Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC AT PO G TUMULIA DIST SUNDERGARH ORISSA PIN 770024 | G TUMULIA | SUNDERGARH | ORISSA | 770024 | ₹1.5 Cr | L1 | Accepted-AOC Being L1 Bidder |
| 2 | L2₹1.6 Cr+₹1.2 L (0.77%)Rejected-Finance AT GOPALPUR PO TIKILIPARA PS HEMGIR DIST SUNDARGARH PIN 770076 | HEMGIR | SUNDARGARH | ODISHA | 770076 | ₹1.6 Cr+₹1.2 L (0.77%) | L2 | Rejected-Finance Not Being L1 Bidder |
| 3 | L3₹2.0 Cr+₹44.2 L (28.5%)Rejected-Finance GANGAPUR UMRER DIST NAGPUR 441203 | UMRER | NAGPUR | MAHARASHTRA | 441203 | ₹2.0 Cr+₹44.2 L (28.5%) | L3 | Rejected-Finance Not Being L1 Bidder |
Tender Value
₹2.1 Cr
EMD Value
₹2.6 L
Closing Date
25 May 2026, 5:00 pmClosed
Staff officer(Civil), Mahalaxmi Area
GM OFFICE, MAHALAXMI AREA, AT/PO-BASUNDHARA, DIST-SUNDARGARH (ODISHA) PIN-770076
Construction of 3 nos of Weigh Bridge with Ramp and Cabin Platform and Peripheral Drain at Siarmal OCP under Mahalaxmi Area.
2026_MCL_359080_1
MCL/GM/MLA/C/e-Tender/26-27/09 dt.05/05/2026
Open Tender
Civil Works - Others
Percentage
90 days
GM OFFICE, MAHALAXMI AREA, AT/PO-BASUNDHARA, DIST-
PLEASE REFER TENDER DETAILS
5 documents required · 5 mandatory
₹2.6 L
12 Sept 2026
7 May 2026
26 May 2026
7 May 2026
25 May 2026
8 May 2026
7 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | RAMP - Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.:All kinds of soil. | 233.1 | cum | 217 | ₹50,582.7 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 28.98 | cum | 910.15 | ₹26,376.15 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 96.48 | cum | 5,219.9 | ₹5,03,615.95 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 459.99 | cum | 7,009.05 | ₹32,24,092.91 |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 45,999 | kg | 101.4 | ₹46,64,298.6 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for.Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,459.8 | sqm | 587.6 | ₹8,57,778.48 |
| 1.07 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 146.12 | kg | 124 | ₹18,118.88 |
| 1.08 | Embankment Construction with Material Obtained from Borrow Pits (Construction of
embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet
requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) | 708.09 | cum | 268 | ₹1,89,768.12 |
| 1.09 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 230.77 | cum | 115.2 | ₹26,584.7 |
| 1.1 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | 375 | sqm | 114.65 | ₹42,993.75 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 20.33 MB
Tendernotice_2.pdf
PDF • 0.88 MB
Tendernotice_3.pdf
PDF • 1.40 MB
BOQ_371946.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .