Work to avoid an
accident during Visarjan by pilgrims etc. comp.
Supplying ,labour for excavation of all types of soil, levelling work and Security Work to avoid an accident
during Visarjan by pilgrims etc. comp.The Work Should be done as per instruction of Engg.incharge. For
detailed specification refer A.R.C.
Mode of measurement: The rate shall be for a unit of no basis
Item No 5 Providing arrengement for double layer berricating for protection of site avoid accident by using
bericating rolls, bamboo, teka , kathi with all labours etc. Comp.
Providing arrengement for double layer berricating for protection of site avoid accident by using bericating rolls,
bamboo, teka , kathi with all labours etc. Comp. The Work Should be done as per instruction of Engg.incharge
Mode of measurement: The rate shall be for a unit of rmt basis
Item No 6 & 7 : Brick pitching work using common bumt clay bulding bricks having crushing strength not less
than 35 kg/sq cm in foundation and plinth in & Extra Over Item for Cement Slurry Over Brick
Brick pitching work using common bumt clay bulding bricks having crushing strength not less than 35 kg/sq
cm in foundation and plinth in & Extra Over Item for Cement Slurry Over Brick Pitching.The Work Should be
done as per instruction of Engg.incharge
For detailed specification refer R.A.
Mode of measurement: The rate shall be for a unit of smt basis
Item No 8 : P/F good qualitity HDPE plastic cover of requried size by jointing the pices of cover by special sewing
& using chemical adhesvies to retain water in kund. Rate also incl. labour work for setting cover in
P/F good qualitity HDPE plastic cover of requried size by jointing the pices of cover by special sewing &
using chemical adhesvies to retain water in kund. Rate also incl. labour work for setting cover in situ. The
Work Should be done as per instruction of Engg.incharge
For detailed specification refer R.A.
Mode of measurement: The rate shall be for a unit of smt basis
Item No 9 Making necessary diversion board as per trafic requirment of size 0.90X0.60 with radium coloue etc
Making necessary diversion board as per trafic requirment of size 0.90X0.60 with radium coloue etc comp.
The Work Should be done as per instruction of Engg.incharge.
For detailed specification refer R.A.
Mode of measurement: The rate shall be for a unit of No basis
Item No 10 Supplying 5000 liters capacity Portable water tanker for 8 hours per day (net 8 hours) of AMC West
Zone as & when req.by Eng.incharge.
Supplying 5000 liters capacity Portable water tanker for 8 hours per day (net 8 hours) of AMC West Zone
as & when req.by Eng.incharge.The Work Should be done as per instruction of Engg.incharge.
As per site engineer Mode of measurement:
Mode of measurement: The rate shall be for a unit of trip basis
Item No 11 Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed
etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working
condition of machinery )
Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working
condition of machinery )The Work Should be done as per instruction of Engg.incharge.
Mode of measurement: The rate shall be for a unit of Shift basis
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Conctractor's Signature Additional City Engineer
Address & Mobile no. ( West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth
rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf: LED/WRT/e-file/11/2024/0293/M2
Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 16.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].