Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
19 Apr 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
FBI Division Tangmarg
Stage Contract for Restoration works in case of emergencies Urgencies during and after Floods etc if any on Ferozpora nallah under the Jurisdiction of Tail Race Sun Division Kunzer
2021_IFC_122174_1
enit no.02 2021-22 of FBI Division Tangmarg
Open Tender
Civil Works
Item Rate
345 days
Tangmarg
As per nit
3 documents required · 3 mandatory
₹500
Yes
Executive Engineer FBI Division Tangmarg
Yes
20 Apr 2021
10 Apr 2021
20 Apr 2021
10 Apr 2021
19 Apr 2021
11 Apr 2021
90 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.
Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth.
Deduct for not watering the excavated earth for banking.
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material: All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Hand-packing boulders in wire-crates; excluding cost of crates and boulders
Supply of black annealed wire crate mesh 4"X4"/ lids made out of 4.00mm dia B.A (wire as per IS 280) machine woven both ends bent confirming to relevent IS specifation Size 16'X16'
Dumping stone excluding cost of boulders In Horizontal on level
Supply of boulders excluding carriage and head load.
Labour charges for Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags (percft)
Labour charges for Filling Mega bags with sand/ earth; including cost of sewing and strings; excluding cost of bags (28.0 cft capacity )
Labour charges for Filling normal Geo bags with sand/ earth; including cost of sewing and strings; excluding cost of bags (2.62 cft capacity)
Supply of earth or sand to be filled in EC/Mega/Geo bags including excavation and all kinds of carriages etc complete job
Dry stone pitching (any thickness) excluding cost of stones.On Horizontal
Dry stone pitching (any thickness) excluding cost of stones.On Slopes
Opening out old wire crates those and re-binding after filling.
Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m.
Placing in dry
Placing in Water
Loading/Unloading sand/ earth filled Mega bags in lorries; lead upto 50m.
Placing in dry
Placing in Water
Loading/Unloading sand/ earth filled Geo bags in lorries; lead upto 50m.
Placing in dry
Placing in Water
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry
Nallah
Dry random rubble masonry with hard stone in foundation and plinth: Quarry
Nallah
Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered): Depth not exceeding 1.5 m.
Depth exceeding 1.5 m but not exceeding 3 m
Depth exceeding 3m but not exceeding 4.5m
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
Engagement of labour / Beldar, Mazdoor
Fitter
Blacksmith IInd Class
Mason
Carpenter
Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job (running charges )
Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job (idle charges )
Hire charges of Chain Mounted Earth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job (Runing charges )
Hire charges of Chain Mounted Earth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job(idle charges)
Hire charges of Tippers including fuel, driver etc (runing charges)
Hire charges of Tippers including fuel, driver etc (idel Charges )
Hire charges of Tractors including fuel, driver etc complete job (Runing charges)
Hire charges of Tractors including fuel, driver etc complete job (Idel Charges)
Hire charges of Cab including fuel, driver etc
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30cm girth upto and including 60cm girth.
Beyond 60cm girth upto and including 120cm girth
Beyond 120cm girth upto and including 240 cm girth
Above 240 cm girth
Providing and Laying PVC Polythene of special quality as per the directions of engineer incharge
Providing and Laying PVC Pipe Of approved brand and quality 250 mm
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600mm
Carraige of materials by Mechanical transport Earth upto 1 km including loading unloading and stacking
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km for every additional Km
Crates upto 1 km
Beyond 5 Km upto 10 km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Stone upto 1 km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
EC Bags /upto 1 kms
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
Geo Bags / Mega Bags upto 1 kms
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
40 mm Agregrate /Km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
20 mm Agregrate /Sand 1 Km
Beyond 5 Km upto 10 km /km
Beyond 10 Km upto 20 km /km
Beyond 20 km /every additional Km
R.C.C spun pipes/DI pipes 600 mm for 1 kms
Beyond 5 km upto 10 km per km
Beyond 10 km upto 20 km per km
Beyond 20 km per additional km
450 mm up to 1 km
Beyond 5 km upto 10 km per km
Beyond 10 km upto 20 km per km
Beyond 20 km per additional km
300 mm up to 1 km
Beyond 5 km upto 10 km per km
Beyond 10 km upto 20 km per km
Beyond 20 km per additional km
250 mm up to 1 km
Beyond 5 km upto 10 km per km
Beyond 10 km upto 20 km per km
Beyond 20 km per additional km
Carriage of material by manual means by labours/poines including loading unloading and stacking Earth for first 50 mtrs.
for every additional 50 mtrs
Crates for first 50 mtrs.
for every additional 50 mtrs
Boulders for first 50 mtrs.
for every additional 50 mtrs
EC Bags for first 50 mtrs.
for every additional 50 mtrs
R.C.C spun pipes/DI pipe First 50 metres 600mm
Additional (50 metres) 600mm
Stone For First 50 Mtrs
for every additional 50 mtrs
Sand For First 50 Mtrs
for every additional 50 mtrs
Slip clearance from Canals inclusive of initial lead and lift 50 mtr and 1.5 mtr respectively Dry
Slip clearance in ordinary soil disposal lead up to 50mtrs and lift up to 1.5mtr
Slip clearance in soil mixed with moorum Kankar Shingle /boulder disposal lead up to 50 mtrs and lift up to 1.5 mts
Greasing for gates / gearings and other mechanical components
Oiling for gates / gearings and other mechnical components
M/S GHULAM HASSAN RATHER
ALI MOHD THOKAR
GH MOHI UD DIN RESHIE
stage.html
html • 0.02 MB
finance_236001.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .