Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
5 Sept 2026, 10:00 am
Assistant Chief Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Setting up of Barrack, Qtr., Boundary wall, Ladies toilet and bathroom, Generator set etc. for Mondarmoni Coastal Police Station under Purba MDP Dist. (Balance work). (1st Call)
2026_WBPHI_5018219_1
WBPHIDCL/ACE/NIT- 17(e)/2026-2027
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
180 days
Refer to NIT
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.2 L
Yes
10 Aug 2026
10 Aug 2026
7 Sept 2026
10 Aug 2026
5 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works: Earth work in excavation of foundation trenches of drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils with in a lead of 75m. As directed. The item includes necessary trim-ming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete.
Depth of excavation not execeeding 1,500 mm | - | Cum | 142.15 | - |
| 2 | Earth work in excavation of foundation trenches of drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils with in a lead of 75m. As directed. The item includes necessary trim-ming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete.
Depth of Excavation for additional depth beyond 1500 mm and upto 3000 mm but not requiring Shoring | - | Cum | 229.28 | - |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layer not exceeding 150mm including watering and ramming etc. layer by layer complete
a) With earth obtained from excavation of foundation. | - | Cum | 92.41 | - |
| 4 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) .(B) Do - by fine sand | - | Cum | 1,015.09 | - |
| 5 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level, and filling joints with powered or local sand. | - | Sqm | 414.75 | - |
| 6 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety | - | Cum | 6,589.06 | - |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. a) Pakur Variety | - | Cum | 7,243.13 | - |
| 8 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In round floor and foundation.[using concrete mixture]
(b) M 25 Grade GROUND FLOOR | - | Cum | 7,842.93 | - |
| 9 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In round floor and foundation.[using concrete mixture]
(b) M 25 Grade FIRST FLOOR | - | Cum | 7,956.15 | - |
| 10 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In round floor and foundation.[using concrete mixture] (b) M 25 Grade
Second FLOOR | - | Cum | 8,069.37 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.20 MB
Tendernotice_3.pdf
PDF • 0.41 MB
Tendernotice_4.pdf
PDF • 2.42 MB
BOQ_5089088.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].