Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC AMARPUR GOMATI DISTRICT TRIPURA | ₹5.9 L | 1 | Accepted-AOC AOC |
| 2 | 2₹6.3 LRejected-Finance N A | NA | NA | 121004 | ₹6.3 L | 2 | Rejected-Finance L2 |
Tender Value
₹7.9 L
EMD Value
₹15,800
Closing Date
5 Feb 2026, 3:00 pmClosed
Executive Engineer, Samagra Shiksha
o/o Executive Engineer, Samagra Shiksha
Construction of Dining Hall with seating arrangement at Laxman Para HS School, Killa Block Gomati District.
2026_OSDDS_69674_1
231/EE/ENGG.CELL/SAMAGRA/25-26
Open Tender
Civil Works
45 days
Laxman Para HS School, Killa Block
Please refer Tender Documents
6 documents required · 6 mandatory
₹1,000
₹15,800
5 Mar 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering finishing and reinforcement-All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
Centering shuttering including struttings, propping etc.and removal of form work for: a) Foundations, footings, bases for columns etc. for mass concrete with timber plank.
Centering shuttering including struttings, propping etc.and removal of form work for. b) Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply
Centering shuttering including struttings, propping etc.and removal of form work for:c) Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete. In cement mortar 1:4 ( 1 cement : 4 fine sand ).
Providing wood work in frames of doors,windows, clerestory windows and other frames,wrought framed and fixed in position. Local Teak Wood
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622 - 2017, of approved make, in all colours and shades, laid over 20mm thick cement mortar 1:4 (1 cement : 4 fine sand), jointing with grey cement slurry @3.3 kg/ sqm including grouting the joints with whitecement and matching pigments etc., complete.Double charged Stainfree vitrified tiles Size of tile 60x60 cm.
12 mm cement plaster of mix In cement mortar 1:3 ( 1 cement : 3 fine sand ).
Finishing walls with premium acrylic smooth exterior paint with Silicon additives of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : New work ( two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Finishing with Epoxy paint ( two or more coats) of approved brand and manufacture at all locations prepared and applied as per manufacturer's specification including appropriate priming coat, preparation of surface etc. complete [Payment shall be made after submission of Test Certificate issued by the Manufacturer].On steel work
Providing structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required.
Providing and fixing white vitreous china wash basin including making all connections but excluding the cost of fittings: Flat back wash basin of size 550x400mm.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, havingthermal stabilityfor hot&coldwatersupplyincludingallCPVCplain& brassthreadedfittingsincludingfixingthepipewith clampsat 1.00mspacing. This includes jointingof pipes&fittingswithonestepCPVC solvent cement and testingof joints complete asper directionof Engineer in Charge. 15 mm nominal outer dia .Pipes.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_70901.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
DNIeT.pdf
Tender Documents • 4.06 MB
BOQ_70901.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid