Tender Value
₹8.9 L
EMD Value
₹8,900
Closing Date
1 Jul 2026, 4:30 pm
EE OFFICE - PARVATHIPURAM
Parvathipuram
Maintenance of Corenet Roads in (R&B) Section, Elwinpeta for the year 2026 - 2027 in Parvathipuram Manyam District.
946976
NIT No 02/EE/R&B/PVP/2026-27 Dated: 05-06-2026
OPEN - NCB
Road Work
PARVATHIPURAM MANYAM
8 documents required · 8 mandatory
₹315
₹8,900
13 Jun 2026
13 Jun 2026
13 Jun 2026
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Clearing and grubbing road land including uprooting rank vegitation, grass, bushes,shurbs,saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of un serviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness for light jungle conforming to MoSRT & H Clause 201 for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the berms / shoulders (or) making up of loss of material / irrigularities on the shoulders designed level by adding fresh approved soil and compacting with appropriate equipment and labour charges for all operations and all incidental charges etc., complete as directed by the Engineer -in- Charge of the work for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
Providing B.T Patch work for Pot Holes of depth ranging from 50mm to 70mm and above, using 40mm HBG metal with required quantity of 10-12 mm HBG machine crushed key chips and using 80/100 grade Bitumen at 42 kgs/1cum of work for filling the pot holes and cealing the filled up pot hole with a 15mm thick layer using 10-12mm size HBG crushed chips and 80/100 grade Bitumen at 72 Kgs/ 1 Cum, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand and including cost,seigniorage,conveyance of all material and labour charges for all operations etc, complete. for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Providing B.T Patch work for Pot Holes of depth ranging from 50mm to 70mm and above, using 40mm HBG metal with required quantity of 10-12 mm HBG machine crushed key chips and using 80/100 grade Bitumen at 42 kgs/1cum of work for filling the pot holes and cealing the filled up pot hole with a 15mm thick layer using 10-12mm size HBG crushed chips and 80/100 grade Bitumen at 72 Kgs/ 1 Cum, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand and including cost,seigniorage,conveyance of all material and labour charges for all operations etc, complete. for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Providing B.T Patch work for Pot Holes of depth ranging from 50mm to 70mm and above, using 40mm HBG metal with required quantity of 10-12 mm HBG machine crushed key chips and using 80/100 grade Bitumen at 42 kgs/1cum of work for filling the pot holes and cealing the filled up pot hole with a 15mm thick layer using 10-12mm size HBG crushed chips and 80/100 grade Bitumen at 72 Kgs/ 1 Cum, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand and including cost,seigniorage,conveyance of all material and labour charges for all operations etc, complete. for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Providing BT Patch work for Pot holes of depth ranging from 25 to 35mm using 20-25mm HBG chips with required quantity of 10-12mm HBG key chips and 80/100 Grade Bitumen at 72 Kgs per 1Cum of work for filling the pot holes and sealing the filled up pot hole including removal of loose material in the pot hole triing the edges to provide firm verticle faces cleaning applying tack coat filling pot hole compacting finishing and binding the surface using stone dust/sand including cost of mterials T&P and labour charges for all operations etc complete for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
White washing with white cement single coat including cost and conveyance of all materials to site and labour charges for all operations such as painting etc complete as directed by the engineer in charge for Pedamerangi Junction to Gadasingapuram Road from Km 0/0 to 18/600 (SH-087)
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Provision for engazing special labour for clearing of Debries, and culvert vents erection of sign boards etc for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
Providing/Engaging Earth moving machinery like Front End loder/JCB for clearence of excess berms and for providing chutes to drain off the rain water. for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Providing/Engaging Earth moving machinery like Front End loder/JCB for clearence of excess berms and for providing chutes to drain off the rain water.for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Providing/Engaging Earth moving machinery like Front End loder/JCB for clearence of excess berms and for providing chutes to drain off the rain water.for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
Provision for engaging engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work. for Thotapalli - Gunupuram Road from Km 18/000 to 39/800 (SH - 081)
Provision for engaging engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work. for Elwinpeta - Ramannaguda Road from Km 0/0 to 18/853(SH080)
Provision for engaging engaging Power Saw for clearing of fallen trees due to winds etc., complete including transportation charges, idle charges, cost of oils, crew charges etc., as directed by the Engineer-in-Charge of the work. for Kurupam - Muliguda Road from Km 0/0 to 23/100 (SH - 084)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT No.2 Particulars.xls
TENDER_DOCUMENT • 0.04 MB
NIT No.2 Sch-A.xlsm
TENDER_DOCUMENT • 0.04 MB
BOQItemswb NIT 2.xlsx
TENDER_DOCUMENT • 0.66 MB
NIT 2 Bid.doc
TENDER_DOCUMENT • 1.20 MB
Download all tender documents and submit your bid