Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.6 LAccepted-AOC | ₹49.6 L | L1 | Accepted-AOC Accepted as L1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical non responsive |
| 3 | Rejected-Technical G K TOWER BHARALUMUKH GUWAHATI DIST KAMRUP METRO ASSAM PIN 781009 | KAMRUP METRO | ASSAM | 781009 | - | - | Rejected-Technical non responsive |
| Sl No | Description | Qty | Unit | NILIMA ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00Cultivation of Napier Unit | ||||
| 1.01 | Installation of Barbed Wire Goat Proof Fencing per Bigha of land | 142 | Nos | 11,012.71 ₹18,45,290 Lowest |
| 1.02 | Cost of Land Preparation | 142 | Nos | 2,542.37 ₹4,26,000 Lowest |
| 1.03 | Provision of Irrigation | 142 | Nos | 847.46 ₹1,42,000 Lowest |
| 1.04 | Cost of Farm Yeard Manure (FYM) / Manure (6 Thela per Bigha) | 142 | Nos | 1,525.42 ₹2,55,600 Lowest |
| 1.05 | Cost of Rooted Slips with double Node (4000 Nos per Bigha) | 142 | Nos | 5,084.75 ₹8,52,000 Lowest |
| 1.06 | Cost of Biofertilizer 200 grms per Bigha | 142 | Nos | 5.93 ₹994 Lowest |
| 1.07 | Cost of SSP 44 kg per Bigha | 142 | Nos | 436.44 ₹73,130 Lowest |
| 1.08 | Cost of MOP 7 Kg per Bigha | 142 | Nos | 194.92 ₹32,660 Lowest |
| 1.09 | Cost for Intercultural Operation | 142 | Nos | 1,271.19 ₹2,13,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
8 Jan 2025, 2:30 pmClosed
Managing Director, ALPCO, Khanapara, Guwahati-
O/O Managing Director, ALPCO, Khanapara, Guwahati-22
Preparation cultivation andHarvesting of Napier Fodder Units in 17 Departmental Farms of AH and Veterinary Department of Assam
2024_AHVD_41424_1
ALPCO/E/07/2024/24-25
Open Tender
Supply/Erection/Commissioning Services
Turn-key
17 departemntal farms of AHVD Assam
BID Doc
3 documents required · 3 mandatory
₹3,000
₹1 L
O/O Managing Director, ALPCO, Khanapara, Guwahati-
8 Apr 2026
18 Dec 2024
8 Jan 2025
18 Dec 2024
8 Jan 2025
30 Dec 2024
24 Dec 2024 - 29 Dec 2024
23 Dec 2024
Amount
Cultivation of Napier Unit
Installation of Barbed Wire Goat Proof Fencing per Bigha of land
Cost of Land Preparation
Provision of Irrigation
Cost of Farm Yeard Manure (FYM) / Manure (6 Thela per Bigha)
Cost of Rooted Slips with double Node (4000 Nos per Bigha)
Cost of Biofertilizer 200 grms per Bigha
Cost of SSP 44 kg per Bigha
Cost of MOP 7 Kg per Bigha
Cost for Intercultural Operation
Cost for Harvesting
Cost of Post harvest operation
Cost of Tools/Implements/utensils
Misc. Cost
stage.html
html • 0.05 MB
technical_66719.pdf
techsummary_66719.pdf
finance_66719.pdf
BOQ Comparative Chart
xlsx
finsummary_66719.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Napier2.pdf
Tender Documents • 0.61 MB
BOQ_66719.xls
BOQ • 0.28 MB
NIT.pdf
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .